CN101650565A - Automatic stereoscopic warehouse management system and method based on B/S framework - Google Patents
- ️Wed Feb 17 2010
Info
-
Publication number
- CN101650565A CN101650565A CN200910053824A CN200910053824A CN101650565A CN 101650565 A CN101650565 A CN 101650565A CN 200910053824 A CN200910053824 A CN 200910053824A CN 200910053824 A CN200910053824 A CN 200910053824A CN 101650565 A CN101650565 A CN 101650565A Authority
- CN
- China Prior art keywords
- monitoring
- framework
- server
- scheduling machine
- instruction Prior art date
- 2009-06-25 Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Computer And Data Communications (AREA)
- General Factory Administration (AREA)
Abstract
The invention relates to an automatic stereoscopic warehouse management system and a method based on a B/S framework, comprising at least one PLC control station which is connected with a monitoring dispatching exchange via an industrial Ethernet. The invention is characterized in that the monitoring dispatching exchange is connected with a server by the B/S framework, and at least one client machine is connected with the server by the B/S framework. The technical scheme of the method of the invention is to provide a method using the above management system, comprising the following steps: generating an order via the client machine, sending the order to the PLC control station for performing by the server and the monitoring dispatching exchange, and sending the performing result of the PLCcontrol station back to the server by the monitoring dispatching exchange for subsequent processing. The invention has the advantages of wide system distribution, favourable expansibility, high resource utilization ratio, convenient operation, convenient client end upgrading and maintenance and favourable compatibility, ensures that warehouse and logistic management is systemic, networked, informationalized and scientific, and improves the maintainability and the flexibility of the system.
Description
Technical field
The present invention relates to a kind of automatic stereowarehouse logistic management system and method, be used for automatic stereowarehouse, realize the networking and the systematization of warehousing management, promote the management level and the operational efficiency of warehouse logistics, belong to automatic stereowarehouse computer utility and management devices technical field.
Background technology
The warehouse logistics management system is the soul and the maincenter of automatic stereowarehouse, and it finishes the various tasks in the material information management, and its management level and operational efficiency have determined the management level of automatic material flow system.
Be illustrated in figure 1 as present automatic stereowarehouse logistic management system structural representation based on the C/S framework, it is divided into data Layer, administration and supervision authorities, supervisory layers and key-course, is made up of server, supervisor, monitoring equipment, PLC control station etc.The PLC control station links to each other with monitoring equipment by Industrial Ethernet, and monitoring equipment links to each other with supervisor by Ethernet, and supervisor links to each other with server by Ethernet.Wherein, data Layer charge server and data base administration, administration and supervision authorities are the goods yard management of being responsible for three-dimensional storehouse of WMS system, go into out work such as library management, inquiry form, inventory analysis, system maintenance, fault analysis; Supervisory layers is that the WMCS system is responsible for transmitting-receiving and schedule job instruction; Key-course is control and the operation that the PLC control station is responsible for field apparatus, and uploaded state and the information of finishing are given supervisory layers.
The automatic stereowarehouse logistic management system based on the C/S framework of current employing, it has advantages such as simple in structure, that the server operating load is light, data access is simple fast, specificity is strong, but that its shortcoming is poor compatibility, distribution capability is weak, to the client software and hardware configuration require with high investment big, development and maintenance cost is high.Current this mode based on the C/S framework is fairly simple, and the programing work amount is little, and is comparatively practical in the less small-sized tiered warehouse facility of data transfer amount.But it is not suitable in the large-scale tiered warehouse facility, when operation is frequent, the data transfer amount is big, network distributes extensively, the station client machine is difficult to use for a long time, along with the fast development of logistics informationization and networking, require system to develop especially towards the direction of networking distribution, network browsing operation and information sharing.
Summary of the invention
The purpose of this invention is to provide a kind of stereoscopic warehouse management system that can realize that networking distributes.
In order to achieve the above object, product technology scheme of the present invention has provided a kind of automatic stereoscopic warehouse management system based on the B/S framework, comprise at least one PLC control station, the PLC control station connects the monitoring and scheduling machine by Industrial Ethernet, it is characterized in that, the monitoring and scheduling machine links to each other with server with the B/S framework, and at least one client computer is by B/S framework Connection Service device.
Method and technology scheme of the present invention has provided a kind of management method, it is characterized in that, step is:
Step 1, user knock in instruction as required on client computer, by the B/S framework this instruction is sent to server by client computer;
Step 2, server are transmitted to the monitoring and scheduling machine by the B/S framework with instruction;
Step 3, monitoring and scheduling machine judge whether it is urgent job instruction, if not then buffer queue being sent in instruction, otherwise directly enter next step;
Step 4, monitoring and scheduling machine generate current job instruction and send to the interior PLC control station of piler, return operation message after the operation of PLC control station finishes and give the monitoring and scheduling machine, the monitoring and scheduling machine judges whether operation is successful, if unsuccessful then the monitoring and scheduling machine quits work and by jumping to step 6 after the artificial releasing fault, otherwise directly enter next step;
Step 5, monitoring and scheduling machine return messages are given server, and server carries out subsequent treatment to data after receiving message;
Step 6, monitoring and scheduling machine judge whether the buffer queue job instruction is all finished, if otherwise postpone to take out the instruction of next bar and jump to step 4 towards formation and continue to carry out, be then directly to enter next step;
Step 7, monitoring and scheduling machine buffer queue job instruction are all finished then and are finished, and wait for new job instruction.
Advantage of the present invention is, have system distribute wide, favorable expandability, resource utilization height, easy to operate, client upgrading and easy to maintenance, compatible characteristics such as good based on the automatic stereowarehouse logistic management system of B/S framework, make the warehouse logistics management more possess systematization, networking, informationization and scientific, improved the maintainability and the retractility of system.The present invention is easy to use, simple in structure, economical and practical, has application value widely.
Description of drawings
Fig. 1 is the automatic stereoscopic warehouse management system structural representation based on the C/S framework;
Fig. 2 is the automatic stereoscopic warehouse management system structural representation that the present invention is based on the B/S framework;
Fig. 3 is the automatic stereoscopic warehouse management system program flow diagram that the present invention is based on the B/S framework.
Embodiment
Specify the present invention below in conjunction with embodiment.
Embodiment
As shown in Figure 2, structural representation for a kind of automatic stereoscopic warehouse management system based on the B/S framework provided by the invention comprises the server of data management layer, some client computer of client operation layer, the monitoring and scheduling machine of monitoring and scheduling layer and some on-the-spot PLC control stations of key-course; The PLC control station links to each other with monitoring equipment by Industrial Ethernet, and the monitoring and scheduling machine links to each other with server by Ethernet, and client computer links to each other with server by Ethernet, forms the ethernet communication network; Use web services technologies and AJAX interfacing between monitoring and scheduling machine and the server and between server and the client computer based on the B/S framework, applications client access server database and logistic management system are realized the warehousing management of distributed clients machine web page browsing formula.
Before operation, on the server of data management layer, SQL database is installed, write and install application software and running environment such as WMS system, WMCS system, AJAX interface, issue WMS, WMCS and AJAX serve accordingly; On client operation layer distributed clients machine, set up B/S framework client, download and install JAVA plug-in component operation environment at user end to server; The WMCS operating software is installed on the monitoring and scheduling machine of monitoring and scheduling layer, is downloaded and install JAVA plug-in component operation environment.
As shown in Figure 3, invention the steps include: based on the automatic stereowarehouse logistic management system program flow diagram of B/S framework
Step 1, user knock in instruction as required on client computer, by the B/S framework this instruction is sent to server by client computer;
Step 2, server are transmitted to the monitoring and scheduling machine by the B/S framework with instruction;
Step 3, monitoring and scheduling machine judge whether it is urgent job instruction, if not then buffer queue being sent in instruction, otherwise directly enter next step;
Step 4, monitoring and scheduling machine generate current job instruction and send to the interior PLC control station of piler, return operation message after the operation of PLC control station finishes and give the monitoring and scheduling machine, the monitoring and scheduling machine judges whether operation is successful, if unsuccessful then the monitoring and scheduling machine quits work and by jumping to step 6 after the artificial releasing fault, otherwise directly enter next step;
Step 5, monitoring and scheduling machine return messages are given server, and server carries out subsequent treatment to data after receiving message;
Step 6, monitoring and scheduling machine judge whether the buffer queue job instruction is all finished, if otherwise postpone to take out the instruction of next bar and jump to step 4 towards formation and continue to carry out, be then directly to enter next step;
Step 7, monitoring and scheduling machine buffer queue job instruction are all finished then and are finished, and wait for new job instruction.
Claims (2)
1. automatic stereoscopic warehouse management system based on the B/S framework, comprise at least one PLC control station, the PLC control station connects the monitoring and scheduling machine by Industrial Ethernet, it is characterized in that, the monitoring and scheduling machine links to each other with server with the B/S framework, and at least one client computer is by B/S framework Connection Service device.
2. management method of utilizing the described a kind of automatic stereoscopic warehouse management system based on the B/S framework of claim 1 is characterized in that step is:
Step 1, user knock in instruction as required on client computer, by the B/S framework this instruction is sent to server by client computer;
Step 2, server are transmitted to the monitoring and scheduling machine by the B/S framework with instruction;
Step 3, monitoring and scheduling machine judge whether it is urgent job instruction, if not then buffer queue being sent in instruction, otherwise directly enter next step;
Step 4, monitoring and scheduling machine generate current job instruction and send to the interior PLC control station of piler, return operation message after the operation of PLC control station finishes and give the monitoring and scheduling machine, the monitoring and scheduling machine judges whether operation is successful, if unsuccessful then the monitoring and scheduling machine quits work and by jumping to step 6 after the artificial releasing fault, otherwise directly enter next step;
Step 5, monitoring and scheduling machine return messages are given server, and server carries out subsequent treatment to data after receiving message;
Step 6, monitoring and scheduling machine judge whether the buffer queue job instruction is all finished, if otherwise postpone to take out the instruction of next bar and jump to step 4 towards formation and continue to carry out, be then directly to enter next step;
Step 7, monitoring and scheduling machine buffer queue job instruction are all finished then and are finished, and wait for new job instruction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100538244A CN101650565B (en) | 2009-06-25 | 2009-06-25 | Automatic stereoscopic warehouse management system and method based on B/S framework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100538244A CN101650565B (en) | 2009-06-25 | 2009-06-25 | Automatic stereoscopic warehouse management system and method based on B/S framework |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101650565A true CN101650565A (en) | 2010-02-17 |
CN101650565B CN101650565B (en) | 2012-01-11 |
Family
ID=41672818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100538244A Active CN101650565B (en) | 2009-06-25 | 2009-06-25 | Automatic stereoscopic warehouse management system and method based on B/S framework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101650565B (en) |
Cited By (3)
* Cited by examiner, † Cited by third partyPublication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102298373A (en) * | 2011-06-30 | 2011-12-28 | 北京康拓红外技术有限公司 | Monitoring method and monitoring system of programmable logic controller (PLC) |
CN104317906A (en) * | 2014-10-27 | 2015-01-28 | 合肥星服信息科技有限责任公司 | Processing method for large-scale storage of reported data of GPS (global positioning system) monitoring radios |
CN104486405A (en) * | 2014-12-15 | 2015-04-01 | 张家港保税区长江国际港务有限公司 | Online warehouse service platform and equipment |
Family Cites Families (3)
* Cited by examiner, † Cited by third partyPublication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000158296A (en) * | 1998-11-27 | 2000-06-13 | Amada Co Ltd | Three-dimensional cutting network system |
CN101458512B (en) * | 2007-09-03 | 2010-10-27 | 上海精星仓储设备工程有限公司 | Instruction scheduling method for automatization tiered warehouse facility management control system |
CN101279668A (en) * | 2008-05-13 | 2008-10-08 | 广东生益科技股份有限公司 | Stereoscopic warehouse application system and application method thereof |
-
2009
- 2009-06-25 CN CN2009100538244A patent/CN101650565B/en active Active
Cited By (5)
* Cited by examiner, † Cited by third partyPublication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102298373A (en) * | 2011-06-30 | 2011-12-28 | 北京康拓红外技术有限公司 | Monitoring method and monitoring system of programmable logic controller (PLC) |
CN102298373B (en) * | 2011-06-30 | 2013-01-30 | 北京康拓红外技术股份有限公司 | Monitoring method and monitoring system of programmable logic controller (PLC) |
CN104317906A (en) * | 2014-10-27 | 2015-01-28 | 合肥星服信息科技有限责任公司 | Processing method for large-scale storage of reported data of GPS (global positioning system) monitoring radios |
CN104486405A (en) * | 2014-12-15 | 2015-04-01 | 张家港保税区长江国际港务有限公司 | Online warehouse service platform and equipment |
CN104486405B (en) * | 2014-12-15 | 2018-05-29 | 张家港保税区长江国际港务有限公司 | A kind of online Warehouse Service platform and equipment |
Also Published As
Publication number | Publication date |
---|---|
CN101650565B (en) | 2012-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106774192B (en) | 2019-01-08 | Heat treatment intelligence system and its control method based on MES |
CN107705045A (en) | 2018-02-16 | A kind of production logistics intelligent distribution AGV system and its application based on cloud website framework |
CN100477602C (en) | 2009-04-08 | A method for realizing the multi-task polling in the network management monitoring system |
CN110544061A (en) | 2019-12-06 | Material distribution method and system |
CN102495910A (en) | 2012-06-13 | Device and method for data timing synchronization of heterogeneous system |
CN109413141A (en) | 2019-03-01 | Access method and system between a kind of power grid boss station |
Delsing et al. | 2011 | A migration approach towards a SOA-based next generation process control and monitoring |
CN104636868A (en) | 2015-05-20 | Application management system for nuclear power station equipment maintenance information and application method thereof |
CN102420714A (en) | 2012-04-18 | Test management method, test management system master control center and test management system |
CN103810552A (en) | 2014-05-21 | Snack industry meal serving scheduling system |
CN102609808A (en) | 2012-07-25 | Method and device for performing energy consumption management on data center |
CN111967789B (en) | 2024-09-03 | Distribution automation terminal warehouse debugging system of transferring |
CN108009258A (en) | 2018-05-08 | It is a kind of can Configuration Online data collection and analysis platform |
CN103955185A (en) | 2014-07-30 | Immediate power distribution fault handling information interaction terminal and fault handling method thereof |
CN101650565B (en) | 2012-01-11 | Automatic stereoscopic warehouse management system and method based on B/S framework |
CN102236344B (en) | 2013-08-14 | Cloud computing-based motor vehicle energy management system and method |
CN108924228B (en) | 2022-11-04 | Industrial internet optimization system based on edge calculation |
CN104835004A (en) | 2015-08-12 | Guest room information management method and system |
CN113895935A (en) | 2022-01-07 | Control method and control system for full-automatic intelligent feeding equipment for chemical fiber POY (polyester pre-oriented yarn) spindles |
CN102830755B (en) | 2014-08-06 | Integrated soft intelligent equipment server for intelligent substation |
US9693318B1 (en) | 2017-06-27 | Multi-protocol load control |
CN111242492A (en) | 2020-06-05 | WebService-based resource aggregator regulation and control information interaction system and method |
CN113743847A (en) | 2021-12-03 | Rechecking method, device and system |
CN103559632A (en) | 2014-02-05 | Intelligent client visiting system |
CN201429794Y (en) | 2010-03-24 | Automation stereoscopic warehouse management device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
2010-02-17 | C06 | Publication | |
2010-02-17 | PB01 | Publication | |
2010-04-21 | C10 | Entry into substantive examination | |
2010-04-21 | SE01 | Entry into force of request for substantive examination | |
2012-01-11 | C14 | Grant of patent or utility model | |
2012-01-11 | GR01 | Patent grant |