CN106850313A - The optimization method and device of household appliance control network building plan - Google Patents
- ️Tue Jun 13 2017
The content of the invention
It is a primary object of the present invention to provide a kind of optimization method and device of household appliance control network building plan, it is intended to Solve the problems, such as that current Internet of Things network topology mode causes Internet of Things net layout intelligence degree and poor accuracy.
To achieve the above object, a kind of optimization method of household appliance control network building plan that the present invention is provided, including step Suddenly:
Obtain floor plan, internet of things home appliance equipment installation site and the networking of structure in advance of user place of abode Scheme;
Networking scheme according to the advance structure marks network equipment position in floor plan;
Built in advance according to home appliance installation site, floor plan and the network equipment position optimization for having marked Networking scheme, and export the networking scheme after optimization.
Preferably, it is described according to home appliance installation site, floor plan and the network equipment position optimization net for having marked Network building plan includes:
Physical relation between each home appliance is determined according to home appliance installation site and floor plan;
According to the physical relation and the adjustment information of the network equipment position calculating network equipment for having marked;
It is described to optimize according to the position of the network equipment in the networking scheme that adjustment information adjustment builds in advance The networking scheme for building in advance.
Preferably, the floor plan for obtaining user place of abode, internet of things home appliance equipment installation site and advance structure Before the networking scheme built, also include:
Place of abode selection instruction is received, and obtains the place of abode information of selection;
The corresponding floor plan information of the place of abode information is obtained from big data platform, and obtains the place of abode Home appliance information;
The networking scheme of home wiring control is generated according to the floor plan information and the home appliance information, will be generated Networking scheme as the advance networking scheme for building.
Preferably, the networking that home wiring control is generated according to the floor plan information and the home appliance information Scheme includes:
The physics between house type information and each house area according to the floor plan information extraction each house area is closed System, and the home appliance placement information of each house area is determined according to the physical relation;
House type information according to being extracted calculates the household area of each house area;
Taken according to the network that the household area, home appliance placement information and the physical relation generate home wiring control Build scheme.
Preferably, it is described according to home appliance installation site, floor plan and the network equipment position optimization institute for having marked The networking scheme of advance structure is stated, and after exporting the networking scheme after optimization, is also included:
Receive the adjust instruction to the networking scheme for exporting;
The mode of building according to corresponding networking unit in the adjust instruction regulating networks building plan is formed newly Networking scheme.
Additionally, to achieve the above object, the present invention also provides a kind of optimization device of household appliance control network building plan, wrap Include:
Acquisition module, for obtaining the floor plan of user place of abode, internet of things home appliance equipment installation site and in advance The networking scheme of structure;;
Labeling module, for marking network equipment position in floor plan according to the networking scheme of the advance structure Put;
Optimization module, for according to home appliance installation site, floor plan and the network equipment position optimization for having marked The networking scheme of the advance structure;
Output module, for exporting the networking scheme after optimization.
Preferably, the optimization module includes:
Second determining unit, for being determined between each home appliance according to home appliance installation site and floor plan Physical relation;
Second computing unit, for according to the physical relation and the network equipment position calculating network equipment for having marked Adjustment information;
Optimization unit, for the position according to the network equipment in adjustment information adjustment in advance networking scheme of structure Put, to optimize the networking scheme of the advance structure.
Preferably, described device also includes:
Receiver module, for receiving place of abode selection instruction;
The acquisition module, is additionally operable to obtain the place of abode information of selection;Acquisition module, is additionally operable to
The corresponding floor plan information of the place of abode information is obtained from big data platform, and obtains the place of abode Home appliance information;
Generation module, is additionally operable to be generated according to the floor plan information and the home appliance information network of home wiring control Building plan, networking scheme of the networking scheme that will be generated as advance structure.
Preferably, the generation module includes:
Extraction unit, for the house type information according to the floor plan information extraction each house area and each household area Physical relation between domain;
First determining unit, the home appliance placement information for determining each house area according to the physical relation;
First computing unit, the household area for calculating each house area according to the house type information extracted;
Generation unit, for generating house according to the household area, home appliance placement information and the physical relation The networking scheme of electric control.
Preferably, described device also includes:Update module,
The receiver module, is additionally operable to receive the adjust instruction to the networking scheme for exporting;
The update module, for according to corresponding networking unit in the adjust instruction regulating networks building plan The mode of building form new networking scheme
The present invention is by the net that obtains place of abode floor plan information, internet of things home appliance equipment installation site and build in advance Network building plan, marks network equipment position, home appliance installation site in floor plan, position and network according to mark Coverage adjusts network equipment position or increases the network equipment, to the advance networking project setting for building, it is ensured that all Home appliance is in network control range, optimizes networking scheme.Optimize the structure networking according to the actual requirements Scheme, there is provided the network plan that family's home appliance Internet of Things of the more reasonable, degree of accuracy is controlled, it is to avoid where internet of things home appliance Local Area Network is not covered or jitter, it will cause the internet of things home appliance can not normally to use internet of things functional, improves thing Networking layout intelligence degree and the degree of accuracy.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The present invention provides a kind of optimization method of household appliance control network building plan.
Reference picture 1, Fig. 1 shows for the flow of the first embodiment of the optimization method of present inventor's electric control networking scheme It is intended to.
In one embodiment, the optimization method of the household appliance control network building plan includes:
Step S10, obtains floor plan, internet of things home appliance equipment installation site and the advance structure of user place of abode Networking scheme;
In the present embodiment, with reference to Fig. 2, the mode of the networking scheme for building in advance includes:
Step S101, receives place of abode selection instruction, and obtain the place of abode information of selection;
In the present embodiment, there is provided network struction interface, the network structure of the household electrical appliances Internet of Things of structure family is needed in user When building, start Web architecture, into network struction interface.According to prompting, input place of abode or offer select menu, supply User selects place of abode, receives place of abode selection instruction, and obtain the place of abode information of selection.In order to improve intellectuality Degree, obtains the environment residing for user, and Web architecture is started according to residing environment, for example, what 1) user entered is new Cell, and inquire the house property purchase information that user has;2) network of user expires;3) detected Internet of Things household without Network signal.
In an embodiment of the present invention, after network struction interface is entered, point out user to open positioning, opened in positioning When, positioned by the alignment system position current to user and be used as place of abode.
Step S102, obtains the corresponding floor plan information of the place of abode information, and obtain described from big data platform The home appliance information of place of abode;
The place of abode information such as building generic term for a building, e. g. Apartment, store, a movie theater, etc., unit number, floor, room number of each cell and family are prestored in big data platform Type figure information.After the place of abode information for getting subscriber household, by the place of abode information of the subscriber household send to Big data platform inquires about floor plan information corresponding with the place of abode information of the subscriber household, acquisition request floor plan letter Breath, big data platform is according to the floor plan information inquiry for prestoring to house type corresponding with the place of abode information of the subscriber household Figure information.The floor plan information that big data platform will be inquired is sent to the request end of acquisition request floor plan information, request end The floor plan information that big data platform sends is received, as the floor plan information that the big data platform for obtaining is inquired about.Obtaining family While type figure information or before or after, obtain the home appliance information of the place of abode.In the place of abode When being mounted with home appliance, storage end (big data platform, the mobile terminal of home appliance information can be installed from storage Or desktop computer etc.) home appliance information is got, or set by the Internet of Things household that camera gathers each house area Standby information, home appliance information of the home equipment information that will be gathered as the place of abode, i.e. by installed in residence The camera collection home appliance information of point.When not installing or not buying home appliance, can get in the following manner Home appliance information.
Specifically, with reference to Fig. 3, the mode for obtaining home appliance information includes:
Step S1021, when consumer enters internet of things home appliance shopping guide interface, the selection for receiving internet of things home appliance equipment refers to Order;According to the purchase order of the selection instruction product internet-accessing electric appliance;
Step S1022, after the completion of the delivery operation of the purchase order, obtains the corresponding Internet of Things of the purchase order Home appliance as the place of abode home appliance information.
When user does not buy or does not arrange home appliance, consumer (user) enters internet of things home appliance shopping guide circle Face, the home appliance of purchase needed for selection, home appliance is bought by Internet of Things shopping guide interface, generates household electrical appliances purchase order, Order pays and completes, i.e. after user confirms to buy which home appliance and complete transaction operation, obtain the purchase order Corresponding internet of things home appliance equipment as the place of abode home appliance information.
Step S103, the networking side of home wiring control is generated according to the floor plan information and the home appliance information Case.
After the home appliance information of floor plan information and the place of abode is got, can be obtained from floor plan information The room unit and layout situation of subscriber household, can obtain required from the situation of room unit and layout situation combination home appliance Internet of Things layout scenarios, which room needed by Internet of Things control, and which household electrical appliances needs the control of Internet of Things, respectively in room Between which position.That is, can be controlled according to required for the floor plan information and the home appliance information determine Internet of Things Region, the control area needed for automatically generating family's Internet of Things, such as parlor, study and/or bedroom.Obtaining required control Behind region processed, the networking scheme of home wiring control is generated with required control area, the networking scheme includes net The installation site of network access device, wired route on-position, wireless routing on-position, WiFi wirelessly turns blue-tooth radio equipment Installation site, continued access wireless routing on-position etc..
In an embodiment of the present invention, it is described to be set according to the floor plan information and the household electrical appliances specifically, with reference to Fig. 4 The networking scheme of standby information generation home wiring control includes:
Step S1031, according to the house type information and each house area of the floor plan information extraction each house area Between physical relation, and the home appliance placement information of each house area is determined according to the physical relation;
Step S1032, the household area of each house area is calculated according to the house type information extracted;
Step S1033, generates house automatically controlled according to the household area, home appliance placement information and the physical relation The networking scheme of system.After floor plan is got, the house type of each house area is extracted from the floor plan information for obtaining Information and each interregional physical relation, house area is the region that each separates, for example, kitchen, bedroom, parlor, study Deng.Each interregional physical relation is adjacent and distance relation, for example, bedroom is connected with parlor, study is connected with bedroom, book The ultimate range of ultimate range, bedroom and study in room and parlor etc., and each household area can be determined according to the physical relation The home appliance placement information in domain.That is, determine specifically to need control with reference to the physical relation between floor plan information and house type Physical relation between the layout information of the home appliance of system, control home appliance needed for obtaining.Floor plan information can be roomed The mark of length, width, the household area of each house area can be calculated according to these information, according to the household area, family Electric equipment placement information and the physical relation generate the networking scheme of home wiring control.That is, signal and space are being ensured On the premise of, each builds the position of parameter in reasonable arrangement network, obtains more rational networking scheme.By house type The physical relation of the physical relation of figure and the layout of home appliance, further determines that networking scheme.
Floor plan information, the networking scheme of place of abode are got through the above way, and the network of generation is taken Scheme is built as the advance networking scheme for building.Installation site of the home appliance in place of abode is obtained, for example, can basis The household electrical appliances installation site of user input obtains installation site of the home appliance in place of abode;Or shoot inside place of abode Image, the home appliance installation site of place of abode is obtained according to image.
Step S20, the networking scheme according to the advance structure marks network equipment position in floor plan;
After the networking scheme and the floor plan information of place of abode for getting advance structure, in the floor plan Mark network equipment position, to determine which position can have the network coverage, which home appliance in the coverage of network, Which home appliance is in outside network range, and the network of which home appliance is good, and the network of which home appliance is poor.
Step S30, it is pre- according to home appliance installation site, floor plan and the network equipment position optimization for having marked The networking scheme for first building, and export the networking scheme after optimization.
Built in advance described in installation site, floor plan according to home appliance and the network equipment position optimization for having marked Networking scheme, i.e. network equipment position marked out in floor plan come after, it may be determined which home appliance no longer net In network coverage, the network of which home appliance is relatively good, can for floor plan and the network equipment mark situation and Home appliance installation site adjusts networking scheme, it is ensured that all home appliances are all in network coverage, or showing The scope of technically increasing network coverage having, increases network transferring equipment (for example, router etc.) come scope of increasing network coverage.
It is described according to home appliance installation site, floor plan and the network equipment for having marked position specifically, with reference to Fig. 5 Putting optimization networking scheme includes:
Step S31, the physical relation between each home appliance is determined according to home appliance installation site and floor plan;
Step S32, the adjustment letter according to the physical relation and the network equipment position calculating network equipment for having marked Breath;
Step S33, the position of the network equipment in the networking scheme according to the advance structure of adjustment information adjustment, with Optimize the networking scheme of the advance structure.Specifically, network coverage and household electrical appliances can be marked in floor plan The network equipment position of equipment installation site and the networking scheme for building in advance, obtains the physics between each home appliance Relation, adjustment information according to the physical relation and the network equipment position calculating network equipment for having marked simultaneously shows adjustment Information.It is straight according to the adjustment information (network equipment position, home appliance position and network coverage) shown in floor plan Connect and adjust, optimize the networking scheme of the advance structure, and export the networking scheme after optimization.
The present embodiment is by obtaining place of abode floor plan information, internet of things home appliance equipment installation site and building in advance Networking scheme, marks network equipment position, home appliance installation site in floor plan, position and net according to mark Network coverage adjusts network equipment position or increases the network equipment, to the advance networking project setting for building, it is ensured that institute There is home appliance to be in network control range, optimize networking scheme.According to the actual requirements come optimize build network take Build scheme, there is provided the network plan that family's home appliance Internet of Things of the more reasonable, degree of accuracy is controlled, it is to avoid internet of things home appliance institute Do not covered or jitter in Local Area Network, it will cause the internet of things home appliance can not normally to use internet of things functional, improved Internet of Things net layout intelligence degree and the degree of accuracy.
It is described according to home appliance installation site, floor plan and with reference to Fig. 6 in a preferred embodiment of the present invention Described in the network equipment position optimization of mark in advance build networking scheme, and export optimization after networking scheme it Afterwards, also include:
Step S40, exports the networking scheme of generated home wiring control;
Step S50, receives the adjust instruction to the networking scheme for exporting;
Step S60, according to the side of building of corresponding networking unit in the adjust instruction regulating networks building plan Formula forms new networking scheme.
In the present embodiment, the difference with above-described embodiment is, after networking scheme is optimized, according to user's need Ask, i.e. the instruction that user sends is made adjustment to the automatic networking scheme for building.Household electrical appliances are being generated according to floor plan information After the networking scheme of equipment control, output generates networking scheme.The networking scheme is with picture or word Form embody, combination floor plan information preferably, in floor plan mark network building plan so that user can be more Clearly awareness network builds situation, and network is adjusted.Receive the adjustment that user is based on the networking scheme of output Instruction;The mode of building according to corresponding networking unit in the adjust instruction regulating networks building plan forms new net Network building plan.By the adjustment of user so that networking scheme is more rationally, accurately.
It is described according to home appliance installation site, floor plan and with reference to Fig. 7 in a preferred embodiment of the present invention Described in the network equipment position optimization of mark in advance build networking scheme, and export optimization after networking scheme it Afterwards, also include:
Step S70, receives the networking parameter of input;
Step S80, by the new networking of the networking schematic design making after networking parameter adjustment optimization Scheme.
The embodiment of the present invention is that the part that can combine floor plan information and user needs with the difference of above-described embodiment Ask structure networking scheme, user by being input into networking parameter, by the networking parameter adjustment networking The new networking scheme of schematic design making.Cause, networking scheme is generated according to floor plan information, only can consider space and distance Layout, the design without considering hommization, therefore, add the networking parameter of input together, common generation rationally has again The networking scheme of hommization.For example, generating wireless router according to network floor plan information is arranged on bedroom, but because wireless Can there is certain radiation in router, and bedroom is user treats time long region, it is necessary to ensure user health, therefore, Wireless router can be adjusted to next room or avoided because distance is remote in centre one wireless router of increase, bedroom There is no the situation of signal.
It is described according to home appliance installation site, floor plan and with reference to Fig. 8 in a preferred embodiment of the present invention Described in the network equipment position optimization of mark in advance build networking scheme, and export optimization after networking scheme it Afterwards, also include:
Step S90, when user builds to the physical arrangement of family, receives the positional information that physics is built;
Step S100, changes the floor plan according to the positional information and corresponding information of building, and generates new family Type figure information;
Step S110, according to the networking scheme after new floor plan information adjusting and optimizing.
The present embodiment it is different from the various embodiments described above be that user understands the house type of oneself some changes, and these change It is dynamic not to be uploaded to big data.Therefore, the positional information that Internet of Things is built is received by networking interface, i.e. which position seen There is modification, or layout is changed, for example, bedroom is changed to study or parlor increased children's recreation area or balcony adds Enter children's recreation area or reading fallow land, then need the positional information built according to these physics to repair floor plan Change, the networking scheme after changing the new floor plan information of generation and adjusting and optimizing, and then can generate further Accurate and rational networking scheme.
The present invention further provides a kind of optimization device of household appliance control network building plan.
Reference picture 9, Fig. 9 is the function mould of the first embodiment of the optimization device of present inventor's electric control networking scheme Block schematic diagram.
In one embodiment, the optimization device of the household appliance control network building plan includes:Acquisition module 10, reception mould Block 20, generation module 30, labeling module 40, optimization module 50 and output module 60.
The acquisition module 10, for obtain the floor plan of user place of abode, internet of things home appliance equipment installation site with And the networking scheme for building in advance;
The mode of the networking scheme for building in advance includes:
The receiver module 20, for receiving place of abode selection instruction;
The acquisition module 10, is additionally operable to obtain the place of abode information of selection;
In the present embodiment, there is provided network struction interface, the network structure of the household electrical appliances Internet of Things of structure family is needed in user When building, start Web architecture, into network struction interface.According to prompting, input place of abode or offer select menu, supply User selects place of abode, receives place of abode selection instruction, and obtain the place of abode information of selection.In order to improve intellectuality Degree, obtains the environment residing for user, and Web architecture is started according to residing environment, for example, what 1) user entered is new Cell, and inquire the house property purchase information that user has;2) network of user expires;3) detected Internet of Things household without Network signal.
In an embodiment of the present invention, after network struction interface is entered, point out user to open positioning, opened in positioning When, positioned by the alignment system position current to user and be used as place of abode.
The acquisition module 10, is additionally operable to obtain the corresponding floor plan letter of the place of abode information from big data platform Breath, and obtain the home appliance information of the place of abode;
The place of abode information such as building generic term for a building, e. g. Apartment, store, a movie theater, etc., unit number, floor, room number of each cell and family are prestored in big data platform Type figure information.After the place of abode information for getting subscriber household, by the place of abode information of the subscriber household send to Big data platform inquires about floor plan information corresponding with the place of abode information of the subscriber household, acquisition request floor plan letter Breath, big data platform is according to the floor plan information inquiry for prestoring to house type corresponding with the place of abode information of the subscriber household Figure information.The floor plan information that big data platform will be inquired is sent to the request end of acquisition request floor plan information, request end The floor plan information that big data platform sends is received, as the floor plan information that the big data platform for obtaining is inquired about.Obtaining family While type figure information or before or after, obtain the home appliance information of the place of abode.In the place of abode When being mounted with home appliance, storage end (big data platform, the mobile terminal of home appliance information can be installed from storage Or desktop computer etc.) home appliance information is got, or set by the Internet of Things household that camera gathers each house area Standby information, home appliance information of the home equipment information that will be gathered as the place of abode, i.e. by installed in residence The camera collection home appliance information of point.When not installing or not buying home appliance, can get in the following manner Home appliance information.
Specifically, the mode that the acquisition module 20 obtains home appliance information includes:Enter Internet of Things man in consumer During conductance purchase interface, the selection instruction of internet of things home appliance equipment is received;According to the selection instruction product internet-accessing electric appliance Purchase order;After the completion of the delivery operation of the purchase order, obtain the corresponding internet of things home appliance of the purchase order and set The standby home appliance information as the place of abode.
When user does not buy or does not arrange home appliance, consumer (user) enters internet of things home appliance shopping guide circle Face, the home appliance of purchase needed for selection, home appliance is bought by Internet of Things shopping guide interface, generates household electrical appliances purchase order, Order pays and completes, i.e. after user confirms to buy which home appliance and complete transaction operation, obtain the purchase order Corresponding internet of things home appliance equipment as the place of abode home appliance information.
The generation module 30, for generating home wiring control according to the floor plan information and the home appliance information Networking scheme.
After the home appliance information of floor plan information and the place of abode is got, can be obtained from floor plan information The room unit and layout situation of subscriber household, can obtain required from the situation of room unit and layout situation combination home appliance Internet of Things layout scenarios, which room needed by Internet of Things control, and which household electrical appliances needs the control of Internet of Things, respectively in room Between which position.That is, can be controlled according to required for the floor plan information and the home appliance information determine Internet of Things Region, the control area needed for automatically generating family's Internet of Things, such as parlor, study and/or bedroom.Obtaining required control Behind region processed, the networking scheme of home wiring control is generated with required control area, the networking scheme includes net The installation site of network access device, wired route on-position, wireless routing on-position, WiFi wirelessly turns blue-tooth radio equipment Installation site, continued access wireless routing on-position etc..
In an embodiment of the present invention, specifically, with reference to Figure 10, the generation module 30 includes:
Extraction unit 31, for house type information and each household according to each house area of the floor plan information extraction Interregional physical relation;
First determining unit 32, the home appliance cloth confidence for determining each house area according to the physical relation Breath;
First computing unit 33, the household area for calculating each house area according to the house type information extracted;
Generation unit 34, for being generated according to the household area, home appliance placement information and the physical relation The networking scheme of home wiring control.After floor plan is got, each house area is extracted from the floor plan information for obtaining House type information and each interregional physical relation, house area is the region that each separates, for example, kitchen, bedroom, visitor The Room, study etc..Each interregional physical relation is adjacent and distance relation, for example, bedroom is connected with parlor, study and bedroom It is connected, the ultimate range of ultimate range, bedroom and study in study and parlor etc., and each can be determined according to the physical relation The home appliance placement information of house area.That is, determine with reference to the physical relation between floor plan information and house type specific The layout information of the home appliance of control is needed, the physical relation between control home appliance needed for obtaining.Floor plan information has The length in room, the mark of width, the household area of each house area can be calculated according to these information, according to the household face Product, home appliance placement information and the physical relation generate the networking scheme of home wiring control.That is, ensure signal and On the premise of space, each builds the position of parameter in reasonable arrangement network, obtains more rational networking scheme.Pass through The physical relation of the physical relation of floor plan and the layout of home appliance, further determines that networking scheme.
Floor plan information, the networking scheme of place of abode are got through the above way, and the network of generation is taken Scheme is built as the advance networking scheme for building.Installation site of the home appliance in place of abode is obtained, for example, can basis The household electrical appliances installation site of user input obtains installation site of the home appliance in place of abode;Or shoot inside place of abode Image, the home appliance installation site of place of abode is obtained according to image.
The labeling module 40, sets for marking network in floor plan according to the networking scheme of the advance structure Standby position;
After the networking scheme and the floor plan information of place of abode for getting advance structure, in the floor plan Mark network equipment position, to determine which position can have the network coverage, which home appliance in the coverage of network, Which home appliance is in outside network range, and the network of which home appliance is good, and the network of which home appliance is poor.
The optimization module 50, for according to home appliance installation site, floor plan and the network equipment for having marked position Put the networking scheme for optimizing the advance structure;
The output module 60, for exporting the networking scheme after optimization.
Built in advance described in installation site, floor plan according to home appliance and the network equipment position optimization for having marked Networking scheme, i.e. network equipment position marked out in floor plan come after, it may be determined which home appliance no longer net In network coverage, the network of which home appliance is relatively good, can for floor plan and the network equipment mark situation and Home appliance installation site adjusts networking scheme, it is ensured that all home appliances are all in network coverage, or showing The scope of technically increasing network coverage having, increases network transferring equipment (for example, router etc.) come scope of increasing network coverage.
Specifically, with reference to Figure 11, the optimization module 50 includes:
Second determining unit 51, for being determined between each home appliance according to home appliance installation site and floor plan Physical relation;
Second computing unit 52, for being set according to the physical relation and the network equipment position calculating network for having marked Standby adjustment information;
Optimization unit 53, for according to the network equipment in adjustment information adjustment in advance networking scheme of structure Position, to optimize the networking scheme of the advance structure.Specifically, can be marked in floor plan network coverage with And the network equipment position of home appliance installation site and the networking scheme for building in advance, obtain between each home appliance Physical relation, adjustment information according to the physical relation and the network equipment position calculating network equipment for having marked simultaneously shows Show adjustment information.According to the adjustment information (network equipment position, home appliance position and the network coverage model that are shown in floor plan Enclose) directly adjust, optimize the networking scheme of the advance structure, and export the networking scheme after optimization.
The present embodiment is by obtaining place of abode floor plan information, internet of things home appliance equipment installation site and building in advance Networking scheme, marks network equipment position, home appliance installation site in floor plan, position and net according to mark Network coverage adjusts network equipment position or increases the network equipment, to the advance networking project setting for building, it is ensured that institute There is home appliance to be in network control range, optimize networking scheme.According to the actual requirements come optimize build network take Build scheme, there is provided the network plan that family's home appliance Internet of Things of the more reasonable, degree of accuracy is controlled, it is to avoid internet of things home appliance institute Do not covered or jitter in Local Area Network, it will cause the internet of things home appliance can not normally to use internet of things functional, improved Internet of Things net layout intelligence degree and the degree of accuracy.
In a preferred embodiment of the present invention, with reference to Figure 12, described device also includes:Update module 70,
The output module 60, is additionally operable to the networking scheme of the generated home wiring control of output;
The receiver module 20, is additionally operable to receive the adjust instruction to the networking scheme for exporting;
The update module 70, is additionally operable to according to the corresponding networking in the adjust instruction regulating networks building plan The mode of building of unit forms new networking scheme, using new networking scheme as the advance networking side for building Case.
Difference with above-described embodiment is, after networking scheme is optimized, according to user's request, i.e. user sends Instruction the automatic networking scheme for building is made adjustment.The network that home appliance is controlled is being generated according to floor plan information After building plan, output generates networking scheme.The networking scheme is embodied in the form of picture or word, preferably The combination floor plan information on ground, marks the building plan of network so that the awareness network that user can become apparent from floor plan Build situation, network is adjusted.Receive the adjust instruction that user is based on the networking scheme of output;According to the tune The mode of building of corresponding networking unit forms new networking scheme in whole instruction regulating networks building plan.Pass through The adjustment of user so that networking scheme is more rationally, accurately.
In a preferred embodiment of the present invention, with reference to Figure 12, the receiver module 20, the network for being additionally operable to receive input is taken Build parameter;
The update module 70, is additionally operable to the networking schematic design making after the networking parameter adjustment optimizes New networking scheme.
The embodiment of the present invention is that the part that can combine floor plan information and user needs with the difference of above-described embodiment Ask structure networking scheme, user by being input into networking parameter, by the networking parameter adjustment networking The new networking scheme of schematic design making.Cause, networking scheme is generated according to floor plan information, only can consider space and distance Layout, the design without considering hommization, therefore, add the networking parameter of input together, common generation rationally has again The networking scheme of hommization.For example, generating wireless router according to network floor plan information is arranged on bedroom, but because wireless Can there is certain radiation in router, and bedroom is user treats time long region, it is necessary to ensure user health, therefore, Wireless router can be adjusted to next room or avoided because distance is remote in centre one wireless router of increase, bedroom There is no the situation of signal.
In a preferred embodiment of the present invention, with reference to Figure 12, the receiver module 10 is additionally operable to the thing to family in user When reason structure is built, the positional information that physics is built is received;
The update module 70, is additionally operable to repair the floor plan according to the positional information and corresponding information of building Change, generate new floor plan information;Update module 70 is additionally operable to
The networking scheme of home wiring control is generated according to new floor plan information and the home appliance information, will be new Networking scheme is used as the advance networking scheme for building.
The present embodiment it is different from the various embodiments described above be that user understands the house type of oneself some changes, and these change It is dynamic not to be uploaded to big data.Therefore, the positional information that Internet of Things is built is received by networking interface, i.e. which position seen There is modification, or layout is changed, for example, bedroom is changed to study or parlor increased children's recreation area or balcony adds Enter children's recreation area or reading fallow land, then need the positional information built according to these physics to repair floor plan Change, the floor plan information new by changing generation, and then further accurate and rational networking scheme can be generated.
The present invention also proposes a kind of mobile terminal, the mobile terminal routine portion such as including camera, display screen, mainboard Part, also including the optimization device of household appliance control network building plan as described above, mobile terminal of the invention is occupied by obtaining Residence point floor plan information, internet of things home appliance equipment installation site and the networking scheme for building in advance, in floor plan subscript Note network equipment position, home appliance installation site, position and network coverage the adjustment network equipment position according to mark The network equipment is put or increases, to the advance networking project setting for building, it is ensured that all home appliances are in network control In the range of, optimize networking scheme.Networking scheme is built optimizing according to the actual requirements, there is provided more rationally, accurate The network plan of the family home appliance Internet of Things control of degree, it is to avoid the network coverage of internet of things home appliance region less than or signal It is unstable, it will to cause the internet of things home appliance can not normally to use internet of things functional, improve Internet of Things net layout's intelligence degree and standard Exactness.
The preferred embodiments of the present invention are these are only, the scope of the claims of the invention is not thereby limited, it is every to utilize this hair Equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills Art field, is included within the scope of the present invention.