CN104392392A - Intelligent text message operation method for information communication accident emergency disposal procedures of electric power system - Google Patents
- ️Wed Mar 04 2015
Info
-
Publication number
- CN104392392A CN104392392A CN201410659308.7A CN201410659308A CN104392392A CN 104392392 A CN104392392 A CN 104392392A CN 201410659308 A CN201410659308 A CN 201410659308A CN 104392392 A CN104392392 A CN 104392392A Authority
- CN
- China Prior art keywords
- charge
- person
- node
- accident
- text message Prior art date
- 2014-11-19 Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
电力系统信息通信事故应急处置流程短信智能操作方法,可以针对不同的应急流程设置发送节点,将每个节点的操作内容设置为可选项,利用短信内容作为操作指令,启动下一个节点流程,开展应急处置工作,缩短了应急事故的处理时间,极大地提升了工作效率,使各级各类决策人员可以把更多精力放在分析问题上来,提升了协同工作效率,同时方便领导快速决策,实现应急处置流程的规范性和及时性。
The intelligent operation method of SMS for the emergency response process of power system information communication accidents can set sending nodes for different emergency procedures, set the operation content of each node as an option, and use the SMS content as an operation command to start the next node process and carry out emergency response. Disposal work shortens the processing time of emergency accidents, greatly improves work efficiency, enables decision-makers at all levels and types to focus more on analyzing problems, improves the efficiency of collaborative work, and facilitates rapid decision-making by leaders to achieve emergency response The standardization and timeliness of the disposal process.
Description
技术领域technical field
本发明属于电力系统事故处理方法技术领域,涉及到电力系统信息通信事故应急处置流程短信智能操作方法。The invention belongs to the technical field of power system accident handling methods, and relates to a short message intelligent operation method for the emergency handling process of power system information communication accidents.
背景技术Background technique
电力系统是指由发电、输电、变电、配电和用电等环节组成的电能生产与消费系统,为实现这一功能,电力系统在各个环节和不同层次还具有相应的信息与控制系统,对电能的生产过程进行测量、调节、控制、保护、通信和调度,以保证用户获得安全、经济、优质的电能。电力系统的出现,使电能得到广泛应用,而且随着科技进步和社会发展,电能的应用不仅深刻地影响着社会物质生产的各个侧面,也越来越广地渗透到人类日常生活的各个层面,所以电力系统的覆盖范围也越来越广。电力系统的安全运行涉及到各行各业,涉及到千家万户居民的日常生活,关乎社会稳定和国家安全,当电力系统信息通信事故发送时,快速解决问题,使电力系统恢复使用,保障各行各业的正常生产和运营,保障居民正常的生产生活,是供电企业和电力抢修部门的重要职责,但是如何快速地解决问题,提升应急事故的处理能力是供电企业和电力抢修部门的一个难点。The power system refers to the power production and consumption system composed of power generation, power transmission, power transformation, power distribution and power consumption. In order to realize this function, the power system also has corresponding information and control systems in each link and at different levels. Measure, adjust, control, protect, communicate and dispatch the production process of electric energy to ensure that users obtain safe, economical and high-quality electric energy. The emergence of the power system has made electric energy widely used, and with the advancement of science and technology and social development, the application of electric energy not only profoundly affects all aspects of social material production, but also penetrates more and more into all aspects of human daily life. Therefore, the coverage of the power system is getting wider and wider. The safe operation of the power system involves all walks of life, involves the daily life of thousands of households, and is related to social stability and national security. When a power system information communication accident is sent, the problem can be quickly solved, the power system can be restored, and all walks of life can be guaranteed. It is an important responsibility of power supply companies and power repair departments to ensure the normal production and operation of the industry and ensure the normal production and life of residents. However, how to quickly solve problems and improve the handling capacity of emergency accidents is a difficult point for power supply companies and power repair departments.
发明内容Contents of the invention
本发明为了克服现有技术的缺陷,设计了电力系统信息通信事故应急处置流程短信智能操作方法,各级人员可以通过发送短信启动应急处置流程,开展应急处置工作,缩短了应急事故的处理时间,提升了协同工作效率,同时方便领导快速决策。In order to overcome the defects of the prior art, the present invention designs a short message intelligent operation method for the emergency treatment process of the power system information communication accident, and personnel at all levels can start the emergency treatment process by sending a short message, and carry out the emergency treatment work, shortening the processing time of the emergency accident, Improve the efficiency of collaborative work, and at the same time facilitate the rapid decision-making of leaders.
本发明所采取的具体技术方案是:电力系统信息通信事故应急处置流程短信智能操作方法,关键是:所述的方法包括以下步骤:The specific technical solution adopted by the present invention is: the short message intelligent operation method of the power system information communication accident emergency response process, the key is: the method includes the following steps:
a、电力系统信息通信事故发生时,调控中心首先根据事故情况确认事故种类,根据事故种类选择相应的应急处置流程,然后发送初始短信给此应急处置流程的第一节点负责人;a. When a power system information communication accident occurs, the control center first confirms the type of the accident according to the accident situation, selects the corresponding emergency response process according to the type of accident, and then sends an initial text message to the person in charge of the first node of the emergency response process;
b、第一节点负责人接收到调控中心发来的初始短信后,根据初始短信内容分析事故原因,然后发送第一处理短信给该应急处置流程的第二节点负责人;b. After receiving the initial text message sent by the control center, the person in charge of the first node analyzes the cause of the accident according to the content of the initial text message, and then sends the first processing text message to the person in charge of the second node of the emergency handling process;
c、第二节点负责人接收到第一节点负责人发来的第一处理短信后,根据第一处理短信内容确认事故原因,然后发送第二处理短信给该应急处置流程的第三节点负责人;c. After the person in charge of the second node receives the first processing message sent by the person in charge of the first node, he confirms the cause of the accident according to the content of the first processing message, and then sends the second processing message to the person in charge of the third node in the emergency handling process ;
d、第三节点负责人接收到第二节点负责人发来的第二处理短信后,到现场解决事故,使电力系统恢复使用;d. After receiving the second processing text message sent by the person in charge of the second node, the person in charge of the third node goes to the scene to solve the accident and restore the power system to use;
e、应急处置流程结束,第三节点负责人发送反馈信息给第一节点负责人,说明事故已解决。e. The emergency response process is over, and the person in charge of the third node sends feedback information to the person in charge of the first node, indicating that the accident has been resolved.
所述的各个应急处置流程中第二节点负责人的数量为多个,第一个负责人接收第一节点负责人发来的第一处理短信,分析后发送短信给第二个负责人,第二个负责人分析后再发给第三个负责人,依次往下传,最后一个负责人发送第二处理短信给该流程的第三节点负责人。The number of persons in charge of the second node in each of the described emergency handling procedures is multiple. The first person in charge receives the first processing text message sent by the person in charge of the first node, and sends a text message to the second person in charge after analysis. After the analysis by the two persons in charge, it is sent to the third person in charge, and then transmitted down in turn, and the last person in charge sends the second processing short message to the person in charge of the third node of the process.
本发明的有益效果是:可以针对不同的应急流程设置发送节点,将每个节点的操作内容设置为可选项,利用短信内容作为操作指令,启动下一个节点流程,开展应急处置工作,缩短了应急事故的处理时间,极大地提升了工作效率,使各级各类决策人员可以把更多精力放在分析问题上来,提升了协同工作效率,同时方便领导快速决策,实现应急处置流程的规范性和及时性。The beneficial effects of the present invention are: the sending nodes can be set according to different emergency procedures, the operation content of each node can be set as an option, and the content of the short message can be used as an operation instruction to start the next node procedure to carry out emergency disposal work, shortening the emergency response time. The processing time of the accident has greatly improved work efficiency, enabling decision-makers at all levels and types to focus more on analyzing problems, improving the efficiency of collaborative work, and at the same time facilitating rapid decision-making by leaders, realizing the standardization and integrity of the emergency response process. timeliness.
附图说明Description of drawings
图1为本发明的应急处理流程示意图。Fig. 1 is a schematic diagram of the emergency treatment process of the present invention.
具体实施方式Detailed ways
电力系统信息通信事故应急处置流程短信智能操作方法,包括以下步骤:The short message intelligent operation method of the power system information communication accident emergency response process includes the following steps:
a、电力系统信息通信事故发生时,调控中心首先根据事故情况确认事故种类,根据事故种类选择相应的应急处置流程,然后发送初始短信给此应急处置流程的第一节点负责人;a. When a power system information communication accident occurs, the control center first confirms the type of the accident according to the accident situation, selects the corresponding emergency response process according to the type of accident, and then sends an initial text message to the person in charge of the first node of the emergency response process;
b、第一节点负责人接收到调控中心发来的初始短信后,根据初始短信内容分析事故原因,然后发送第一处理短信给该应急处置流程的第二节点负责人;b. After receiving the initial text message sent by the control center, the person in charge of the first node analyzes the cause of the accident according to the content of the initial text message, and then sends the first processing text message to the person in charge of the second node of the emergency handling process;
c、第二节点负责人接收到第一节点负责人发来的第一处理短信后,根据第一处理短信内容确认事故原因,然后发送第二处理短信给该应急处置流程的第三节点负责人;c. After the person in charge of the second node receives the first processing message sent by the person in charge of the first node, he confirms the cause of the accident according to the content of the first processing message, and then sends the second processing message to the person in charge of the third node in the emergency handling process ;
d、第三节点负责人接收到第二节点负责人发来的第二处理短信后,到现场解决事故,使电力系统恢复使用;d. After receiving the second processing text message sent by the person in charge of the second node, the person in charge of the third node goes to the scene to solve the accident and restore the power system to use;
e、应急处置流程结束,第三节点负责人发送反馈信息给第一节点负责人,说明事故已解决。e. The emergency response process is over, and the person in charge of the third node sends feedback information to the person in charge of the first node, indicating that the accident has been resolved.
所述的各个应急处置流程中第二节点负责人的数量为多个,第一个负责人接收第一节点负责人发来的第一处理短信,分析后发送短信给第二个负责人,第二个负责人分析后再发给第三个负责人,依次往下传,最后一个负责人发送第二处理短信给该流程的第三节点负责人。第二节点负责人的数量根据具体的应急处置流程设定,不同的应急处置流程所需第二节点负责人的数量也不同。The number of persons in charge of the second node in each of the described emergency handling procedures is multiple. The first person in charge receives the first processing text message sent by the person in charge of the first node, and sends a text message to the second person in charge after analysis. After the analysis by the two persons in charge, it is sent to the third person in charge, and then transmitted down in turn, and the last person in charge sends the second processing short message to the person in charge of the third node of the process. The number of persons in charge of the second node is set according to the specific emergency handling process, and the number of persons in charge of the second node required by different emergency handling processes is also different.
本发明中的方法可以根据不同的应急处置流程,建立相应的流程模型,并能随时添加新的应急处置流程,根据流程变化而灵活设置节点,每个节点可设置相应的操作内容,每个节点负责人可以根据上一节点负责人发送的信息来选择自己应该发送给下一节点负责人的内容,依次往下传,直至电力系统信息通信事故解决,电力系统恢复使用。The method in the present invention can establish corresponding process models according to different emergency treatment processes, and can add new emergency treatment processes at any time, and flexibly set nodes according to process changes, and each node can set corresponding operation content. The person in charge can choose the content that he should send to the person in charge of the next node according to the information sent by the person in charge of the previous node, and transmit it down one by one until the information communication accident of the power system is resolved and the power system is restored to use.
调控中心可以对所记录的信息进行筛选,可以根据严重性级别、系统名称类别、优先级级别、问题类别等进行细化筛选,筛选过的信息插入数据库再通过短信插件发送出去。可以对过久的历史信息进行清除,减少占用的空间。也可以添加收件人的相关信息,主要是添加、修改或删除各个节点负责人的手机号,也可以新建一个组,实现其它业务的需求。The control center can filter the recorded information, which can be refined and filtered according to the severity level, system name category, priority level, problem category, etc., and the filtered information is inserted into the database and sent out through the SMS plug-in. The long history information can be cleared to reduce the occupied space. It is also possible to add relevant information of the recipient, mainly to add, modify or delete the mobile phone number of the person in charge of each node, or to create a new group to meet other business needs.
Claims (2)
1.电力系统信息通信事故应急处置流程短信智能操作方法,其特征在于:所述的方法包括以下步骤:1. The short message intelligent operation method of the power system information communication accident emergency response process, characterized in that: the method includes the following steps: a、电力系统信息通信事故发生时,调控中心首先根据事故情况确认事故种类,根据事故种类选择相应的应急处置流程,然后发送初始短信给此应急处置流程的第一节点负责人;a. When a power system information communication accident occurs, the control center first confirms the type of the accident according to the accident situation, selects the corresponding emergency response process according to the type of accident, and then sends an initial text message to the person in charge of the first node of the emergency response process; b、第一节点负责人接收到调控中心发来的初始短信后,根据初始短信内容分析事故原因,然后发送第一处理短信给该应急处置流程的第二节点负责人;b. After receiving the initial text message sent by the control center, the person in charge of the first node analyzes the cause of the accident according to the content of the initial text message, and then sends the first processing text message to the person in charge of the second node of the emergency handling process; c、第二节点负责人接收到第一节点负责人发来的第一处理短信后,根据第一处理短信内容确认事故原因,然后发送第二处理短信给该应急处置流程的第三节点负责人;c. After the person in charge of the second node receives the first processing message sent by the person in charge of the first node, he confirms the cause of the accident according to the content of the first processing message, and then sends the second processing message to the person in charge of the third node in the emergency handling process ; d、第三节点负责人接收到第二节点负责人发来的第二处理短信后,到现场解决事故,使电力系统恢复使用;d. After receiving the second processing text message sent by the person in charge of the second node, the person in charge of the third node goes to the scene to solve the accident and restore the power system to use; e、应急处置流程结束,第三节点负责人发送反馈信息给第一节点负责人,说明事故已解决。e. The emergency response process is over, and the person in charge of the third node sends feedback information to the person in charge of the first node, indicating that the accident has been resolved. 2.根据权利要求1所述的电力系统信息通信事故应急处置流程短信智能操作方法,其特征在于:所述的各个应急处置流程中第二节点负责人的数量为多个,第一个负责人接收第一节点负责人发来的第一处理短信,分析后发送短信给第二个负责人,第二个负责人分析后再发给第三个负责人,依次往下传,最后一个负责人发送第二处理短信给该流程的第三节点负责人。2. The short message intelligent operation method for power system information communication accident emergency response process according to claim 1, characterized in that: in each of the emergency response processes, there are multiple persons in charge of the second node, and the first person in charge Receive the first processing text message sent by the person in charge of the first node, send the text message to the second person in charge after analysis, and send it to the third person in charge after analysis by the second person in charge, and then pass it down in turn, and the last person in charge Send the second processing short message to the person in charge of the third node of the process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410659308.7A CN104392392A (en) | 2014-11-19 | 2014-11-19 | Intelligent text message operation method for information communication accident emergency disposal procedures of electric power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410659308.7A CN104392392A (en) | 2014-11-19 | 2014-11-19 | Intelligent text message operation method for information communication accident emergency disposal procedures of electric power system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104392392A true CN104392392A (en) | 2015-03-04 |
Family
ID=52610290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410659308.7A Pending CN104392392A (en) | 2014-11-19 | 2014-11-19 | Intelligent text message operation method for information communication accident emergency disposal procedures of electric power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104392392A (en) |
Cited By (1)
* Cited by examiner, † Cited by third partyPublication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105427030A (en) * | 2015-11-06 | 2016-03-23 | 中国南方电网有限责任公司 | Differentiation processing method and system of early warning information |
Citations (5)
* Cited by examiner, † Cited by third partyPublication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101478441A (en) * | 2009-02-03 | 2009-07-08 | 江西省电力信息通讯有限公司 | Electric communication operation support and emergency command system |
WO2011055201A1 (en) * | 2009-11-06 | 2011-05-12 | パナソニック電工株式会社 | Electric power monitoring device |
US20120271474A1 (en) * | 2009-10-05 | 2012-10-25 | Panasonic Corporation | Electric power distribution system |
CN103544530A (en) * | 2013-11-05 | 2014-01-29 | 北京四方继保自动化股份有限公司 | Self-healing incident automatic informing method for smart distribution grid |
CN104036374A (en) * | 2014-07-08 | 2014-09-10 | 国网辽宁省电力有限公司 | Method for assisting in disposing operating accidents of power grid |
-
2014
- 2014-11-19 CN CN201410659308.7A patent/CN104392392A/en active Pending
Patent Citations (5)
* Cited by examiner, † Cited by third partyPublication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101478441A (en) * | 2009-02-03 | 2009-07-08 | 江西省电力信息通讯有限公司 | Electric communication operation support and emergency command system |
US20120271474A1 (en) * | 2009-10-05 | 2012-10-25 | Panasonic Corporation | Electric power distribution system |
WO2011055201A1 (en) * | 2009-11-06 | 2011-05-12 | パナソニック電工株式会社 | Electric power monitoring device |
CN103544530A (en) * | 2013-11-05 | 2014-01-29 | 北京四方继保自动化股份有限公司 | Self-healing incident automatic informing method for smart distribution grid |
CN104036374A (en) * | 2014-07-08 | 2014-09-10 | 国网辽宁省电力有限公司 | Method for assisting in disposing operating accidents of power grid |
Cited By (2)
* Cited by examiner, † Cited by third partyPublication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105427030A (en) * | 2015-11-06 | 2016-03-23 | 中国南方电网有限责任公司 | Differentiation processing method and system of early warning information |
CN105427030B (en) * | 2015-11-06 | 2017-04-05 | 中国南方电网有限责任公司 | A kind of differentiation processing method of early warning information and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206207751U (en) | 2017-05-31 | A kind of WiFi water heaters of use multi-protocols |
CN104346663A (en) | 2015-02-11 | Contract approval method based on workflow |
CN105100252A (en) | 2015-11-25 | Network topology structure of distributed power monitoring system |
CN104243612A (en) | 2014-12-24 | Water conservancy construction personnel safety guarantee information management system and method |
CN104460607A (en) | 2015-03-25 | Production system graphic ticketing method based on simulated rehearsal |
CN110175741A (en) | 2019-08-27 | A kind of information value chain construction method and storage medium based on power industry |
CN104467176A (en) | 2015-03-25 | Power grid online monitoring method and system |
CN106100934B (en) | 2019-03-15 | A substation information monitoring system and method based on EMS fault alarm |
CN104392392A (en) | 2015-03-04 | Intelligent text message operation method for information communication accident emergency disposal procedures of electric power system |
CN104333131A (en) | 2015-02-04 | Method for establishing prefecture and county power grid regulation data integration |
CN104102202A (en) | 2014-10-15 | Modernized smart grid-based regulation and control emergency command handling method |
CN104182818B (en) | 2017-03-15 | A kind of method and system of substation information intelligence automatic data collection |
WO2017107358A1 (en) | 2017-06-29 | Method for controlling power flow of chained stable tie-lines of power grid, and server |
CN104317868B (en) | 2017-12-15 | A kind of regulation and control integral method based on single preposition more SCADA applications |
Tantri et al. | 2019 | Modeling a simulation for sociotechnical resilience |
CN102868226A (en) | 2013-01-09 | Implementation method for electronic command distribution between electric power dispatching and monitoring |
CN104539647A (en) | 2015-04-22 | Integrated control platform for safe power supply and consumption of important and high-risk clients |
CN205721963U (en) | 2016-11-23 | A kind of Condition-based Maintenance of Substation Equipment operation management system based on Quick Response Code mobile interchange technology |
CN204258439U (en) | 2015-04-08 | Intelligent electric power scheduling operation management system |
CN202475484U (en) | 2012-10-03 | Internet of Things protocol converting device |
Braa et al. | 2010 | Sustainable mobile information infrastructures in low resource settings |
CN110163765A (en) | 2019-08-23 | A kind of wisdom cloud computing method of energy combustion gas cooling-heating treatment (confession) system |
CN204390011U (en) | 2015-06-10 | A kind of power information control of intelligent terminal |
CN104009859A (en) | 2014-08-27 | Operation work order automatic processing method based on monitoring information |
CN206963087U (en) | 2018-02-02 | A kind of distribution transformer monitoring and metering terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
2015-03-04 | C06 | Publication | |
2015-03-04 | PB01 | Publication | |
2015-04-01 | C10 | Entry into substantive examination | |
2015-04-01 | SE01 | Entry into force of request for substantive examination | |
2018-08-14 | RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150304 |
2018-08-14 | RJ01 | Rejection of invention patent application after publication |