News/informational articles - CTA
- ️Mon Feb 24 2025
This page lists articles from all news categories on this website.
See also: Press Releases, Public Notices
Member of the press?
If you are a member of the media and need assistance, you can contact our Media Relations department at [email protected] or +1 312 681-3090.
Search our news and press releases.
Search results
Daily alley closures near W 108th Pl and W 109th St 02/24/2025
Soil boring and survey work will require daily alley closures in the alley west of 349 W 108th Place and 350 W 109th St Download Document
Daily alley closures 111th St and 111th Pl 02/24/2025
Soil boring and survey work will require temporary daily alley closures in the alley west of 349 W 111th St and 344 W 111th Pl. Download Document
Sidewalk closures W 113th and S Princeton 02/24/2025
The contractor will perform soil boring work, which will require temporary sidewalk closures during work hours. Download Document
East 130th St soil boring and survey work 02/24/2025
In preparation to build the Red Line Extension to 130th Street, crews will perform soil boring and survey work on E. 130th Street from S. Ellis Avenue to Bishop Ford (I-94) Expressway. Download Document
CTA and E-Squared Partner to Inspire Future Engineers in Chicago Public Schools 02/18/2025
In celebration of National Engineers Week, the Chicago Transit Authority (CTA) announced today that it is joining an initiative to bring CTA engineers into Chicago Public Schools (CPS) classrooms to ignite students’ enthusiasm for engineering. Read More about CTA and E-Squared Partner to Inspire Future Engineers in Chicago Public Schools
NEW DATES Special Notice For Construction Impacts at N. Wilton Avenue between W. School Street and W. Belmont Avenue for N Wilton Avenue will be northbound only during the dates stated above Download Document
NEW DATES Extended Alley Closure at the alley east of 3217 thru 3257 N. Sheffield Avenue 02/14/2025
NEW DATES Extended Alley Closure at the alley east of 3217 thru 3257 N. Sheffield Avenue for Brown Line Temporary Track & Structure Demolition, Shoring Tower Staging, Beam Erection, Concrete Placement, Winter Heating, Trackwork, & Noise Wall Installation. Download Document
NEW DATES Extended Alley Closure at the alley east of 938 W. School Street & 3301 thru 3349 N. Sheffield Avenue for Brown Line Temporary Track & Structure Demolition, Track Structure Rehabilitation, Track Column Construction, Beam Erection, Concrete Placement, Trackwork, & Noise Wall Installation. Download Document