US20230316158A1 - System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management - Google Patents
- ️Thu Oct 05 2023
Info
-
Publication number
- US20230316158A1 US20230316158A1 US18/207,365 US202318207365A US2023316158A1 US 20230316158 A1 US20230316158 A1 US 20230316158A1 US 202318207365 A US202318207365 A US 202318207365A US 2023316158 A1 US2023316158 A1 US 2023316158A1 Authority
- US
- United States Prior art keywords
- power
- consuming device
- power consuming
- utility
- reserve Prior art date
- 2009-05-08 Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 57
- 230000001419 dependent effect Effects 0.000 claims description 36
- 238000005070 sampling Methods 0.000 claims description 36
- 238000004891 communication Methods 0.000 claims description 16
- 238000005259 measurement Methods 0.000 claims description 10
- 230000009467 reduction Effects 0.000 claims description 10
- 239000011159 matrix material Substances 0.000 claims description 3
- 238000009987 spinning Methods 0.000 description 49
- 230000007613 environmental effect Effects 0.000 description 35
- 230000001105 regulatory effect Effects 0.000 description 26
- 230000006399 behavior Effects 0.000 description 24
- 238000010586 diagram Methods 0.000 description 15
- 238000007726 management method Methods 0.000 description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 12
- 238000013459 approach Methods 0.000 description 9
- 230000008859 change Effects 0.000 description 9
- 230000006870 function Effects 0.000 description 9
- 230000008901 benefit Effects 0.000 description 7
- 230000005540 biological transmission Effects 0.000 description 7
- 230000001965 increasing effect Effects 0.000 description 7
- 230000008569 process Effects 0.000 description 6
- 238000001816 cooling Methods 0.000 description 5
- 230000007423 decrease Effects 0.000 description 5
- 238000010438 heat treatment Methods 0.000 description 5
- 238000012544 monitoring process Methods 0.000 description 5
- 238000012358 sourcing Methods 0.000 description 5
- 230000009471 action Effects 0.000 description 4
- 230000004913 activation Effects 0.000 description 4
- 230000003247 decreasing effect Effects 0.000 description 4
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 3
- 239000003570 air Substances 0.000 description 3
- 230000033228 biological regulation Effects 0.000 description 3
- 229910052799 carbon Inorganic materials 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 238000010248 power generation Methods 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 230000000153 supplemental effect Effects 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 238000012795 verification Methods 0.000 description 3
- 238000012935 Averaging Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 230000003466 anti-cipated effect Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 239000000446 fuel Substances 0.000 description 2
- 230000001939 inductive effect Effects 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 238000007493 shaping process Methods 0.000 description 2
- 230000002747 voluntary effect Effects 0.000 description 2
- 230000004308 accommodation Effects 0.000 description 1
- 239000012080 ambient air Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 230000009849 deactivation Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000010076 replication Effects 0.000 description 1
- 238000009420 retrofitting Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 230000004622 sleep time Effects 0.000 description 1
- 230000009182 swimming Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/12—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Definitions
- the present invention relates generally to the field of electric power supply and generation systems and, more particularly, to a system and method for generating and/or providing dispatchable operating reserve energy capacity for an electric utility using active load management so that the reserve capacity may be made available to the utility or to the general power market (e.g., via a national grid).
- operating reserve typically includes three types of power: so-called “regulating reserve,” “spinning reserve,” and “non-spinning reserve” or “supplemental reserve.” The various types of operating reserve are discussed in more detail below.
- Contingency reserve is additional generating capacity that is available for use as economic dispatch to meet changing (increasing) demand.
- Contingency reserve consists of two of the types of operating reserve, namely, spinning reserve and non-spinning reserve. Therefore, operating reserve generally consists of regulating reserve and contingency reserve.
- spinning reserve is additional generating capacity that is already online (e.g., connected to the power system) and, thus, is immediately available or is available within a short period of time after a determined need (e.g., within ten (10) to fifteen (15) minutes, as defined by the applicable North American Electric Reliability Corporation (NERC) regulation).
- a determined need e.g., within ten (10) to fifteen (15) minutes, as defined by the applicable North American Electric Reliability Corporation (NERC) regulation.
- the reserve power capacity in order for contingency reserve to be classified as “spinning reserve,” the reserve power capacity must meet the following criteria: a) be connected to the grid; b) be measurable and verifiable; and c) be capable of fully responding to load typically within 10-15 minutes of being dispatched by a utility, where the time-to-dispatch requirements of the spinning reserve are generally governed by a grid system operator or other regulatory body, such as NERC.
- Non-spinning reserve (also called supplemental reserve) is additional generating capacity that is not online, but is required to respond within the same time period as spinning reserve.
- supplemental reserve is additional generating capacity that is not online, but is required to respond within the same time period as spinning reserve.
- a power utility will make use of its spinning reserve before using its non-spinning reserve because (a) the generation methods used to produce spinning reserve capacity typically tends to be cheaper than the methods, such as one-way traditional demand response, used to produce non-spinning reserve or (b) the consumer impact to produce non-spinning reserve is generally less desirable than the options used to produce spinning reserve due to other considerations, such as environmental concerns.
- spinning reserve may be produced by increasing the torque of rotors for turbines that are already connected to the utility's power grid or by using fuel cells connected to the utility's power grid; whereas, non-spinning reserve may be produced from simply turning off resistive and inductive loads such as heating/cooling systems attached to consumer locations.
- non-spinning reserve may be produced from simply turning off resistive and inductive loads such as heating/cooling systems attached to consumer locations.
- ADC Automatic Generation Control
- ACE Area Control Error
- ACE (NI.sub.A ⁇ NI.sub.S)+( ⁇ 10B.sub.1)(F.sub.A ⁇ F.sub.S), [Equation 1], where NI.sub.A is the sum of actual power flows on all tie lines, Ni.sub.S is the sum of scheduled flows on all tie lines, B.sub.1 is the frequency bias setting for the utility, F.sub.A is the actual line frequency, and F.sub.S is the scheduled line frequency (typically 60 Hz).
- the amount of loading relative to capacity on the tie lines causes the quantity (NI.sub.A ⁇ NI.sub.S) to be either positive or negative.
- the quantity (NI.sub.A ⁇ NI.sub.S) is negative, which typically causes ACE to be negative.
- the quantity (NI.sub.A ⁇ NI.sub.S) is positive (i.e., the utility is over-generating or over-supplying), which typically causes ACE to be positive.
- ACE is a measure of generation capacity relative to load.
- a utility attempts to maintain its ACE very close zero using AGC processes.
- regulating reserve is one type of operating reserve as illustrated in FIG. 1 .
- Regulating reserve is used as needed to maintain constant line frequency. Therefore, regulating reserve must be available almost immediately when needed (e.g., in as little as a few seconds to less than about five (5) minutes).
- Governors are typically incorporated into a utility's generation system to respond to minute-by-minute changes in load by increasing or decreasing the output of individual generators and, thereby, engaging or disengaging, as applicable, the utility's regulating reserve.
- DSM Demand Side Management
- FERC and NERC have introduced the concept of flexible load-shape programs as a component of DSM. These programs allow customers to make their preferences known to the utility concerning timing and reliability of DSM load control events.
- DSM approaches utilizing load-shaping programs do not meet all of the criteria for implementing regulating reserve or spinning reserve, such as being dispatchable within 15 minutes or less. Additionally, in order for a generating source to be considered dispatchable energy, it must be forecasted twenty-four (24) hours prior to being delivered to a utility. Current DSM approaches do not facilitate accurate forecasting twenty-four (24) hours in advance due to their heavy reliance on statistics.
- the present invention provides methods and systems for generating operating reserves.
- the present invention is directed to a method for generating operating reserves of a utility and/or any market participant of an electric power grid servicing one or more service points, the method including the steps of: determining amounts of electric power consumed by at least a first set of devices during at least one period of time to produce power consumption data, and a first power supply value (PSV) associated with each of the first set of devices, the first set of devices being located at the one or more service points; storing the power consumption data and the first PSV in a repository; determining that a control event is to occur during which a supply of electric power is to be reduced to at least the first set of devices; generating, prior to commencement of the control event and under an assumption that the control event is not to occur, power consumption behavior expected of the first set of devices during a first period of time based at least on the stored power consumption data, wherein the control event is expected to occur during the first period of time; determining, prior to commencement of the control event, projected energy savings resulting from the control event based at least on the actual power
- the present invention is further directed to a grid operator and/or system that provides electrical service to one or more remotely located service points, each service point including at least one device that consumes power during operation thereof, the grid operator including: a repository; and at least one processor coupled to the repository, the at least one processor operable to: determine amounts of electric power consumed by the at least a first set of devices during at least one period of time to produce power consumption data and corresponding power supply values (PSVs) for the devices; store the power consumption data in the repository; determine that a control event is to occur during which a supply of electric power is to be reduced to at least the first set of devices; determine, prior to commencement of the control event and under an assumption that the control event is not to occur, power consumption behavior expected of at least the first set of devices for a first period of time based at least on the stored power consumption data, wherein the control event is expected to occur during the first period of time; determine, prior to commencement of the control event, projected energy savings resulting from the control event based at least on the actual power consumption behavior and
- FIG. 1 is a table showing the base load power requirements and operating reserve available to an electric power utility.
- FIG. 2 is a block diagram illustrating how an active load management system in accordance with the present invention provides additional operating (e.g., regulating, spinning and/or non-spinning) reserve to a power utility.
- additional operating e.g., regulating, spinning and/or non-spinning
- FIG. 3 is a block diagram of an exemplary IP-based, active load management system in accordance with one embodiment of the present invention.
- FIG. 4 is a block diagram illustrating an exemplary active load director as shown in the power load management system of FIG. 3 .
- FIG. 5 is a block diagram illustrating generation of an exemplary sampling repository at the active load director of FIG. 4 or some other location in an electric utility.
- FIG. 6 is a screen shot of an exemplary web browser interface through which a customer may designate his or her device performance and energy saving preferences for an environmentally-dependent, power consuming device in accordance with one embodiment of the present invention.
- FIG. 7 is a screen shot of an exemplary web browser interface through which a customer may designate his or her device performance and energy saving preferences for an environmentally-independent, power consuming device in accordance with another embodiment of the present invention.
- FIG. 8 is an operational flow diagram illustrating a method for empirically analyzing power usage of power consuming devices and populating a repository with data samples resulting from such power usage analysis, in accordance with an exemplary embodiment of the present invention.
- FIG. 9 is an operational flow diagram illustrating a method for projecting energy usage for a power consuming device in accordance with an exemplary embodiment of the present invention.
- FIG. 10 is an operational flow diagram illustrating a method for generating power consumption behavior of a power consuming device in accordance with an exemplary embodiment of the present invention.
- FIG. 11 is an operational flow diagram illustrating a method for projecting energy savings through power interruption to a power consuming device during a control event, in accordance with an exemplary embodiment of the present invention.
- FIG. 12 is a graph that depicts a load profile of a utility during a projected time period, showing actual energy usage as well as projected energy usage determined with and without a control event, in accordance with an exemplary embodiment of the present invention.
- FIG. 13 is a block diagram of a system for implementing a virtual electric utility in accordance with an exemplary embodiment of the present invention.
- the embodiments reside primarily in combinations of apparatus components and processing steps related to actively monitoring and managing power loading at an individual service point (e.g., on an individual subscriber basis) and throughout a utility's service area, as well as determining available or dispatchable operating reserve power derived from projected power savings resulting from monitoring and management of power loading. Accordingly, the apparatus and method components have been represented where appropriate by conventional symbols in the drawings, showing only those specific details that are pertinent to understanding the embodiments of the present invention so as not to obscure the disclosure with details that will be readily apparent to those of ordinary skill in the art having the benefit of the description herein.
- ZigBee refers to any wireless communication protocol adopted by the Institute of Electronics & Electrical Engineers (IEEE) according to standard 802.15.4 or any successor standard(s)
- Wi-Fi refers to any communication protocol adopted by the IEEE under standard 802.11 or any successor standard(s)
- WiMax refers to any communication protocol adopted by the IEEE under standard 802.16 or any successor standard(s)
- Bluetooth refers to any short-range communication protocol implementing IEEE standard 802.15.1 or any successor standard(s).
- WiMax wireless protocols
- a “1 G” wireless protocol such as analog wireless transmission, first generation standards based (IEEE, ITU or other recognized world communications standard), a “2-G” standards based protocol such as “EDGE or CDMA 2000 also known as 1 ⁇ RTT”, a 3G based standard such as “High Speed Packet Access (HSPA) or Evolution for Data Only (EVDO), any accepted 4G standard such as “IEEE, ITU standards that include WiMax, Long Term Evolution “LTE” and its derivative standards, any Ethernet solution wireless or wired, or any proprietary wireless or power line carrier standards that communicate to a client device or any controllable device that sends and receives an IP based message.
- a “1 G” wireless protocol such as analog wireless transmission
- first generation standards based IEEE, ITU or other recognized world communications standard
- 2-G standards based protocol
- EDGE or CDMA 2000 also known as 1 ⁇ RTT
- 3G based standard such as “High Speed Packet Access (HSPA) or Evolution for Data Only (EVDO)
- High Speed Packet Data Access refers to any communication protocol adopted by the International Telecommunication Union (ITU) or another mobile telecommunications standards body referring to the evolution of the Global System for Mobile Communications (GSM) standard beyond its third generation Universal Mobile Telecommunications System (UMTS) protocols.
- LTE Long Term Evolution
- LTE Long Term Evolution
- CDMA Code Division Multiple Access
- EVDO Evolution Date-Optimized
- CDMA EVDO Rev. A refers to the communication protocol adopted by the ITU under standard number TIA-856 Rev. A.
- utility refers to any entity or system that generates, distributes, and/or resells electrical power, including any market participant associated with an electric power grid, microgrid, etc., that purchases power from a power-generating entity and distributes the purchased power to end user customers, or that supplies electricity created either actually or virtually by alternative energy sources, such as solar power, wind power, load control, or otherwise, to power generation or distribution entities through the FERC electrical grid or otherwise, or that schedules the supply of energy or ancillary services, such as operating reserves.
- an “electric utility” may be a power-generating entity, a power-distributing entity, a retail electric provider (REP), an independent system operator (ISO), an electrical grid operator, or any other market participant, such as any entity that performs the function of a load serving entity (LSE), a qualified scheduling entity (QSE), a resource entity (RE), or a transmission/distribution service provider (TDSP), as such entities and participants are understood by those of ordinary skill in the art in the electricity industry.
- REP retail electric provider
- ISO independent system operator
- LSE load serving entity
- QSE qualified scheduling entity
- RE resource entity
- TDSP transmission/distribution service provider
- the terms “energy” and “power” are used interchangeably herein.
- the terms “operating reserve,” “spinning reserve,” “regulating reserve,” “non-spinning reserve,” “supplemental reserve,” and “contingency reserve” are conventional in the art and their uses and inter-relations are described in hereinabove.
- the term “environment” refers to general conditions, such as air temperature, humidity, barometric pressure, wind speed, rainfall quantity, water temperature, etc., at or proximate a service point or associated with a device (e.g., water temperature of water in a hot water heater or a swimming pool).
- the term “device,” as used herein, means a power-consuming device, and there may generally be two different types of devices within a service point, namely, an environmentally-dependent device and an environmentally-independent device.
- An environmentally-dependent device is any power consuming device that turns on or off, or modifies its behavior, based on one or more sensors that detect characteristics, such as temperature, humidity, pressure, or various other characteristics, of an environment.
- An environmentally-dependent device may directly affect and/or be affected by the environment in which it operates.
- An environmentally-independent device is any power-consuming device that turns on or off, or modifies its behavior, without reliance upon inputs from any environmental sensors.
- an environmentally-independent device does not directly affect, and is not typically affected by, the environment in which it operates, although, as one skilled in the art will readily recognize and appreciate, operation of an environmentally-independent device can indirectly affect, or occasionally be affected by, the environment.
- a refrigerator or other appliance generates heat during operation, thereby causing some heating of the ambient air proximate the device.
- embodiments or components of the systems described herein may be comprised of one or more conventional processors and unique stored program instructions that control the one or more processors to implement, in conjunction with certain non-processor circuits, some, most, or all of the functions for determining an electric utility's available or dispatchable operating (e.g., regulating and spinning) reserve that is derived from projected power savings resulting from monitoring and management of loads in one or more active load management systems as described herein.
- the non-processor circuits may include, but are not limited to, radio receivers, radio transmitters, antennas, modems, signal drivers, clock circuits, power source circuits, relays, meters, memory, smart breakers, current sensors, and user input devices.
- these functions may be interpreted as steps of a method to store and distribute information and control signals between devices in a power load management system.
- some or all functions could be implemented by a state machine that has no stored program instructions, or in one or more application specific integrated circuits (ASICs), in which each function or some combinations of functions are implemented as custom logic.
- ASICs application specific integrated circuits
- a combination of the foregoing approaches could be used.
- the present invention encompasses a system and method for generating operating reserve (e.g., spinning and/or regulating reserve) for a utility servicing one or more service points.
- the utility or any market participant associated with the electric power grid employs an active load management system (ALMS) to remotely determine, during at least one period of time, power consumed by at least one device located at the one or more service points and receiving power from the utility to produce power consumption data.
- the power consumption data is regularly stored and updated in a repository.
- ALD active load director
- the ALMS or its control component Prior to commencement of the control event, the ALMS or its control component: (i) generates power consumption behavior expected of the device(s) during the time period of the control event based at least on the stored power consumption data, (ii) determines projected energy savings resulting from the control event based at least on the power consumption behavior of device(s), and determines operating (e.g., regulating and/or spinning) reserve based on the projected energy savings.
- the determined operating reserve may be made available to the current power utility or to the power market through the existing (e.g., Federal Energy Regulatory Commission) power grid.
- the ALD populates an internal repository (e.g., database, matrix, or other storage medium) with measurement data indicating how individual devices within individual service points consume power or otherwise behave under normal operation and during control events.
- the power consumption data is updated through regular (e.g., periodic or otherwise) sampling of device operating conditions (e.g., current draw, duty cycle, operating voltage, etc.).
- device operating conditions e.g., current draw, duty cycle, operating voltage, etc.
- the systems and methods of the present invention provide for generating at the control center a power supply value (PSV) corresponding to the reduction in consumed power by the power consuming device(s).
- PSV is an actual value that includes measurement and verification of the reduction in consumed power; such measurement and verification methods may be determined by the appropriate governing body or authority for the electric power grid(s).
- Power Supply Value (PSV) is calculated at the meter or submeter or at building control system or at any device or controller that measures power within the standard as supplied by the regulatory body(ies) that govern the regulation of the grid. PSV variations may depend on operating tolerances, operating standard for accuracy of the measurement.
- the PSV enables transformation of curtailment or reduction in power at the device level by any system that sends or receives an IP message or power control-related message to be related to or equated to supply as presented to the governing entity that accepts these values and award supply equivalence, for example of a power generating entity or an entity allowed to control power consuming devices as permitted by the governing body of the electric power grid, e.g., FERC, NERC, etc.
- PSV may be provided in units of electrical power flow, monetary equivalent, and combinations thereof. Also, PSV relates to the ability to reduce power by curtailment or by putting power back onto the grid, and the quality and value associated therewith. Thus, the PSV provides an actual value that is confirmed by measurement and/or verification, thereby providing for a curtailment value as a requirement for providing supply to the power grid, wherein the supply to the power electric power grid is provided for grid stability, voltage stability, reliability, and combinations thereof, and is further provided as responsive to an energy management system or equivalent for providing grid stability, reliability, frequency as determined by governing authority for the electric power grid and/or grid operator(s).
- additional data may be used to help differentiate each data sample stored in the repository.
- the additional data is associated with variability factors, such as, for example, outside air temperature, day of the week, time of day, humidity, sunlight, wind speed, altitude, orientation of windows or doors, barometric pressure, energy efficiency rating of the service point, insulation used at the service point, and others. All of these variability factors can have an influence on the power consumption of a device.
- Some of the variability factor data may be obtained from public sources, such as local, state or national weather services, calendars, and published specifications.
- Other variability factor data may be obtained privately from user input and from sensors, such as humidity, altitude, temperature (e.g., a thermostat), and optical or light sensors, installed at or near a service point (e.g., within or at a residence or business).
- FIG. 2 is a block diagram illustrating how an ALMS operating in accordance with the present invention provides additional operating (e.g., regulating, spinning, and/or non-spinning) reserve to a power utility.
- additional operating e.g., regulating, spinning, and/or non-spinning
- the utility has capacity equal to its base load plus its regulating reserve, spinning reserve, and non-spinning reserve as shown on the left side of the figure.
- the utility has additional operating reserve, which may be preferably used as regulating, spinning and/or non-spinning reserve (as illustrated in FIG.
- FIG. 3 depicts an exemplary IP-based active load management system (ALMS) 10 that may be utilized by an electric utility, which may be a conventional power-generating utility or a virtual utility, in accordance with the present invention.
- ALMS IP-based active load management system
- the below description of the ALMS 10 is limited to specific disclosure relating to embodiments of the present invention.
- a more general and detailed description of the ALMS 10 is provided in commonly-owned, co-pending U.S. application Ser. No. 11/895,909, which was filed on Aug. 28, 2007, was published as U.S. Patent Application Publication No. US 2009/0062970 A1 on Mar.
- U.S. Patent Application Publication No. US 2009/0062970 A1 provides details with respect to the exemplary operational implementation and execution of control events to interrupt or reduce power to devices located at service points, such as residences and businesses.
- the use of an ALMS 10 to implement a virtual utility is described in detail in commonly-owned and co-pending U.S. application Ser. No. 12/001,819, which was filed on Dec. 13, 2007, was published as U.S. Patent Application Publication No. US 2009/0063228 A1 on Mar. 5, 2009, and is incorporated herein by this reference as if fully set forth herein.
- the ALMS 10 monitors and manages power distribution via an active load director (ALD) 100 connected between one or more utility control centers (UCCs) 200 (one shown) and one or more active load clients (ALCs) 300 (one shown) installed at one or more service points 20 (one exemplary residential service point shown).
- ALD 100 may communicate with the utility control center 200 and each active load client 300 either directly or through a network 80 using the Internet Protocol (IP) or any other (IP or Ethernet) connection-based protocols.
- IP Internet Protocol
- the ALD 100 may communicate using RF systems operating via one or more base stations 90 (one shown) using one or more wireless communication protocols, such as GSM, ANSI C12.22, Enhanced Data GSM Environment (EDGE), HSPA, LTE, Time Division Multiple Access (TDMA), or CDMA data standards, including CDMA 2000, CDMA Revision A, CDMA Revision B, and CDMA EVDO Rev. A.
- wireless communication protocols such as GSM, ANSI C12.22, Enhanced Data GSM Environment (EDGE), HSPA, LTE, Time Division Multiple Access (TDMA), or CDMA data standards, including CDMA 2000, CDMA Revision A, CDMA Revision B, and CDMA EVDO Rev. A.
- the ALD 100 may communicate via a digital subscriber line (DSL) capable connection, cable television based IP capable connection, or any combination thereof.
- DSL digital subscriber line
- the ALD 100 communicates with one or more active load clients 300 using a combination of traditional IP-based communication (e.g., over a trunked line) to a base station 90 and a wireless channel implementing the HSPA or EVDO protocol from the base station 90 to the active load client 300 .
- the distance between the base station 90 and the service point 20 or the active load client 300 is typically referred to as the “last mile” even though the distance may not actually be a mile.
- the ALD 100 may be implemented in various ways, including, but not limited to, as an individual server, as a blade within a server, in a distributed computing environment, or in other combinations of hardware and software.
- the ALD 100 will be described as embodied in an individual server to facilitate an understanding of the present invention.
- the server embodiment of the ALD 100 described below corresponds generally to the description of the ALD 100 in US patent application Publication Nos. US 2009/0062970 A1 and US 2009/0063228 A1.
- Each active load client 300 is preferably accessible through a specified address (e.g., IP address) and controls and monitors the state of individual smart breaker modules or intelligent appliances 60 installed at the service point 20 (e.g., in the business or residence) to which the active load client 300 is associated (e.g., connected or supporting).
- Each active load client 300 is preferably associated with a single residential or commercial customer.
- the active load client 300 communicates with a residential load center 400 that contains smart breaker modules, which are able to switch from an “ON” (active) state to an “OFF” (inactive) state, and vice versa, responsive to signaling from the active load client 300 .
- Smart breaker modules may include, for example, smart breaker panels manufactured by Schneider Electric SA under the trademark “Square D” or Eaton Corporation under the trademark “Cutler-Hammer” for installation during new construction.
- smart breakers having means for individual identification and control may be used.
- each smart breaker controls a single appliance (e.g., a washer/dryer 30 , a hot water heater 40 , an HVAC unit 50 , or a pool pump 70 ).
- IP addressable relays or device controllers that operate in a manner similar to a “smart breaker” may be used in place of smart breakers, but would be installed coincident with the load under control and would measure the startup power, steady state power, power quality, duty cycle and energy load profile of the individual appliance 60 , HVAC unit 40 , pool pump 70 , hot water heater 40 , or any other controllable load as determined by the utility or end customer.
- the active load client 300 may control individual smart appliances directly (e.g., without communicating with the residential load center 400 ) via one or more of a variety of known communication protocols (e.g., IP, Broadband over PowerLine (BPL) in its various forms, including through specifications promulgated or being developed by the HOMEPLUG Powerline Alliance and the Institute of Electrical and Electronic Engineers (IEEE), Ethernet, Bluetooth, ZigBee, Wi-Fi (IEEE 802.11 protocols), HSPA, EVDO, etc.).
- a smart appliance 60 includes a power control module (not shown) having communication abilities.
- the power control module is installed in-line with the power supply to the appliance, between the actual appliance and the power source (e.g., the power control module is plugged into a power outlet at the home or business and the power cord for the appliance is plugged into the power control module).
- the power control module receives a command to turn off the appliance 60 , it disconnects the actual power supplying the appliance 60 .
- the smart appliance 60 may include a power control module integrated directly into the appliance, which may receive commands and control the operation of the appliance directly (e.g., a smart thermostat may perform such functions as raising or lowering the set temperature, switching an HVAC unit on or off, or switching a fan on or off).
- the active load client 300 may further be coupled to one or more variability factor sensors 94 .
- Such sensors 94 may be used to monitor a variety of variability factors affecting operation of the devices, such as inside and/or outside temperature, inside and/or outside humidity, time of day, pollen count, amount of rainfall, wind speed, and other factors or parameters.
- the ALD 100 may serve as the primary interface to customers, as well as to service personnel, and operates as the system controller sending control messages or power control messages to, and collecting data from, installed active load clients 300 as described in detail below and in U.S. Patent Application Publication No. US 2009/0062970 A1, which is incorporated herein by reference in its entirety.
- FIG. 4 the ALD 100 may serve as the primary interface to customers, as well as to service personnel, and operates as the system controller sending control messages or power control messages to, and collecting data from, installed active load clients 300 as described in detail below and in U.S. Patent Application Publication No. US 2009/0062970 A1, which is incorporated herein by reference in its entirety.
- the ALD 100 is implemented as an individual server and includes a utility control center (UCC) security interface 102 , a UCC command processor 104 , a master event manager 106 , an ALC manager 108 , an ALC security interface 110 , an ALC interface 112 , a web browser interface 114 , a customer sign-up application 116 , customer personal settings 138 , a customer reports application 118 , a power savings application 120 , an ALC diagnostic manager 122 , an ALD database 124 , a service dispatch manager 126 , a trouble ticket generator 128 , a call center manager 130 , a carbon savings application 132 , a utility power and carbon (P&C) database 134 , a read meter application 136 , a security device manager 140 , a device controller 144 , and one or more processors 160 (one shown).
- UCC utility control center
- P&C utility power and carbon
- a sampling repository is used to facilitate the determination of dispatchable operating reserve power or energy (e.g., spinning and/or regulating reserve) for a utility.
- An exemplary sampling repository 500 is shown in block diagram form in FIG. 5 .
- the sampling repository 500 is a means for storing device monitoring data and other data that collectively details how devices (e.g., a hot water heater 40 as shown in FIG. 5 ) have behaved under specific conditions.
- the repository 500 may be in various forms, including a matrix, a database, etc.
- the sampling repository 500 is implemented in the ALD database 124 of the ALD 100 .
- the sampling repository 500 may reside elsewhere within the ALD 100 or be external to the ALD 100 .
- the sampling repository 500 contains all power consumption data for devices located at a device or service point 20 or within a utility and/or any market participant associated with the electric power grid.
- Power consumption data may include, but is not limited to: current reading, energy/power used or consumed, energy/power saved, drift or drift rate, power time, user settings for maximum environmental variances, time periods (e.g., hours of the day, days of the week, and calendar days). Taken collectively, this data is used to show how devices behaved during normal operation as well as during control events in which power is temporarily interrupted or reduced to one or more devices.
- the data may be obtained via passive sampling (e.g., regular monitoring of devices at a particular service point 20 by the active load client 300 associated with the service point 20 ) and/or active sampling (e.g., direct polling of the devices for the data by the active load client 300 or the ALD 100 ).
- the sampling repository 500 is used by the ALD 100 or other components of the ALMS 10 to generate or project power consumption behavior of the devices and to determine projected power/energy savings resulting from a control event.
- the projected power savings may be determined using the power savings application 120 based upon the power consumption data in the repository 500 .
- FIG. 6 is an exemplary screen shot displayed to a user (e.g., customer) during execution of a customer personal settings application 138 .
- the illustrated screen shot shows a screen being used to set the customer preferences for an environmentally-dependent device, such as an HVAC unit 50 , a humidifier, or a pool heater.
- the illustrated screen shot may be provided to the customer in one embodiment via an Internet-accessible web portal 98 (referred to herein as the “customer dashboard”) when such portal is accessed by the customer via a computer, smart phone, or other comparable device.
- an Internet-accessible web portal 98 referred to herein as the “customer dashboard”
- the customer dashboard 98 may be connected to the ALD 100 via an Internet service provider for the service point 20 or may be implemented as a customer Internet application 92 when Internet service is supplied through the active load client 300 as described in U.S. Patent Application Publication No. US 2009/0063228 A1.
- the customer dashboard 98 effectively provides the customer with access into the ALD 100 .
- the ALD's web browser interface 114 accepts inputs from the customer dashboard 98 and outputs information to the customer dashboard 98 for display to the customer.
- the customer dashboard 98 may be accessed from the service point 20 or remotely from any Internet-accessible device, preferably through use of a user name and password.
- the customer dashboard 98 is preferably a secure, web-based interface used by customers to specify preferences associated with devices controlled by the ALD 100 and located at the customer's service point 20 , as well as to provide information requested by the customer personal settings application 138 or the customer sign-up application 116 in connection with controlled devices and/or service point conditions or parameters.
- Customer preferences may include, for example, control event preferences (e.g., times, durations, etc.), bill management preferences (e.g., goal or target for maximum monthly billing cost), maximum and minimum boundary settings for environmental characteristics, and others.
- FIG. 7 is another exemplary screen shot displayed to a customer via the customer dashboard 98 during execution of a different portion of the customer personal settings application 138 .
- FIG. 7 shows how customer preferences could be set for an environmentally-independent device, such as a hot water heater 40 , a pool pump 70 , or a sprinkler system water pump (which may also be an environmentally-dependent device if it includes, for example, a rainfall sensor).
- an environmentally-independent device such as a hot water heater 40 , a pool pump 70 , or a sprinkler system water pump (which may also be an environmentally-dependent device if it includes, for example, a rainfall sensor).
- customers interact with the ALD 100 and specify customer personal settings 138 that are recorded by the ALD 100 and stored in the ALD database 124 or other repository 500 .
- the personal settings 138 may specify time periods during which load control events are permitted, time periods during which load control events are prohibited, maximum allowable variances for an operating environment at a particular service point 20 (e.g., maximum and minimum temperature and/or humidity), normal operating conditions of devices at different times of day, and other personal preferences related to operation of devices under the control of the ALD 100 through the active load client 300 at the service point 20 .
- the present invention optionally tracks and takes into account the “drift” of an environmentally-dependent device.
- Drift occurs when the environmental characteristic(s) (e.g., temperature) monitored by an environmentally-dependent device begins to deviate (e.g., heat up or cool down) from a set point that is to be maintained by the environmentally-dependent device. Such deviation or drift may occur both normally and during control events. Thus, drift is the time it takes for the monitored environmental characteristic to move from a set point to an upper or lower comfort boundary when power, or at least substantial power, is not being consumed by the device.
- drift is a rate of change of the monitored environmental characteristic from a set point without use of significant power (e.g., without powering an HVAC unit compressor, but while continuing to power an associated digital thermostat and HVAC unit control system).
- devices such as HVAC units 50 , which control one or more environmental characteristics at a service point 20 , are also influenced or affected by the environment at the service point 20 because their activation or deactivation is based on one or more sensed environmental characteristics at the service point 20 .
- an HVAC unit 50 in cooling mode that attempts to maintain an inside temperature of 77.degree. F. activates when the inside temperature is some temperature greater than 77.degree. F. and, therefore, is influenced or affected by the environment in which the HVAC unit 50 operates.
- drift time is the time it takes for the sensed environmental characteristic to move from a comfort boundary to a set point when significant or substantial power is being supplied to the environmentally-dependent device.
- power time is a rate of change of the monitored environmental characteristic from a comfort boundary to a set point with significant use of power.
- drift may be considered the time required for the monitored environmental characteristic to move to an unacceptable level after power is generally turned off to an environmentally-dependent device.
- power time is the time required for the monitored environmental characteristic to move from an unacceptable level to a target level after power has been generally supplied or re-supplied to the environmentally-dependent device.
- the power consumption data for an environmentally-dependent device may be used to empirically determine the drift and power time (rate of change, temperature slope, or other dynamic equation (f ⁇ x ⁇ )) that defines an environmental characteristic's variation at a service point 20 , or at least within the operating area of the environmentally-dependent device, so as to permit the determination of a uniquely derived “fingerprint” or power usage/consumption pattern or behavior for the service point 20 or the environmentally-dependent device.
- drift and power time rate of change, temperature slope, or other dynamic equation (f ⁇ x ⁇ )
- an environmentally-dependent device will attempt to keep the applicable environmental characteristic or characteristics near the device's set point or set points.
- all devices whether environmentally-dependent or environmentally-independent, have a duty cycle that specifies when the device is in operation because many devices are not continuously in operation.
- the duty cycle ends when the environmental characteristic(s) being controlled reaches the set point (or within a given tolerance or variance of the set point).
- the environmentally-dependent device is generally turned off and the environmental characteristic is allowed to “drift” (e.g., upward or downward) toward a comfort boundary.
- the environmentally-dependent device is generally activated or powered on again until the environmental characteristic reaches the set point, which ends the duty cycle and the power time.
- Drift may also occur during a control event.
- a control event is an action that temporarily reduces, terminates, or otherwise interrupts the supply of power to a device.
- the environmental characteristic e.g., temperature
- the environmental characteristic monitored and/or controlled by an environmentally-dependent device will drift toward a comfort boundary (e.g., upper or lower) until the environmental characteristic reaches that boundary.
- a comfort boundary e.g., upper or lower
- the ALMS 10 generally returns or increases power to the device to enable the environmental characteristic to reach the set point again.
- an HVAC unit 50 may have a set point of 72.degree. F. and minimum and maximum comfort boundary temperatures of 68.degree. F. and 76.degree. F., respectively.
- a control event may interrupt power to the HVAC unit 50 causing the monitored temperature within the service point 20 to move toward the minimum comfort boundary temperature.
- the control event would end, and power would be restored or increased to the HVAC unit 50 , thus causing the monitored temperature to rise toward the set point.
- “drift” is the rate of change with respect to the time it takes the HVAC unit 50 to move from the set point to either the upper or lower comfort bounds.
- power time is the rate of change with respect to the time required for the HVAC unit 50 to move the monitored temperature from the upper or lower comfort bounds to the set point.
- drift and power time are calculated and recorded for each environmentally-dependent or environmentally-independent device or for each service point 20 .
- drift and other measurement data available from the ALD database 124 are used to create a power consumption behavior or pattern for each environmentally-dependent or environmentally-independent device or for each service point 20 .
- the other measurement data may include vacancy times, sleep times, times in which control events are permitted, and/or other variability factors.
- environmentally-dependent devices operating within such structures may be subject to control events for longer periods of time because the amount of time taken for the monitored environmental characteristic to reach a comfort boundary due to drift after being set to a set point is longer than for less efficient structures.
- the ALD 100 may identify service points 20 that have an optimum drift for power savings.
- the power savings application 120 calculates drift for each service point 20 and/or for each environmentally-dependent device at the service point 20 , and saves the drift information in the ALD database 124 as part of power consumption data for the device and/or the service point 20 .
- power saved as a result of drift during a control event increases overall power saved by the environmentally-dependent device at the service point 20 .
- FIG. 8 illustrates an exemplary operational flow diagram 800 providing steps executed by the ALD 100 to empirically analyze power usage of devices and populate a repository 500 with data samples resulting from such power usage analysis, in accordance with one embodiment of the present invention.
- the steps in FIG. 8 may be considered to implement a passive sampling algorithm.
- the steps of FIG. 8 are preferably implemented as a set of computer instructions (software) stored in memory (not shown) of the ALD 100 and executed by one or more processors 160 of the ALD 100 .
- the active load client 300 polls devices within the service point 20 , such as a washer/dryer 30 , hot water heater 40 , HVAC unit 50 , smart appliance 60 , pool pump 70 , or other devices within the service point 20 , and obtains current readings.
- the ALC interface 112 Upon receiving the current reading data from the active load client 300 , the ALC interface 112 sends the data to the ALC manager 108 .
- the ALC manager 108 stores the data to the sampling repository 500 , which may be implemented in the ALD database 124 using the operational flow illustrated in FIG. 8 .
- the following information may be provided as parameters to the operational flow of FIG. 8 : an identification (ID) of the device, temperature mode (either “heating” or “cooling”), duty cycle, current temperature read by the device, and previous temperature read by the device.
- ID an identification
- temperature mode either “heating” or “cooling”
- duty cycle current temperature read by the device
- previous temperature read by the device Each temperature reading includes a device ID, a set point (which is only useful for environmentally-dependent devices), and variability factor measurement data (as described previously).
- the ALD 100 determines ( 802 ) whether the device used any, or at least any appreciable amount of, energy. If not, then the logic flow ends. Otherwise, the ALD 100 determines ( 804 ) the time duration of the data sample, the time duration when the device was on, and the time duration when the device was off based on the data sample. Next, the ALD 100 determines ( 806 ) whether the received data comes from an environmentally-dependent device or an environmentally-independent (e.g., binary state) device. If the received data comes from an environmentally-dependent device, then the ALD 100 determines ( 808 ) the energy used per minute for the device, and determines ( 810 ) whether the device is drifting or powering.
- an environmentally-dependent device e.g., binary state
- the ALD 100 determines that the device is drifting if the environmental characteristic monitored by the device is changing in a manner opposite the mode of the device (e.g., the room temperature is rising when the device is set in cooling mode or the room temperature is decreasing when the device is set in heating mode). Otherwise, the device is not drifting.
- the environmental characteristic monitored by the device is changing in a manner opposite the mode of the device (e.g., the room temperature is rising when the device is set in cooling mode or the room temperature is decreasing when the device is set in heating mode). Otherwise, the device is not drifting.
- the ALD 100 determines ( 814 ) the drift rate (e.g., degrees per minute). On the other hand, if the device is not drifting, then the ALD 100 determines ( 812 ) the power time rate. Once either the drift rate or the power time rate has been calculated, the ALD 100 determines ( 880 ) whether there is already a record in the sampling repository 500 for the device being measured under the present operating conditions of the device (e.g., set point and other variability factors (e.g., outside temperature)).
- the drift rate e.g., degrees per minute
- the ALD 100 determines ( 812 ) the power time rate. Once either the drift rate or the power time rate has been calculated, the ALD 100 determines ( 880 ) whether there is already a record in the sampling repository 500 for the device being measured under the present operating conditions of the device (e.g., set point and other variability factors (e.g., outside temperature)).
- the ALD 100 creates ( 882 ) a new record using, for example, the device's ID, time of record, current set point, current outside temperature, energy used per minute, power time rate, and drift rate (assuming that either a power time rate or a drift rate has been determined). However, if there is an existing record, then the ALD 100 updates ( 884 ) the existing record by averaging the new data (including energy usage, drift rate, and power time rate) with the existing data and storing the result in the repository 500 .
- the ALD 100 determines ( 842 ) the energy used per minute for the device and further determines ( 844 ) the energy saved per minute for the device.
- the ALD 100 searches the repository 500 (e.g., ALD database ( 124 )) to determine ( 890 ) whether there is already a record for the device for the applicable time period. If there is no existing record, then the ALD 100 creates ( 892 ) a new record using the device's ID, time of record, current time block, energy used per minute, and energy saved per minute.
- the ALD 100 updates ( 894 ) the existing record by averaging the new data (including energy usage and energy savings) for the time block with the existing data for the time block and stores the result in the repository 500 .
- energy usage and energy savings are saved with respect to a block or period of time.
- FIG. 9 illustrates an exemplary operational flow diagram 900 providing steps executed by the ALD 100 to project or generate the energy usage expected of a device during a future time period in a given environment setting, in accordance with one embodiment of the present invention.
- the steps of FIG. 9 are preferably implemented as a set of computer instructions (software) stored in memory (not shown) of the ALD 100 and executed by one or more processors 160 of the ALD 100 .
- the operational flow of FIG. 9 may be executed by the power savings application 120 of the ALD 100 when a utility operator, or other operator of the ALD 100 , wants to project the energy usage for a device over a specified time period in the future, such as during a period of time in which a control event is to occur.
- the following information may be provided as parameters to the operational flow of FIG. 9 : the device ID, the start time of the future time period, the end time of the future time period, the manage mode of the device, and, for an environmentally-independent device, a binary control factor.
- the manage mode is either “control” or “normal” to indicate whether the device is being measured during a control event or during normal operation, respectively.
- the binary control factor is preferably utilized for environmentally-independent devices and represents the duty cycle of the device. For example, if a water heater 40 runs at 20% duty cycle, the binary control factor is 0.2.
- the ALD 100 determines ( 902 ) a future time period based on the start and stop times.
- the future time period may be set by the utility implementing the load control procedure of the present invention or a second utility that has requested delivery of operating reserve power from the utility implementing the load control procedure of the present invention.
- the power savings application 120 begins the procedure for projecting or generating the amount of power that can be saved as the result of execution of a control event during the future time period. Accordingly, the power savings application 120 analyzes the devices to be controlled during the control event. Thus, the power savings application 120 determines ( 904 ) whether the devices include both environmentally-dependent and environmentally-independent (e.g., binary state) devices.
- the power savings application 120 determines ( 920 ) whether the device is in environment controlling (e.g., heating or cooling) mode. Next, the power savings application 120 retrieves ( 922 ) the anticipated set points for the device during the future time period of the control event and obtains ( 924 ) information regarding the outside environmental characteristic(s) (e.g., the outside temperatures) expected during the control event time period. The power savings application 120 then makes projections ( 926 ) about the device's expected power consumption behavior during the future time period. In one embodiment, the projection determination of block 926 is implemented using a best match algorithm, as described in detail below with respect to FIG.
- the power consumption behavior of the device is used to determine the amount of energy that would be expected to be used by the device if the control event did not occur and, thus, the amount of energy generated or expected to be saved per unit time during the control event.
- the power savings application 120 multiplies ( 928 ) the saved power per unit time by the time duration of the future control event to determine the total amount of energy projected to be used by the device in the absence of the control event.
- the power savings application returns ( 980 ) the total projected amount of energy used by the device in the absence of the proposed control event.
- the power savings application 120 determines ( 904 ) that the proposed control event is to affect an environmentally-independent device, then the power savings application 120 determines ( 960 ) whether the device is currently scheduled to be on or off during the proposed time period of the control event. Next, the power savings application 120 creates, obtains, or otherwise determines ( 962 ) a list of time blocks for the specified control event time period. The power savings application 120 then makes projections ( 964 ) about the device's power consumption behavior during the future, control event time period. In one embodiment, the projection determination of block 964 is implemented using a best match algorithm, as described in detail below with respect to FIG.
- the power savings application 120 multiplies ( 968 ) the saved power per unit time by the time duration of the future control event to determine the total amount of energy projected to be used in the absence of the control event.
- the power savings application 120 multiplies ( 972 ) the total amount of energy times the binary control factor to determine the amount of energy projected to be used by the device in the absence of the control event.
- the power savings application returns ( 980 ) the total projected amount of energy used by the device in the absence of the proposed control event.
- FIG. 9 may be used for each controlled device at a service point, for the controlled devices at multiple service points, or for all the controlled devices at all the service points supplied or supported by a utility.
- the total projected energy usage by the devices may be aggregated across a single service point, for all service points within a group, and/or for all groups served by the utility.
- FIG. 10 illustrates an exemplary operational flow diagram 1000 providing steps executed by the ALD 100 for generating power consumption behavior of a device in accordance with an exemplary embodiment of the present invention.
- the algorithm or operational flow illustrated in FIG. 10 provides one embodiment for implementing steps 926 and 964 of FIG. 9 .
- the operational flow of FIG. 10 determines which record or records in the sampling repository 500 provides the closest match to a given environment or operational setting for use in projecting device energy usage/savings during a time period of a future control event, in accordance with one embodiment of the present invention.
- the steps of FIG. 10 are preferably implemented as a set of computer instructions (software) stored in memory (not shown) of the ALD 100 and executed by one or more processors 160 of the ALD 100 .
- the operational flow of FIG. 10 may be initiated by the ALD 100 when trying to identify or determine the sampling repository record or records that best match the power consumption behavior of a device in a specific setting.
- the operational flow of FIG. 10 is called during execution of the operational flow of FIG. 9 as noted above.
- the operational flow of FIG. 9 provides the operational flow of FIG. 10 with parameters that indicate the type of records to be searched. These parameters include, but are not limited to: a device ID, a duty mode (either on or off), a time period (e.g., corresponding to the time period of the proposed future control event), a set point delta, a delta or variance related to one or more environmental characteristics (e.g., outside temperature), and a time block delta.
- Duty mode signifies the duty cycle of the device. If the duty mode is TRUE or ON, significant power is being consumed.
- Duty cycle exists for switch-controlled, binary state, or environmentally-independent devices which go ON and OFF irrespective of the influence or affect of environment.
- duty mode is always ON.
- Set point delta is the amount a set point may be varied during a search in order to find a matching repository record.
- Outside temperature/environmental characteristic delta is the number of temperature degrees or other change in environmental characteristics over which data relating to the outside temperature or other environmental characteristics may be varied during a search in order to find a matching repository record.
- Time block delta is the amount of time a time block may be varied during a search in order to find a matching repository record.
- the ALD 100 determines ( 1002 ) whether the requested repository search relates to an environmentally-dependent device or an environmentally-independent device. If the search relates to an environmentally-dependent device, then the ALD 100 attempts to find ( 1004 ) power consumption records in the sampling repository 500 that match the device ID, duty mode, environmental characteristic (e.g., temperature) set point, and associated outside environmental characteristic data. Power consumption records include power consumption data, such as power consumed, current drawn, duty cycle, operating voltage, operating impedance, time period of use, set points, ambient and outside temperatures during use (as applicable), and/or various other energy use data. If a record exists that matches all the power consumption search criteria, such record would be considered the record that most closely matches the given environment setting.
- power consumption records include power consumption data, such as power consumed, current drawn, duty cycle, operating voltage, operating impedance, time period of use, set points, ambient and outside temperatures during use (as applicable), and/or various other energy use data. If a record exists that matches all the power consumption search criteria, such record would be
- the ALD 100 begins looking for records that slightly differ from the given environment setting.
- the ALD 100 incrementally increases or decreases ( 1012 ) the environment-related search criteria (e.g., temperature set point and/or outside/ambient temperature) using the set point delta and the outside temperature/environmental characteristic delta as a guide to look for relevant records.
- the environment-related search criteria e.g., temperature set point and/or outside/ambient temperature
- Such incremental/iterative modification of the search criteria continues until either relevant records are found or some applicable limit (e.g., as indicated by the set point delta and/or other parameter deltas) is reached.
- the ALD 100 determines ( 1002 ) that the search relates to an environmentally-independent device, then the ALD 100 attempts to find ( 1040 ) power consumption records in the sampling repository 500 that match the device ID, duty mode, and time of operation (corresponding to the expected, future time of the control event). If a record is not found that matches all the search criteria ( 1070 ), then the ALD 100 modifies its search to look for records that slightly differ from the given environment setting. In one embodiment, the ALD 100 modifies its search by incrementally increasing or decreasing ( 1072 ) the time of operation for a given duty mode. The iterative searching continues until either relevant records are found or some applicable limit (e.g., as indicated by the time block delta or other parameter deltas) is reached.
- some applicable limit e.g., as indicated by the time block delta or other parameter deltas
- Any records that were found as a result of the search are provided ( 1060 ) to the requesting program (e.g., the operational flow of FIG. 9 ).
- the result of the operational flow of FIG. 10 is a set of one or more power consumption records from the sampling repository 500 that are the closest match to the given environment or proposed control event setting.
- FIG. 11 illustrates an exemplary operational flow diagram 1100 providing steps executed by the ALD 100 to project energy savings through power interruption or reduction to a device during a control event, in accordance with one embodiment of the present invention.
- the steps of FIG. 11 are preferably implemented as a set of computer instructions (software) stored in memory (not shown) of the ALD 100 and executed by one or more processors 160 of the ALD 100 .
- the operational flow of FIG. 11 may be executed by the power savings application 120 when an operator of the utility or of the ALD 100 wants to project the energy savings for a device over a specified time period during operation of a control event.
- the following information may be provided as parameters to the operational flow of FIG. 11 : a device ID, a start time of the control event, an end time of the control event, and a binary control factor, as described above in connection with FIG. 9 .
- the ALD 100 e.g., power savings application 120
- the power savings application 120 projects ( 1104 ) the power consumption for the device during the control event using, for example, the operational flow of FIG. 9 .
- the device may be projected to be on and consuming power for some amount of time during the time period of the control event.
- both the expected amount of power consumed during normal operation (i.e., in the absence of any control event) and the expected amount of power consumed during the control event are determined to accurately assess any possible power savings as a result of the control event.
- the power savings application 120 calculates ( 1106 ) the difference between the two values, which is the projected power consumption for the device during the control event time period. Because the projected power consumption will not be realized during the control event, such power consumption corresponds directly to an amount of energy saved during the control event.
- the power savings application 120 returns ( 1108 ) the projected energy savings value.
- the power savings application 120 may aggregate the projected power savings for all controlled devices at a service point 20 , for all controlled devices at service points within a group, or for controlled devices within all service point groups served by the utility to obtain an aggregate amount of power savings as a result of a control event.
- a number of renewable energy sources such as wind power and solar power, are variable in nature. That is, such energy sources do not generate power at a constant rate. For example, wind increases or decreases from moment to moment. Wind turbines can generate a large amount of power due to large winds or can stop generating completely due to lack of any wind. Solar panels may be able to generate a great deal of power on very sunny days, a little power on cloudy days, and virtually no power at night.
- the ALMS 10 may utilize the processes disclosed above to provide additional operating reserve to compensate for the lack of power generation by the renewable energy source and for the effects resulting therefrom, including output frequency instability.
- a utility utilizing wind or solar energy sources may further incorporate the ALMS 10 into the utility distribution system to provide regulating reserve during time periods of under-generation.
- FIG. 12 is a graph that depicts the “load profile” of a utility over a predetermined time period, showing actual energy usage as well as projected energy usage determined with and without a control event in accordance with an exemplary embodiment of the present invention.
- the load profile graph depicts the following:
- the capacity under contract is shown as a straight double line at the top of the graph and indicates the baseline power consumption 1202 .
- the baseline power consumption 1202 represents the total amount of power that the utility is obligated to provide.
- the actual interruptible load usage 1208 is the actual energy usage of all devices controlled by the utility.
- the projected interruptible load usage 1204 at the bottom of the load profile graph is the projected energy used when control events are used, and the projected interruptible load available 1206 is the projected energy usage when control events are not used.
- the difference between the projected interruptible load usage 1204 and the projected interruptible load available 1206 is the capacity that may be used for operating reserve, including regulating reserve, spinning reserve, and non-spinning reserve.
- the utility would still be in danger of using non-spinning reserve or even running out of reserve capacity altogether. In such a situation, the utility would be in a “critical control” mode.
- critical control mode the utility may override all customer preferences, including both those who voluntarily participate in power saving programs and those who do not.
- the utility may utilize the ALD 100 to adjust settings of environmentally-dependent devices to settings outside of normal comfort preferences (but not life-threatening). Invoking critical control enables a utility to return power demand to acceptable levels.
- the ALMS 10 may help a utility mitigate the likelihood of critical control situations. For example, whenever a customer overrides or opts out of a control event, the ALMS 10 , using the techniques disclosed herein, finds additional customers who may be the target of a voluntary control event. Analogously, when controlled devices that are participating in a control event are required to exit the control event due to customer preferences (e.g., the amount of time that the customer's devices may participate in a control event), the ALD 100 may release such devices from the control event and replace them with other voluntarily controlled devices. The replacement devices would then preferably supply, through deferment, at least the same amount of reserve power as was being sourced by the devices that were released from the control event. Thus, the system 10 of the present invention increases the likelihood that a utility will be able to spread control events to other customers before invoking critical control.
- customer preferences e.g., the amount of time that the customer's devices may participate in a control event
- the replacement devices would then preferably supply, through deferment, at least
- the entire ALMS 10 described in FIG. 3 may also be implemented in a proprietary network that is IP-based, real-time, temperature-derived, verifiable, interactive, two-way, and responsive to Automatic Generation Control (AGC) commands to produce operating reserve power through implementation of control events.
- AGC Automatic Generation Control
- the sampling data stored in the repository 500 using the operational flow of FIG. 5 could also include other factors (called “variability factors”) related to power consumption, such as day of the week, humidity, amount of sunshine, or number of people in the household.
- This additional data would allow the projected energy usage and projected energy savings to be more accurate based on these additional factors.
- the ALD 100 may obtain the additional data from sources within and/or external to the ALMS 10 , such as weather databases, live weather feeds from sources such as National Weather Reporting stations, outdoor sensors 94 , or any weather related input device commercially available on a real time or predictive basis, calendars, and voluntary customer feedback. Some of the variability factor measurements are available from public sources, while others are available via private sources.
- transmission line loss may be included in the projected energy savings determination of FIG. 11 .
- the amount of power supplied by a utility to source a device remote from the utility equals the amount of power required by the device plus the amount of power lost in the transmission lines between the utility's power generation plant and the location of the device.
- the projected energy savings resulting from a control event may be determined by determining an amount of power expected to be consumed by the controlled device or devices at a service point, at multiple service points or throughout the entire service area of the utility during the time period of the control event absent occurrence of the control event to produce first energy savings, determining an amount of power that is not expected to be dissipated in transmission lines as a result of not delivering power to the controlled device or devices during the control event to produce second energy savings, and summing the first energy savings and the second energy savings.
- the operating reserve (e.g., spinning reserve or regulating reserve) determined by a utility using the techniques disclosed above can be sold to a requesting utility 1306 , as illustrated in FIG. 13 , which is essentially a replication of FIG. 9 of U.S. Patent Application Publication No. US 2009/0063228 A1, which is incorporated herein by reference in its entirety.
- the saved power may then be distributed to the requesting utility 1306 after commencement of the control event (e.g., during and/or after completion of the control event) conducted by the selling utility.
- the selling utility may be a virtual utility 1302 or a serving utility 1304 as illustrated in FIG.
- a third party may serve as a managing entity to manage operation of the ALMS 10 and the resultant distribution of operating reserve to a requesting utility 1306 subsequent to commencement of a control event.
- the ALD 100 for a utility may determine projected energy savings for each service point 20 served by the utility in accordance with the operational flow of FIG. 11 and aggregate the projected energy savings across all service points served by the utility to obtain the total projected energy savings from which operating reserve may be determined as described above.
- the ALD 100 may determine whether the repository 500 includes power consumption data for the device during time periods before and after the expected time period of the control event and, if so, interpolate a value corresponding to an amount of power expected to be consumed by the device during the time period of the control event based on the power consumption data for the device during the time periods before and after the expected time period of the control event.
- the power supply value (PSV) associated with each of the at least one power consuming device(s) is used to determine or generate the power consumption behavior and commercial value for the response to the control event associated with the power consuming device(s).
- the present invention provides systems and methods that receive electric power from an electric power grid, the systems and methods including: at least one power consuming device that requires electric power to operate; at least one controllable device operably coupled to the at least one power consuming device, the at least one controllable device operable to control a flow of grid-supplied electric power to the at least one power consuming device responsive to power control instructions, wherein each of the at least one power consuming devices has a corresponding power supply value (PSV); a backup power subsystem operably coupled to the at least one power consuming device, the backup power subsystem operable to automatically supply electric power to the at least one power consuming device when a flow of grid-supplied electric power to the at least one power consuming device drops below a threshold; and a client device operable to receive power control messages from a remote system control component and provide power control instructions to the at least one controllable device responsive to the power control messages, wherein a first received power control message instructs the client device to disable a flow of grid-supplied electric power to the at least
- systems and methods for a client device at a base transceiver site to control a flow of electric power from an electric power grid to a collocated base transceiver system so as to provide operating reserve for to the electric power grid the base transceiver system including at least one base transceiver unit operable to provide wireless communication capability, a controllable device operable to control a flow of grid-supplied electric power to the at least one base transceiver unit, and a backup power subsystem operable to supply electric power to the at least one base transceiver unit when a flow of grid-supplied electric power to the at least one base transceiver unit drops below a threshold
- the method including the steps of: receiving power control messages from a remote system control component, at least a first received power control message instructing the client device to disable a flow of grid-supplied electric power to the at least one base transceiver unit; and providing a first power control instruction to the at least one controllable device responsive to the first received power control message, the first power control instruction instruct
- method for a client device located at an electrical service point to control a flow of electric power from an electric power grid to the service point so as to provide operating reserve to the electric power grid the service point including at least one power consuming device operable to consume electric power, at least one controllable device operable to control a flow of grid-supplied electric power to the at least one power consuming device, and a backup power subsystem operable to supply electric power to the at least one power consuming device when a flow of grid-supplied electric power to the at least one power consuming device is reduced below a threshold
- the method including the steps of: receiving power control messages from a remote system control component, at least a first power control message instructing the client device to disable a flow of grid-supplied electric power to the at least one power consuming device; and providing a first power control instruction to the at least one controllable device responsive to the first power control message, the first power control instruction instructing the at least one controllable device to disable a flow of grid-supplied electric power to the at least
- a requesting utility may utilize a method for acquiring operating reserve power from a sourcing utility.
- the requesting utility requests operating reserve power from the sourcing utility sufficiently in advance of a transfer time at which the operating reserve power will be needed so as to facilitate measurable and verifiable load-controlled generation of the operating reserve power.
- the load-controlled generation of the operating reserve power results from a determination of operating reserve as detailed above with respect to FIGS. 7 - 12 .
- the requesting utility receives an acknowledgment from the sourcing utility indicating that the sourcing utility will supply the operating reserve power at the transfer time. Then, at the transfer time and for a time period thereafter, the requesting utility receives at least some of the operating reserve power from the sourcing utility.
- the operating reserve determination techniques may be utilized by a virtual utility 1302 as disclosed in U.S. Patent Application Publication No. US 2009/0063228 A1, which is incorporated herein by reference in its entirety.
- the virtual utility 1302 may be operable to at least offer energy to one or more requesting utilities 1306 for use as operating reserve for the requesting utilities 1306 .
- the virtual utility 1302 may include, among other things, a repository 500 and a processor 160 (e.g., within an ALD 100 ).
- the processor 160 is operable to remotely determine, during at least one period of time, power consumed by at least one device to produce power consumption data.
- the processor 160 is further operable to store the power consumption data in the repository 500 and, at the appropriate time, determine an expected, future time period for a control event during which power is to be reduced to the device or devices.
- the processor 160 is also operable to generate, prior to commencement of the control event, power consumption behavior expected of the device or devices during the time period of the control event based at least on the stored power consumption data.
- the processor 160 is further operable to determine, prior to commencement of the control event, projected energy savings resulting from the control event based at least on the power consumption behavior of the device or devices. Still further, the processor 160 is operable to determine, prior to commencement of the control event, operating reserve based on the projected energy savings. After determination of the operating reserve, the processor 160 is operable to communicate an offer to supply the operating reserve to a requesting utility 1306 or utilities.
- the present invention encompasses a system and method for determining operating reserve capacity using an ALD or comparable device, software, or combination thereof so that the operating reserve capacity may be made available to the power utility that generated the operating reserve through load control or to the power market generally (e.g., via the FERC grid).
- the utility When a utility requires power beyond its native load, the utility must make use of its operating reserve or acquire the additional power via the FERC grid from other utilities.
- one type of operating reserve is spinning reserve. Spinning reserve is additional generating capacity that is already connected to the power system and, thus, is almost immediately available.
- the ALD makes spinning reserve available to a utility.
- a utility power generating utility or a virtual utility
- the spinning reserve is measurable and verifiable, and can be projected for a number of days in advance, and such projections can be sold to other utilities on the open market.
- the ALD 100 may be considered to implement a type of flexible load-shape program.
- the load-shape program implemented by the ALD 100 projects an amount of operating reserve resulting from selective control of devices (loads) based on known, real-time customer preferences.
- the ALD 100 can project power savings, as well as operating reserve (e.g., regulating, spinning and/or non-spinning reserve) that is active, real-time, verifiable, and measurable so as to comply with protocols and treaties established for the determination of carbon credits and offsets, as well as renewable energy credits.
- the information acquired by the ALD 100 is not simply samples of customer preferences and data, but actual power consumption information.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Automation & Control Theory (AREA)
- General Engineering & Computer Science (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
A utility employs a method for generating available operating reserve. Electric power consumption by at least one device serviced by the utility is determined during at least one period of time to produce power consumption data, stored in a repository. A determination is made that a control event is to occur during which power is to be reduced to one or more devices. Prior to the control event and under an assumption that it is not to occur, power consumption behavior expected of the device(s) is generated for a time period during which the control event is expected to occur based on the stored power consumption data. Additionally, prior to the control event, projected energy savings resulting from the control event, and associated with a power supply value (PSV) are determined based on the devices' power consumption behavior. An amount of available operating reserve is determined based on the projected energy savings.
Description
-
CROSS-REFERENCE TO RELATED APPLICATIONS
-
This application is related to and claims priority from the following U.S. patent applications: it is a continuation of U.S. patent application Ser. No. 16/415,322, filed May 17, 2019, which is a continuation of U.S. patent application Ser. No. 14/844,871, filed Sep. 3, 2015 and issued as U.S. Pat. No. 10,295,969, which is a divisional of U.S. patent application Ser. No. 13/471,589 filed May 15, 2012 and issued as U.S. Pat. No. 9,130,402, which is a continuation-in-part of U.S. patent application Ser. No. 12/775,979 filed May 7, 2010 and issued as U.S. Pat. No. 8,396,606, which claims priority from U.S. Provisional Patent Application No. 61/215,725 filed May 8, 2009. U.S. patent application Ser. No. 13/471,589 is also a continuation-in-part of U.S. patent application Ser. No. 13/019,867, filed Feb. 2, 2011 and issued as U.S. Pat. No. 8,996,183. All the above-mentioned documents are incorporated herein by reference in their entirety.
BACKGROUND OF THE INVENTION
1. Field of the Invention
-
The present invention relates generally to the field of electric power supply and generation systems and, more particularly, to a system and method for generating and/or providing dispatchable operating reserve energy capacity for an electric utility using active load management so that the reserve capacity may be made available to the utility or to the general power market (e.g., via a national grid).
2. Description of Related Art
-
Energy demand within a utility's service area varies constantly. Such variation in demand can cause undesired fluctuations in line frequency if not timely met. To meet the varying demand, a utility must adjust its supply or capacity (e.g., increase capacity when demand increases and decrease supply when demand decreases). However, because power cannot be economically stored, a utility must regularly either bring new capacity on-line or take existing capacity off-line in an effort to meet demand and maintain frequency. Bringing new capacity online involves using a utility's reserve power, typically called “operating reserve.” A table illustrating a utility's typical energy capacity is shown in
FIG. 1. As shown, operating reserve typically includes three types of power: so-called “regulating reserve,” “spinning reserve,” and “non-spinning reserve” or “supplemental reserve.” The various types of operating reserve are discussed in more detail below.
-
Normal fluctuations in demand, which do not typically affect line frequency, are responded to or accommodated through certain activities, such as by increasing or decreasing an existing generator's output or by adding new generating capacity. Such accommodation is generally referred to as “economic dispatch.” A type of power referred to as “contingency reserve” is additional generating capacity that is available for use as economic dispatch to meet changing (increasing) demand. Contingency reserve consists of two of the types of operating reserve, namely, spinning reserve and non-spinning reserve. Therefore, operating reserve generally consists of regulating reserve and contingency reserve.
-
As shown in
FIG. 1, spinning reserve is additional generating capacity that is already online (e.g., connected to the power system) and, thus, is immediately available or is available within a short period of time after a determined need (e.g., within ten (10) to fifteen (15) minutes, as defined by the applicable North American Electric Reliability Corporation (NERC) regulation). More particularly, in order for contingency reserve to be classified as “spinning reserve,” the reserve power capacity must meet the following criteria: a) be connected to the grid; b) be measurable and verifiable; and c) be capable of fully responding to load typically within 10-15 minutes of being dispatched by a utility, where the time-to-dispatch requirements of the spinning reserve are generally governed by a grid system operator or other regulatory body, such as NERC.
-
Non-spinning reserve (also called supplemental reserve) is additional generating capacity that is not online, but is required to respond within the same time period as spinning reserve. Typically, when additional power is needed for use as economic dispatch, a power utility will make use of its spinning reserve before using its non-spinning reserve because (a) the generation methods used to produce spinning reserve capacity typically tends to be cheaper than the methods, such as one-way traditional demand response, used to produce non-spinning reserve or (b) the consumer impact to produce non-spinning reserve is generally less desirable than the options used to produce spinning reserve due to other considerations, such as environmental concerns. For example, spinning reserve may be produced by increasing the torque of rotors for turbines that are already connected to the utility's power grid or by using fuel cells connected to the utility's power grid; whereas, non-spinning reserve may be produced from simply turning off resistive and inductive loads such as heating/cooling systems attached to consumer locations. However, making use of either spinning reserve or non-spinning reserve results in additional costs to the utility because of the costs of fuel, incentives paid to consumers for traditional demand response, maintenance, and so forth.
-
If demand changes so abruptly and quantifiably as to cause a substantial fluctuation in line frequency within the utility's electric grid, the utility must respond to and correct for the change in line frequency. To do so, utilities typically employ an Automatic Generation Control (AGC) process or subsystem to control the utility's regulating reserve. To determine whether a substantial change in demand has occurred, each utility monitors its Area Control Error (ACE). A utility's ACE is equal to the difference in the scheduled and actual power flows in the utility grid's tie lines plus the difference in the actual and scheduled frequency of the supplied power multiplied by a constant determined from the utility's frequency bias setting. Thus, ACE can be written generally as follows:
-
ACE=(NI.sub.A−NI.sub.S)+(−10B.sub.1)(F.sub.A−F.sub.S), [Equation 1], where NI.sub.A is the sum of actual power flows on all tie lines, Ni.sub.S is the sum of scheduled flows on all tie lines, B.sub.1 is the frequency bias setting for the utility, F.sub.A is the actual line frequency, and F.sub.S is the scheduled line frequency (typically 60 Hz).
-
In view of the foregoing ACE equation, the amount of loading relative to capacity on the tie lines causes the quantity (NI.sub.A−NI.sub.S) to be either positive or negative. When demand is greater than supply or capacity (i.e., the utility is under-generating or under-supplying), the quantity (NI.sub.A−NI.sub.S) is negative, which typically causes ACE to be negative. On the other hand, when demand is less than supply, the quantity (NI.sub.A−NI.sub.S) is positive (i.e., the utility is over-generating or over-supplying), which typically causes ACE to be positive. The amount of demand (e.g., load) or capacity directly affects the quantity (NI.sub.A−NI.sub.S); thus, ACE is a measure of generation capacity relative to load. Typically, a utility attempts to maintain its ACE very close zero using AGC processes.
-
If ACE is not maintained close to zero, line frequency can change and cause problems for power consuming devices attached to the electric utility's grid. Ideally, the total amount of power supplied to the utility tie lines must equal the total amount of power consumed through loads (power consuming devices) and transmission line losses at any instant of time. However, in actual power system operations, the total mechanical power supplied by the utility's generators is seldom exactly equal to the total electric power consumed by the loads plus the transmission line losses. When the power supplied and power consumed are not equal, the system either accelerates (e.g., if there is too much power in to the generators) causing the generators to spin faster and hence to increase the line frequency or decelerates (e.g., if there is not enough power into the generators) causing the line frequency to decrease. Thus, variation in line frequency can occur due to excess supply, as well as due to excess demand.
-
To respond to fluctuations in line frequency using AGC, a utility typically utilizes “regulating reserve,” which is one type of operating reserve as illustrated in
FIG. 1. Regulating reserve is used as needed to maintain constant line frequency. Therefore, regulating reserve must be available almost immediately when needed (e.g., in as little as a few seconds to less than about five (5) minutes). Governors are typically incorporated into a utility's generation system to respond to minute-by-minute changes in load by increasing or decreasing the output of individual generators and, thereby, engaging or disengaging, as applicable, the utility's regulating reserve.
-
The Federal Energy Reliability Commission (FERC) and NERC have proposed the concept of Demand Side Management (DSM) as an additional approach to account for changes in demand. DSM is a method in which a power utility carries out actions to reduce demand during peak periods. Examples of DSM include encouraging energy conservation, modifying prices during peak periods, direct load control, and others.
-
Current approaches for using DSM to respond to increases in demand have included using one way load switches that interrupt loads, as well as statistics to approximate the average amount of projected load removed by DSM. A statistical approach is employed because of the utility's inability to measure the actual load removed from the grid as a result of a DSM load control event. In addition, current DSM approaches have been limited to use of a single power measuring meter among every one hundred (100) or more service points (e.g., residences and/or businesses). Accordingly, current DSM approaches are inadequate because they rely on statistical trends and sampling, rather than on empirical data, to make projections and measure actual load removal events.
-
More recently, FERC and NERC have introduced the concept of flexible load-shape programs as a component of DSM. These programs allow customers to make their preferences known to the utility concerning timing and reliability of DSM load control events. However, DSM approaches utilizing load-shaping programs do not meet all of the criteria for implementing regulating reserve or spinning reserve, such as being dispatchable within 15 minutes or less. Additionally, in order for a generating source to be considered dispatchable energy, it must be forecasted twenty-four (24) hours prior to being delivered to a utility. Current DSM approaches do not facilitate accurate forecasting twenty-four (24) hours in advance due to their heavy reliance on statistics.
-
Therefore, there is a need for utilities to be able to create operating reserve, especially regulating and/or spinning reserve, by using accurate forecasting and flexible load shaping techniques. There is a further need to involve the consumer in a two-way approach in which the consumer can make their energy consumption preferences known and the utility can make use of those preferences to respond to increased demand and maintain line frequency regulation.
SUMMARY OF THE INVENTION
-
The present invention provides methods and systems for generating operating reserves.
-
Accordingly, the present invention is directed to a method for generating operating reserves of a utility and/or any market participant of an electric power grid servicing one or more service points, the method including the steps of: determining amounts of electric power consumed by at least a first set of devices during at least one period of time to produce power consumption data, and a first power supply value (PSV) associated with each of the first set of devices, the first set of devices being located at the one or more service points; storing the power consumption data and the first PSV in a repository; determining that a control event is to occur during which a supply of electric power is to be reduced to at least the first set of devices; generating, prior to commencement of the control event and under an assumption that the control event is not to occur, power consumption behavior expected of the first set of devices during a first period of time based at least on the stored power consumption data, wherein the control event is expected to occur during the first period of time; determining, prior to commencement of the control event, projected energy savings resulting from the control event based at least on the actual power consumption behavior of the first set of devices; determining, prior to commencement of the control event, amounts of electric power stored by a second set of devices located at the one or more service points to produce stored power data, and a second power supply value (PSV) associated with each of the second set of devices; and determining, prior to commencement of the control event, an amount of available operating reserve based on the projected energy savings, the PSVs, and the stored power data.
-
The present invention is further directed to a grid operator and/or system that provides electrical service to one or more remotely located service points, each service point including at least one device that consumes power during operation thereof, the grid operator including: a repository; and at least one processor coupled to the repository, the at least one processor operable to: determine amounts of electric power consumed by the at least a first set of devices during at least one period of time to produce power consumption data and corresponding power supply values (PSVs) for the devices; store the power consumption data in the repository; determine that a control event is to occur during which a supply of electric power is to be reduced to at least the first set of devices; determine, prior to commencement of the control event and under an assumption that the control event is not to occur, power consumption behavior expected of at least the first set of devices for a first period of time based at least on the stored power consumption data, wherein the control event is expected to occur during the first period of time; determine, prior to commencement of the control event, projected energy savings resulting from the control event based at least on the actual power consumption behavior and PSVs of at least the first set of devices; determine, prior to commencement of the control event, amounts of electric power stored by at least a second set of devices located at the one or more service points to produce stored power data and PSVs corresponding to the at least second set of devices; and determine, prior to commencement of the control event, an amount of available operating reserve based on the projected energy savings, the PSVs, and the stored power data.
BRIEF DESCRIPTION OF THE DRAWINGS
- FIG. 1
is a table showing the base load power requirements and operating reserve available to an electric power utility.
- FIG. 2
is a block diagram illustrating how an active load management system in accordance with the present invention provides additional operating (e.g., regulating, spinning and/or non-spinning) reserve to a power utility.
- FIG. 3
is a block diagram of an exemplary IP-based, active load management system in accordance with one embodiment of the present invention.
- FIG. 4
is a block diagram illustrating an exemplary active load director as shown in the power load management system of
FIG. 3.
- FIG. 5
is a block diagram illustrating generation of an exemplary sampling repository at the active load director of
FIG. 4or some other location in an electric utility.
- FIG. 6
is a screen shot of an exemplary web browser interface through which a customer may designate his or her device performance and energy saving preferences for an environmentally-dependent, power consuming device in accordance with one embodiment of the present invention.
- FIG. 7
is a screen shot of an exemplary web browser interface through which a customer may designate his or her device performance and energy saving preferences for an environmentally-independent, power consuming device in accordance with another embodiment of the present invention.
- FIG. 8
is an operational flow diagram illustrating a method for empirically analyzing power usage of power consuming devices and populating a repository with data samples resulting from such power usage analysis, in accordance with an exemplary embodiment of the present invention.
- FIG. 9
is an operational flow diagram illustrating a method for projecting energy usage for a power consuming device in accordance with an exemplary embodiment of the present invention.
- FIG. 10
is an operational flow diagram illustrating a method for generating power consumption behavior of a power consuming device in accordance with an exemplary embodiment of the present invention.
- FIG. 11
is an operational flow diagram illustrating a method for projecting energy savings through power interruption to a power consuming device during a control event, in accordance with an exemplary embodiment of the present invention.
- FIG. 12
is a graph that depicts a load profile of a utility during a projected time period, showing actual energy usage as well as projected energy usage determined with and without a control event, in accordance with an exemplary embodiment of the present invention.
- FIG. 13
is a block diagram of a system for implementing a virtual electric utility in accordance with an exemplary embodiment of the present invention.
DETAILED DESCRIPTION
-
Before describing in detail exemplary embodiments that are in accordance with the present invention, it should be observed that the embodiments reside primarily in combinations of apparatus components and processing steps related to actively monitoring and managing power loading at an individual service point (e.g., on an individual subscriber basis) and throughout a utility's service area, as well as determining available or dispatchable operating reserve power derived from projected power savings resulting from monitoring and management of power loading. Accordingly, the apparatus and method components have been represented where appropriate by conventional symbols in the drawings, showing only those specific details that are pertinent to understanding the embodiments of the present invention so as not to obscure the disclosure with details that will be readily apparent to those of ordinary skill in the art having the benefit of the description herein.
-
In this document, relational terms, such as “first” and “second,” “top” and “bottom,” and the like, may be used solely to distinguish one entity or element from another entity or element without necessarily requiring or implying any physical or logical relationship or order between such entities or elements. The terms “comprises,” “comprising,” and any other variation thereof are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements, but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. The term “plurality of” as used in connection with any object or action means two or more of such object or action. A claim element proceeded by the article “a” or “an” does not, without more constraints, preclude the existence of additional identical elements in the process, method, article, or apparatus that includes the element.
-
Additionally, the term “ZigBee” refers to any wireless communication protocol adopted by the Institute of Electronics & Electrical Engineers (IEEE) according to standard 802.15.4 or any successor standard(s), the term “Wi-Fi” refers to any communication protocol adopted by the IEEE under standard 802.11 or any successor standard(s), the term “WiMax” refers to any communication protocol adopted by the IEEE under standard 802.16 or any successor standard(s), and the term “Bluetooth” refers to any short-range communication protocol implementing IEEE standard 802.15.1 or any successor standard(s). Additionally or alternatively to WiMax, other communications protocols may be used, including but not limited to a “1 G” wireless protocol such as analog wireless transmission, first generation standards based (IEEE, ITU or other recognized world communications standard), a “2-G” standards based protocol such as “EDGE or CDMA 2000 also known as 1×RTT”, a 3G based standard such as “High Speed Packet Access (HSPA) or Evolution for Data Only (EVDO), any accepted 4G standard such as “IEEE, ITU standards that include WiMax, Long Term Evolution “LTE” and its derivative standards, any Ethernet solution wireless or wired, or any proprietary wireless or power line carrier standards that communicate to a client device or any controllable device that sends and receives an IP based message.
-
The term “High Speed Packet Data Access (HSPA)” refers to any communication protocol adopted by the International Telecommunication Union (ITU) or another mobile telecommunications standards body referring to the evolution of the Global System for Mobile Communications (GSM) standard beyond its third generation Universal Mobile Telecommunications System (UMTS) protocols. The term “Long Term Evolution (LTE)” refers to any communication protocol adopted by the ITU or another mobile telecommunications standards body referring to the evolution of GSM-based networks to voice, video and data standards anticipated to be replacement protocols for HSPA. The term “Code Division Multiple Access (CDMA) Evolution Date-Optimized (EVDO) Revision A (CDMA EVDO Rev. A)” refers to the communication protocol adopted by the ITU under standard number TIA-856 Rev. A.
-
The terms “utility,” “electric utility,” “power utility,” and “electric power utility” refer to any entity or system that generates, distributes, and/or resells electrical power, including any market participant associated with an electric power grid, microgrid, etc., that purchases power from a power-generating entity and distributes the purchased power to end user customers, or that supplies electricity created either actually or virtually by alternative energy sources, such as solar power, wind power, load control, or otherwise, to power generation or distribution entities through the FERC electrical grid or otherwise, or that schedules the supply of energy or ancillary services, such as operating reserves. Therefore, as used herein and in the appended claims, an “electric utility” may be a power-generating entity, a power-distributing entity, a retail electric provider (REP), an independent system operator (ISO), an electrical grid operator, or any other market participant, such as any entity that performs the function of a load serving entity (LSE), a qualified scheduling entity (QSE), a resource entity (RE), or a transmission/distribution service provider (TDSP), as such entities and participants are understood by those of ordinary skill in the art in the electricity industry.
-
The terms “energy” and “power” are used interchangeably herein. The terms “operating reserve,” “spinning reserve,” “regulating reserve,” “non-spinning reserve,” “supplemental reserve,” and “contingency reserve” are conventional in the art and their uses and inter-relations are described in hereinabove. The term “environment” refers to general conditions, such as air temperature, humidity, barometric pressure, wind speed, rainfall quantity, water temperature, etc., at or proximate a service point or associated with a device (e.g., water temperature of water in a hot water heater or a swimming pool).
-
The term “device,” as used herein, means a power-consuming device, and there may generally be two different types of devices within a service point, namely, an environmentally-dependent device and an environmentally-independent device. An environmentally-dependent device is any power consuming device that turns on or off, or modifies its behavior, based on one or more sensors that detect characteristics, such as temperature, humidity, pressure, or various other characteristics, of an environment. An environmentally-dependent device may directly affect and/or be affected by the environment in which it operates. An environmentally-independent device is any power-consuming device that turns on or off, or modifies its behavior, without reliance upon inputs from any environmental sensors. Generally speaking, an environmentally-independent device does not directly affect, and is not typically affected by, the environment in which it operates, although, as one skilled in the art will readily recognize and appreciate, operation of an environmentally-independent device can indirectly affect, or occasionally be affected by, the environment. For example, as those skilled in the art readily understand, a refrigerator or other appliance generates heat during operation, thereby causing some heating of the ambient air proximate the device.
-
It will be appreciated that embodiments or components of the systems described herein may be comprised of one or more conventional processors and unique stored program instructions that control the one or more processors to implement, in conjunction with certain non-processor circuits, some, most, or all of the functions for determining an electric utility's available or dispatchable operating (e.g., regulating and spinning) reserve that is derived from projected power savings resulting from monitoring and management of loads in one or more active load management systems as described herein. The non-processor circuits may include, but are not limited to, radio receivers, radio transmitters, antennas, modems, signal drivers, clock circuits, power source circuits, relays, meters, memory, smart breakers, current sensors, and user input devices. As such, these functions may be interpreted as steps of a method to store and distribute information and control signals between devices in a power load management system. Alternatively, some or all functions could be implemented by a state machine that has no stored program instructions, or in one or more application specific integrated circuits (ASICs), in which each function or some combinations of functions are implemented as custom logic. Of course, a combination of the foregoing approaches could be used. Thus, methods and means for these functions have been described herein. Further, it is expected that one of ordinary skill in the art, notwithstanding possibly significant effort and many design choices motivated by, for example, available time, current technology, and economic considerations, when guided by the concepts and principles disclosed herein, will be readily capable of generating such software instructions, programs and integrated circuits (ICs), and appropriately arranging and functionally integrating such non-processor circuits, without undue experimentation.
-
Generally, the present invention encompasses a system and method for generating operating reserve (e.g., spinning and/or regulating reserve) for a utility servicing one or more service points. In one embodiment, the utility or any market participant associated with the electric power grid, employs an active load management system (ALMS) to remotely determine, during at least one period of time, power consumed by at least one device located at the one or more service points and receiving power from the utility to produce power consumption data. The power consumption data is regularly stored and updated in a repository. The ALMS or a control component thereof, such as an active load director (ALD), determines an expected, future time period for a control event during which power is to be interrupted or reduced to one or more devices. Prior to commencement of the control event, the ALMS or its control component: (i) generates power consumption behavior expected of the device(s) during the time period of the control event based at least on the stored power consumption data, (ii) determines projected energy savings resulting from the control event based at least on the power consumption behavior of device(s), and determines operating (e.g., regulating and/or spinning) reserve based on the projected energy savings. The determined operating reserve may be made available to the current power utility or to the power market through the existing (e.g., Federal Energy Regulatory Commission) power grid. In one embodiment, the ALD populates an internal repository (e.g., database, matrix, or other storage medium) with measurement data indicating how individual devices within individual service points consume power or otherwise behave under normal operation and during control events. The power consumption data is updated through regular (e.g., periodic or otherwise) sampling of device operating conditions (e.g., current draw, duty cycle, operating voltage, etc.). When an ALD is first installed in an ALMS for an electric utility power grid, there is little data with which to create regulating and spinning reserve forecasts. However, over time, more and more data samples are used to improve the quality of the data in the repository. This repository is used to project both energy usage and energy savings. These projections can be aggregated for an entire service point, a group of service points, or the entire utility.
-
Furthermore, based upon the reduction in consumed power, the systems and methods of the present invention provide for generating at the control center a power supply value (PSV) corresponding to the reduction in consumed power by the power consuming device(s). Importantly, the PSV is an actual value that includes measurement and verification of the reduction in consumed power; such measurement and verification methods may be determined by the appropriate governing body or authority for the electric power grid(s). Power Supply Value (PSV) is calculated at the meter or submeter or at building control system or at any device or controller that measures power within the standard as supplied by the regulatory body(ies) that govern the regulation of the grid. PSV variations may depend on operating tolerances, operating standard for accuracy of the measurement. The PSV enables transformation of curtailment or reduction in power at the device level by any system that sends or receives an IP message or power control-related message to be related to or equated to supply as presented to the governing entity that accepts these values and award supply equivalence, for example of a power generating entity or an entity allowed to control power consuming devices as permitted by the governing body of the electric power grid, e.g., FERC, NERC, etc.
-
PSV may be provided in units of electrical power flow, monetary equivalent, and combinations thereof. Also, PSV relates to the ability to reduce power by curtailment or by putting power back onto the grid, and the quality and value associated therewith. Thus, the PSV provides an actual value that is confirmed by measurement and/or verification, thereby providing for a curtailment value as a requirement for providing supply to the power grid, wherein the supply to the power electric power grid is provided for grid stability, voltage stability, reliability, and combinations thereof, and is further provided as responsive to an energy management system or equivalent for providing grid stability, reliability, frequency as determined by governing authority for the electric power grid and/or grid operator(s).
-
In an alternative embodiment, additional data may be used to help differentiate each data sample stored in the repository. The additional data is associated with variability factors, such as, for example, outside air temperature, day of the week, time of day, humidity, sunlight, wind speed, altitude, orientation of windows or doors, barometric pressure, energy efficiency rating of the service point, insulation used at the service point, and others. All of these variability factors can have an influence on the power consumption of a device. Some of the variability factor data may be obtained from public sources, such as local, state or national weather services, calendars, and published specifications. Other variability factor data may be obtained privately from user input and from sensors, such as humidity, altitude, temperature (e.g., a thermostat), and optical or light sensors, installed at or near a service point (e.g., within or at a residence or business).
- FIG. 2
is a block diagram illustrating how an ALMS operating in accordance with the present invention provides additional operating (e.g., regulating, spinning, and/or non-spinning) reserve to a power utility. Without use of an ALMS operating in accordance with the present invention, the utility has capacity equal to its base load plus its regulating reserve, spinning reserve, and non-spinning reserve as shown on the left side of the figure. However, with use of an ALMS operating in accordance with the present invention, the utility has additional operating reserve, which may be preferably used as regulating, spinning and/or non-spinning reserve (as illustrated in
FIG. 2), by drawing power selectively from service points through the interruption or reduction of power to devices, such as air conditioners, furnaces, hot water heaters, pool pumps, washers, dryers, boilers, and/or any other inductive or resistive loads, at the service points.
-
The present invention can be more readily understood with reference to
FIGS. 3-12, in which like reference numerals designate like items.
FIG. 3depicts an exemplary IP-based active load management system (ALMS) 10 that may be utilized by an electric utility, which may be a conventional power-generating utility or a virtual utility, in accordance with the present invention. The below description of the
ALMS10 is limited to specific disclosure relating to embodiments of the present invention. A more general and detailed description of the
ALMS10 is provided in commonly-owned, co-pending U.S. application Ser. No. 11/895,909, which was filed on Aug. 28, 2007, was published as U.S. Patent Application Publication No. US 2009/0062970 A1 on Mar. 5, 2009, and is incorporated herein by this reference as if fully set forth herein. U.S. Patent Application Publication No. US 2009/0062970 A1 provides details with respect to the exemplary operational implementation and execution of control events to interrupt or reduce power to devices located at service points, such as residences and businesses. The use of an
ALMS10 to implement a virtual utility is described in detail in commonly-owned and co-pending U.S. application Ser. No. 12/001,819, which was filed on Dec. 13, 2007, was published as U.S. Patent Application Publication No. US 2009/0063228 A1 on Mar. 5, 2009, and is incorporated herein by this reference as if fully set forth herein.
-
The
ALMS10 monitors and manages power distribution via an active load director (ALD) 100 connected between one or more utility control centers (UCCs) 200 (one shown) and one or more active load clients (ALCs) 300 (one shown) installed at one or more service points 20 (one exemplary residential service point shown). The
ALD100 may communicate with the
utility control center200 and each
active load client300 either directly or through a
network80 using the Internet Protocol (IP) or any other (IP or Ethernet) connection-based protocols. For example, the
ALD100 may communicate using RF systems operating via one or more base stations 90 (one shown) using one or more wireless communication protocols, such as GSM, ANSI C12.22, Enhanced Data GSM Environment (EDGE), HSPA, LTE, Time Division Multiple Access (TDMA), or CDMA data standards, including CDMA 2000, CDMA Revision A, CDMA Revision B, and CDMA EVDO Rev. A. Alternatively, or additionally, the
ALD100 may communicate via a digital subscriber line (DSL) capable connection, cable television based IP capable connection, or any combination thereof. In the exemplary embodiment shown in
FIG. 3, the
ALD100 communicates with one or more
active load clients300 using a combination of traditional IP-based communication (e.g., over a trunked line) to a
base station90 and a wireless channel implementing the HSPA or EVDO protocol from the
base station90 to the
active load client300. The distance between the
base station90 and the
service point20 or the
active load client300 is typically referred to as the “last mile” even though the distance may not actually be a mile. The
ALD100 may be implemented in various ways, including, but not limited to, as an individual server, as a blade within a server, in a distributed computing environment, or in other combinations of hardware and software. In the following disclosure, the
ALD100 will be described as embodied in an individual server to facilitate an understanding of the present invention. Thus, the server embodiment of the
ALD100 described below corresponds generally to the description of the
ALD100 in US patent application Publication Nos. US 2009/0062970 A1 and US 2009/0063228 A1.
-
Each
active load client300 is preferably accessible through a specified address (e.g., IP address) and controls and monitors the state of individual smart breaker modules or
intelligent appliances60 installed at the service point 20 (e.g., in the business or residence) to which the
active load client300 is associated (e.g., connected or supporting). Each
active load client300 is preferably associated with a single residential or commercial customer. In one embodiment, the
active load client300 communicates with a
residential load center400 that contains smart breaker modules, which are able to switch from an “ON” (active) state to an “OFF” (inactive) state, and vice versa, responsive to signaling from the
active load client300. Smart breaker modules may include, for example, smart breaker panels manufactured by Schneider Electric SA under the trademark “Square D” or Eaton Corporation under the trademark “Cutler-Hammer” for installation during new construction. For retro-fitting existing buildings, smart breakers having means for individual identification and control may be used. Typically, each smart breaker controls a single appliance (e.g., a washer/
dryer30, a
hot water heater40, an
HVAC unit50, or a pool pump 70). In an alternative embodiment, IP addressable relays or device controllers that operate in a manner similar to a “smart breaker” may be used in place of smart breakers, but would be installed coincident with the load under control and would measure the startup power, steady state power, power quality, duty cycle and energy load profile of the
individual appliance60,
HVAC unit40,
pool pump70,
hot water heater40, or any other controllable load as determined by the utility or end customer.
-
Additionally, the
active load client300 may control individual smart appliances directly (e.g., without communicating with the residential load center 400) via one or more of a variety of known communication protocols (e.g., IP, Broadband over PowerLine (BPL) in its various forms, including through specifications promulgated or being developed by the HOMEPLUG Powerline Alliance and the Institute of Electrical and Electronic Engineers (IEEE), Ethernet, Bluetooth, ZigBee, Wi-Fi (IEEE 802.11 protocols), HSPA, EVDO, etc.). Typically, a
smart appliance60 includes a power control module (not shown) having communication abilities. The power control module is installed in-line with the power supply to the appliance, between the actual appliance and the power source (e.g., the power control module is plugged into a power outlet at the home or business and the power cord for the appliance is plugged into the power control module). Thus, when the power control module receives a command to turn off the
appliance60, it disconnects the actual power supplying the
appliance60. Alternatively, the
smart appliance60 may include a power control module integrated directly into the appliance, which may receive commands and control the operation of the appliance directly (e.g., a smart thermostat may perform such functions as raising or lowering the set temperature, switching an HVAC unit on or off, or switching a fan on or off).
-
The
active load client300 may further be coupled to one or more
variability factor sensors94.
Such sensors94 may be used to monitor a variety of variability factors affecting operation of the devices, such as inside and/or outside temperature, inside and/or outside humidity, time of day, pollen count, amount of rainfall, wind speed, and other factors or parameters.
-
Referring now to
FIG. 4, the
ALD100 may serve as the primary interface to customers, as well as to service personnel, and operates as the system controller sending control messages or power control messages to, and collecting data from, installed
active load clients300 as described in detail below and in U.S. Patent Application Publication No. US 2009/0062970 A1, which is incorporated herein by reference in its entirety. In the exemplary embodiment depicted in
FIG. 4, the
ALD100 is implemented as an individual server and includes a utility control center (UCC)
security interface102, a
UCC command processor104, a
master event manager106, an
ALC manager108, an
ALC security interface110, an
ALC interface112, a
web browser interface114, a customer sign-up
application116, customer
personal settings138, a customer reports
application118, a
power savings application120, an ALC
diagnostic manager122, an
ALD database124, a
service dispatch manager126, a
trouble ticket generator128, a
call center manager130, a
carbon savings application132, a utility power and carbon (P&C)
database134, a
read meter application136, a
security device manager140, a
device controller144, and one or more processors 160 (one shown). The operational details of several of the elements of the
ALD100 are described below with respect to their use in connection with the present invention. The operational details of the remaining elements of the
ALD100 may be found in U.S. patent application Publication Nos. US 2009/0062970 A1 and US 2009/0063228 A1, and US 2011/0172837, each of which are incorporated herein by reference in their entirety, including specification and figures or drawings, wherein the
ALD100 is also described in the context of an individual server embodiment.
-
In another embodiment, features, functions and/or components referred to in US Patent Application Publication No. 2010/0161148, Ser. No. 12/715,195 filed Mar. 1, 2010, by inventor Forbes, Jr., which is incorporated herein by reference in its entirety, are combined advantageously with the embodiments described herein.
-
In one embodiment according to the present invention, a sampling repository is used to facilitate the determination of dispatchable operating reserve power or energy (e.g., spinning and/or regulating reserve) for a utility. An
exemplary sampling repository500 is shown in block diagram form in
FIG. 5. As illustrated in
FIG. 5, the
sampling repository500 is a means for storing device monitoring data and other data that collectively details how devices (e.g., a
hot water heater40 as shown in
FIG. 5) have behaved under specific conditions. The
repository500 may be in various forms, including a matrix, a database, etc. In one embodiment, the
sampling repository500 is implemented in the
ALD database124 of the
ALD100. Alternatively, the
sampling repository500 may reside elsewhere within the
ALD100 or be external to the
ALD100. The
sampling repository500 contains all power consumption data for devices located at a device or
service point20 or within a utility and/or any market participant associated with the electric power grid. Power consumption data may include, but is not limited to: current reading, energy/power used or consumed, energy/power saved, drift or drift rate, power time, user settings for maximum environmental variances, time periods (e.g., hours of the day, days of the week, and calendar days). Taken collectively, this data is used to show how devices behaved during normal operation as well as during control events in which power is temporarily interrupted or reduced to one or more devices. The data may be obtained via passive sampling (e.g., regular monitoring of devices at a
particular service point20 by the
active load client300 associated with the service point 20) and/or active sampling (e.g., direct polling of the devices for the data by the
active load client300 or the ALD 100). As discussed below, the
sampling repository500 is used by the
ALD100 or other components of the
ALMS10 to generate or project power consumption behavior of the devices and to determine projected power/energy savings resulting from a control event. The projected power savings may be determined using the
power savings application120 based upon the power consumption data in the
repository500.
- FIG. 6
is an exemplary screen shot displayed to a user (e.g., customer) during execution of a customer
personal settings application138. The illustrated screen shot shows a screen being used to set the customer preferences for an environmentally-dependent device, such as an
HVAC unit50, a humidifier, or a pool heater. The illustrated screen shot may be provided to the customer in one embodiment via an Internet-accessible web portal 98 (referred to herein as the “customer dashboard”) when such portal is accessed by the customer via a computer, smart phone, or other comparable device. As shown in
FIG. 3, the
customer dashboard98 may be connected to the
ALD100 via an Internet service provider for the
service point20 or may be implemented as a
customer Internet application92 when Internet service is supplied through the
active load client300 as described in U.S. Patent Application Publication No. US 2009/0063228 A1. The
customer dashboard98 effectively provides the customer with access into the
ALD100. The ALD's
web browser interface114 accepts inputs from the
customer dashboard98 and outputs information to the
customer dashboard98 for display to the customer. The
customer dashboard98 may be accessed from the
service point20 or remotely from any Internet-accessible device, preferably through use of a user name and password. Thus, the
customer dashboard98 is preferably a secure, web-based interface used by customers to specify preferences associated with devices controlled by the
ALD100 and located at the customer's
service point20, as well as to provide information requested by the customer
personal settings application138 or the customer sign-up
application116 in connection with controlled devices and/or service point conditions or parameters. Customer preferences may include, for example, control event preferences (e.g., times, durations, etc.), bill management preferences (e.g., goal or target for maximum monthly billing cost), maximum and minimum boundary settings for environmental characteristics, and others.
- FIG. 7
is another exemplary screen shot displayed to a customer via the
customer dashboard98 during execution of a different portion of the customer
personal settings application138.
FIG. 7shows how customer preferences could be set for an environmentally-independent device, such as a
hot water heater40, a
pool pump70, or a sprinkler system water pump (which may also be an environmentally-dependent device if it includes, for example, a rainfall sensor). Using the
web browser interface114, customers interact with the
ALD100 and specify customer
personal settings138 that are recorded by the
ALD100 and stored in the
ALD database124 or
other repository500. The
personal settings138 may specify time periods during which load control events are permitted, time periods during which load control events are prohibited, maximum allowable variances for an operating environment at a particular service point 20 (e.g., maximum and minimum temperature and/or humidity), normal operating conditions of devices at different times of day, and other personal preferences related to operation of devices under the control of the
ALD100 through the
active load client300 at the
service point20.
-
As alluded to above, the present invention optionally tracks and takes into account the “drift” of an environmentally-dependent device. Drift occurs when the environmental characteristic(s) (e.g., temperature) monitored by an environmentally-dependent device begins to deviate (e.g., heat up or cool down) from a set point that is to be maintained by the environmentally-dependent device. Such deviation or drift may occur both normally and during control events. Thus, drift is the time it takes for the monitored environmental characteristic to move from a set point to an upper or lower comfort boundary when power, or at least substantial power, is not being consumed by the device. In other words, drift is a rate of change of the monitored environmental characteristic from a set point without use of significant power (e.g., without powering an HVAC unit compressor, but while continuing to power an associated digital thermostat and HVAC unit control system). One of ordinary skill in the art will readily appreciate that devices, such as
HVAC units50, which control one or more environmental characteristics at a
service point20, are also influenced or affected by the environment at the
service point20 because their activation or deactivation is based on one or more sensed environmental characteristics at the
service point20. For example, an
HVAC unit50 in cooling mode that attempts to maintain an inside temperature of 77.degree. F. activates when the inside temperature is some temperature greater than 77.degree. F. and, therefore, is influenced or affected by the environment in which the
HVAC unit50 operates.
-
The inverse of drift is “power time,” which is the time it takes for the sensed environmental characteristic to move from a comfort boundary to a set point when significant or substantial power is being supplied to the environmentally-dependent device. In other words, “power time” is a rate of change of the monitored environmental characteristic from a comfort boundary to a set point with significant use of power. Alternatively, “drift” may be considered the time required for the monitored environmental characteristic to move to an unacceptable level after power is generally turned off to an environmentally-dependent device. By contrast, “power time” is the time required for the monitored environmental characteristic to move from an unacceptable level to a target level after power has been generally supplied or re-supplied to the environmentally-dependent device.
-
The power consumption data for an environmentally-dependent device, which may be gathered actively or passively as described above, may be used to empirically determine the drift and power time (rate of change, temperature slope, or other dynamic equation (f{x})) that defines an environmental characteristic's variation at a
service point20, or at least within the operating area of the environmentally-dependent device, so as to permit the determination of a uniquely derived “fingerprint” or power usage/consumption pattern or behavior for the
service point20 or the environmentally-dependent device.
-
Customers define the upper and lower boundaries of comfort by inputting
customer preferences138 through the
web browser interface114, with the set point optionally being in the middle of those boundaries. During normal operation, an environmentally-dependent device will attempt to keep the applicable environmental characteristic or characteristics near the device's set point or set points. However, all devices, whether environmentally-dependent or environmentally-independent, have a duty cycle that specifies when the device is in operation because many devices are not continuously in operation. For an environmentally-dependent device, the duty cycle ends when the environmental characteristic(s) being controlled reaches the set point (or within a given tolerance or variance of the set point). After the set point has been reached, the environmentally-dependent device is generally turned off and the environmental characteristic is allowed to “drift” (e.g., upward or downward) toward a comfort boundary. Once the environmental characteristic (e.g., temperature) reaches the boundary, the environmentally-dependent device is generally activated or powered on again until the environmental characteristic reaches the set point, which ends the duty cycle and the power time.
-
Drift may also occur during a control event. A control event is an action that temporarily reduces, terminates, or otherwise interrupts the supply of power to a device. During a control event, the environmental characteristic (e.g., temperature) monitored and/or controlled by an environmentally-dependent device will drift toward a comfort boundary (e.g., upper or lower) until the environmental characteristic reaches that boundary. Once the environmental characteristic reaches the boundary, the
ALMS10 generally returns or increases power to the device to enable the environmental characteristic to reach the set point again.
-
For example, an
HVAC unit50 may have a set point of 72.degree. F. and minimum and maximum comfort boundary temperatures of 68.degree. F. and 76.degree. F., respectively. On a cold day, a control event may interrupt power to the
HVAC unit50 causing the monitored temperature within the
service point20 to move toward the minimum comfort boundary temperature. Once the monitored temperature inside the
service point20 reaches the minimum comfort boundary temperature, the control event would end, and power would be restored or increased to the
HVAC unit50, thus causing the monitored temperature to rise toward the set point. A similar, but opposite effect, may take place on a warm day. In this example, “drift” is the rate of change with respect to the time it takes the
HVAC unit50 to move from the set point to either the upper or lower comfort bounds. Analogously, “power time” is the rate of change with respect to the time required for the
HVAC unit50 to move the monitored temperature from the upper or lower comfort bounds to the set point. In one embodiment of the present invention, drift and power time are calculated and recorded for each environmentally-dependent or environmentally-independent device or for each
service point20.
-
In another embodiment, drift and other measurement data available from the
ALD database124 are used to create a power consumption behavior or pattern for each environmentally-dependent or environmentally-independent device or for each
service point20. The other measurement data may include vacancy times, sleep times, times in which control events are permitted, and/or other variability factors.
-
The environment within an energy-efficient structure will have a tendency to exhibit a lower rate of drift. Therefore, environmentally-dependent devices operating within such structures may be subject to control events for longer periods of time because the amount of time taken for the monitored environmental characteristic to reach a comfort boundary due to drift after being set to a set point is longer than for less efficient structures.
-
In another embodiment, the
ALD100 may identify
service points20 that have an optimum drift for power savings. The
power savings application120 calculates drift for each
service point20 and/or for each environmentally-dependent device at the
service point20, and saves the drift information in the
ALD database124 as part of power consumption data for the device and/or the
service point20. Thus, power saved as a result of drift during a control event increases overall power saved by the environmentally-dependent device at the
service point20.
- FIG. 8
illustrates an exemplary operational flow diagram 800 providing steps executed by the
ALD100 to empirically analyze power usage of devices and populate a
repository500 with data samples resulting from such power usage analysis, in accordance with one embodiment of the present invention. The steps in
FIG. 8may be considered to implement a passive sampling algorithm. The steps of
FIG. 8are preferably implemented as a set of computer instructions (software) stored in memory (not shown) of the
ALD100 and executed by one or
more processors160 of the
ALD100.
-
According to the logic flow, the
active load client300 polls devices within the
service point20, such as a washer/
dryer30,
hot water heater40,
HVAC unit50,
smart appliance60,
pool pump70, or other devices within the
service point20, and obtains current readings. Upon receiving the current reading data from the
active load client300, the
ALC interface112 sends the data to the
ALC manager108. The
ALC manager108 stores the data to the
sampling repository500, which may be implemented in the
ALD database124 using the operational flow illustrated in
FIG. 8.
-
The following information may be provided as parameters to the operational flow of
FIG. 8: an identification (ID) of the device, temperature mode (either “heating” or “cooling”), duty cycle, current temperature read by the device, and previous temperature read by the device. Each temperature reading includes a device ID, a set point (which is only useful for environmentally-dependent devices), and variability factor measurement data (as described previously).
-
Initially, the
ALD100 determines (802) whether the device used any, or at least any appreciable amount of, energy. If not, then the logic flow ends. Otherwise, the
ALD100 determines (804) the time duration of the data sample, the time duration when the device was on, and the time duration when the device was off based on the data sample. Next, the
ALD100 determines (806) whether the received data comes from an environmentally-dependent device or an environmentally-independent (e.g., binary state) device. If the received data comes from an environmentally-dependent device, then the
ALD100 determines (808) the energy used per minute for the device, and determines (810) whether the device is drifting or powering. The
ALD100 determines that the device is drifting if the environmental characteristic monitored by the device is changing in a manner opposite the mode of the device (e.g., the room temperature is rising when the device is set in cooling mode or the room temperature is decreasing when the device is set in heating mode). Otherwise, the device is not drifting.
-
If the device is drifting, then the
ALD100 determines (814) the drift rate (e.g., degrees per minute). On the other hand, if the device is not drifting, then the
ALD100 determines (812) the power time rate. Once either the drift rate or the power time rate has been calculated, the
ALD100 determines (880) whether there is already a record in the
sampling repository500 for the device being measured under the present operating conditions of the device (e.g., set point and other variability factors (e.g., outside temperature)). If there is no existing record, then the
ALD100 creates (882) a new record using, for example, the device's ID, time of record, current set point, current outside temperature, energy used per minute, power time rate, and drift rate (assuming that either a power time rate or a drift rate has been determined). However, if there is an existing record, then the
ALD100 updates (884) the existing record by averaging the new data (including energy usage, drift rate, and power time rate) with the existing data and storing the result in the
repository500.
-
If the
ALD100 determines (806) that the received data comes from an environmentally-independent device, then the
ALD100 determines (842) the energy used per minute for the device and further determines (844) the energy saved per minute for the device. The
ALD100 then searches the repository 500 (e.g., ALD database (124)) to determine (890) whether there is already a record for the device for the applicable time period. If there is no existing record, then the
ALD100 creates (892) a new record using the device's ID, time of record, current time block, energy used per minute, and energy saved per minute. However, if there is an existing record, then the
ALD100 updates (894) the existing record by averaging the new data (including energy usage and energy savings) for the time block with the existing data for the time block and stores the result in the
repository500. For environmentally-independent devices, energy usage and energy savings are saved with respect to a block or period of time.
- FIG. 9
illustrates an exemplary operational flow diagram 900 providing steps executed by the
ALD100 to project or generate the energy usage expected of a device during a future time period in a given environment setting, in accordance with one embodiment of the present invention. The steps of
FIG. 9are preferably implemented as a set of computer instructions (software) stored in memory (not shown) of the
ALD100 and executed by one or
more processors160 of the
ALD100. In accordance with one embodiment, the operational flow of
FIG. 9may be executed by the
power savings application120 of the
ALD100 when a utility operator, or other operator of the
ALD100, wants to project the energy usage for a device over a specified time period in the future, such as during a period of time in which a control event is to occur.
-
The following information may be provided as parameters to the operational flow of
FIG. 9: the device ID, the start time of the future time period, the end time of the future time period, the manage mode of the device, and, for an environmentally-independent device, a binary control factor. The manage mode is either “control” or “normal” to indicate whether the device is being measured during a control event or during normal operation, respectively. The binary control factor is preferably utilized for environmentally-independent devices and represents the duty cycle of the device. For example, if a
water heater40 runs at 20% duty cycle, the binary control factor is 0.2.
-
Initially, the ALD 100 (e.g., power savings application 120) determines (902) a future time period based on the start and stop times. The future time period may be set by the utility implementing the load control procedure of the present invention or a second utility that has requested delivery of operating reserve power from the utility implementing the load control procedure of the present invention. After the time period at issue is known, the
power savings application120 begins the procedure for projecting or generating the amount of power that can be saved as the result of execution of a control event during the future time period. Accordingly, the
power savings application120 analyzes the devices to be controlled during the control event. Thus, the
power savings application120 determines (904) whether the devices include both environmentally-dependent and environmentally-independent (e.g., binary state) devices. For each environmentally-dependent device, the
power savings application120 determines (920) whether the device is in environment controlling (e.g., heating or cooling) mode. Next, the
power savings application120 retrieves (922) the anticipated set points for the device during the future time period of the control event and obtains (924) information regarding the outside environmental characteristic(s) (e.g., the outside temperatures) expected during the control event time period. The
power savings application120 then makes projections (926) about the device's expected power consumption behavior during the future time period. In one embodiment, the projection determination of
block926 is implemented using a best match algorithm, as described in detail below with respect to
FIG. 10, to find stored repository records that best match the behavior of the device for each combination of set points, outside environmental characteristics (e.g., temperatures), and time periods, as measured and stored using the logic flow of
FIG. 8. The power consumption behavior of the device is used to determine the amount of energy that would be expected to be used by the device if the control event did not occur and, thus, the amount of energy generated or expected to be saved per unit time during the control event. The
power savings application120 multiplies (928) the saved power per unit time by the time duration of the future control event to determine the total amount of energy projected to be used by the device in the absence of the control event. The power savings application returns (980) the total projected amount of energy used by the device in the absence of the proposed control event.
-
However, if the
power savings application120 determines (904) that the proposed control event is to affect an environmentally-independent device, then the
power savings application120 determines (960) whether the device is currently scheduled to be on or off during the proposed time period of the control event. Next, the
power savings application120 creates, obtains, or otherwise determines (962) a list of time blocks for the specified control event time period. The
power savings application120 then makes projections (964) about the device's power consumption behavior during the future, control event time period. In one embodiment, the projection determination of
block964 is implemented using a best match algorithm, as described in detail below with respect to
FIG. 10, to find stored repository records that best match the behavior of the device for each combination of set points, outside environmental characteristics (e.g., temperatures), and time periods, as measured and stored using the logic flow of
FIG. 8. The power consumption behavior of the device is used to determine the amount of energy that would be expected to be used by the device if the control event did not occur and, thus, the amount of energy expected to be saved per unit time during the control event. Next, the
power savings application120 multiplies (968) the saved power per unit time by the time duration of the future control event to determine the total amount of energy projected to be used in the absence of the control event. If the projected energy savings is based on power consumption during a previous control event (970), then the
power savings application120 multiplies (972) the total amount of energy times the binary control factor to determine the amount of energy projected to be used by the device in the absence of the control event. The power savings application returns (980) the total projected amount of energy used by the device in the absence of the proposed control event.
-
One or ordinary skill in the art will readily recognize and appreciate that the operational flow of
FIG. 9may be used for each controlled device at a service point, for the controlled devices at multiple service points, or for all the controlled devices at all the service points supplied or supported by a utility. The total projected energy usage by the devices may be aggregated across a single service point, for all service points within a group, and/or for all groups served by the utility.
- FIG. 10
illustrates an exemplary operational flow diagram 1000 providing steps executed by the
ALD100 for generating power consumption behavior of a device in accordance with an exemplary embodiment of the present invention. The algorithm or operational flow illustrated in
FIG. 10provides one embodiment for implementing
steps926 and 964 of
FIG. 9. The operational flow of
FIG. 10determines which record or records in the
sampling repository500 provides the closest match to a given environment or operational setting for use in projecting device energy usage/savings during a time period of a future control event, in accordance with one embodiment of the present invention. The steps of
FIG. 10are preferably implemented as a set of computer instructions (software) stored in memory (not shown) of the
ALD100 and executed by one or
more processors160 of the
ALD100. The operational flow of
FIG. 10may be initiated by the
ALD100 when trying to identify or determine the sampling repository record or records that best match the power consumption behavior of a device in a specific setting.
-
In one embodiment, the operational flow of
FIG. 10is called during execution of the operational flow of
FIG. 9as noted above. When so called, the operational flow of
FIG. 9provides the operational flow of
FIG. 10with parameters that indicate the type of records to be searched. These parameters include, but are not limited to: a device ID, a duty mode (either on or off), a time period (e.g., corresponding to the time period of the proposed future control event), a set point delta, a delta or variance related to one or more environmental characteristics (e.g., outside temperature), and a time block delta. Duty mode signifies the duty cycle of the device. If the duty mode is TRUE or ON, significant power is being consumed. If the duty mode is FALSE or OFF, significant power is not being consumed (i.e., power is being saved). Duty cycle exists for switch-controlled, binary state, or environmentally-independent devices which go ON and OFF irrespective of the influence or affect of environment. For
HVAC devices50, duty mode is always ON. Set point delta is the amount a set point may be varied during a search in order to find a matching repository record. Outside temperature/environmental characteristic delta is the number of temperature degrees or other change in environmental characteristics over which data relating to the outside temperature or other environmental characteristics may be varied during a search in order to find a matching repository record. Time block delta is the amount of time a time block may be varied during a search in order to find a matching repository record.
-
Initially, the
ALD100 determines (1002) whether the requested repository search relates to an environmentally-dependent device or an environmentally-independent device. If the search relates to an environmentally-dependent device, then the
ALD100 attempts to find (1004) power consumption records in the
sampling repository500 that match the device ID, duty mode, environmental characteristic (e.g., temperature) set point, and associated outside environmental characteristic data. Power consumption records include power consumption data, such as power consumed, current drawn, duty cycle, operating voltage, operating impedance, time period of use, set points, ambient and outside temperatures during use (as applicable), and/or various other energy use data. If a record exists that matches all the power consumption search criteria, such record would be considered the record that most closely matches the given environment setting. If no exact match is found (1010), then the
ALD100 begins looking for records that slightly differ from the given environment setting. In one embodiment, the
ALD100 incrementally increases or decreases (1012) the environment-related search criteria (e.g., temperature set point and/or outside/ambient temperature) using the set point delta and the outside temperature/environmental characteristic delta as a guide to look for relevant records. Such incremental/iterative modification of the search criteria continues until either relevant records are found or some applicable limit (e.g., as indicated by the set point delta and/or other parameter deltas) is reached.
-
If the
ALD100 determines (1002) that the search relates to an environmentally-independent device, then the
ALD100 attempts to find (1040) power consumption records in the
sampling repository500 that match the device ID, duty mode, and time of operation (corresponding to the expected, future time of the control event). If a record is not found that matches all the search criteria (1070), then the
ALD100 modifies its search to look for records that slightly differ from the given environment setting. In one embodiment, the
ALD100 modifies its search by incrementally increasing or decreasing (1072) the time of operation for a given duty mode. The iterative searching continues until either relevant records are found or some applicable limit (e.g., as indicated by the time block delta or other parameter deltas) is reached. Any records that were found as a result of the search are provided (1060) to the requesting program (e.g., the operational flow of
FIG. 9). The result of the operational flow of
FIG. 10is a set of one or more power consumption records from the
sampling repository500 that are the closest match to the given environment or proposed control event setting.
- FIG. 11
illustrates an exemplary operational flow diagram 1100 providing steps executed by the
ALD100 to project energy savings through power interruption or reduction to a device during a control event, in accordance with one embodiment of the present invention. The steps of
FIG. 11are preferably implemented as a set of computer instructions (software) stored in memory (not shown) of the
ALD100 and executed by one or
more processors160 of the
ALD100. As with the operational flow of
FIG. 9, the operational flow of
FIG. 11may be executed by the
power savings application120 when an operator of the utility or of the
ALD100 wants to project the energy savings for a device over a specified time period during operation of a control event.
-
The following information may be provided as parameters to the operational flow of
FIG. 11: a device ID, a start time of the control event, an end time of the control event, and a binary control factor, as described above in connection with
FIG. 9. Initially, the ALD 100 (e.g., power savings application 120) projects (1102) the energy usage/power consumption for the device during normal operation within the expected time period of the control event using, for example, the operational flow of
FIG. 9. Next, the
power savings application120 projects (1104) the power consumption for the device during the control event using, for example, the operational flow of
FIG. 9. For example, depending on the duty cycle, set points, drift or drift rate, power time, and other parameters for the device, the device may be projected to be on and consuming power for some amount of time during the time period of the control event. Thus, both the expected amount of power consumed during normal operation (i.e., in the absence of any control event) and the expected amount of power consumed during the control event are determined to accurately assess any possible power savings as a result of the control event. After the two projected power consumption values have been determined, the
power savings application120 calculates (1106) the difference between the two values, which is the projected power consumption for the device during the control event time period. Because the projected power consumption will not be realized during the control event, such power consumption corresponds directly to an amount of energy saved during the control event. The
power savings application120 returns (1108) the projected energy savings value. One of ordinary skill in the art will readily recognize and appreciate that the
power savings application120 may aggregate the projected power savings for all controlled devices at a
service point20, for all controlled devices at service points within a group, or for controlled devices within all service point groups served by the utility to obtain an aggregate amount of power savings as a result of a control event.
-
Another context in which the
ALMS10 may be utilized is in conjunction with other renewable energy sources. A number of renewable energy sources, such as wind power and solar power, are variable in nature. That is, such energy sources do not generate power at a constant rate. For example, wind increases or decreases from moment to moment. Wind turbines can generate a large amount of power due to large winds or can stop generating completely due to lack of any wind. Solar panels may be able to generate a great deal of power on very sunny days, a little power on cloudy days, and virtually no power at night.
-
As a result, power utilities that make use of renewable energy must compensate for the under-generation or over-generation of power from those sources. When renewable energy sources are under-generating, the
ALMS10 may utilize the processes disclosed above to provide additional operating reserve to compensate for the lack of power generation by the renewable energy source and for the effects resulting therefrom, including output frequency instability. For example, a utility utilizing wind or solar energy sources may further incorporate the
ALMS10 into the utility distribution system to provide regulating reserve during time periods of under-generation.
- FIG. 12
is a graph that depicts the “load profile” of a utility over a predetermined time period, showing actual energy usage as well as projected energy usage determined with and without a control event in accordance with an exemplary embodiment of the present invention. The load profile graph depicts the following:
-
- a. Baseline power consumption 1202. This is the total possible load of, or power consumed by, all controlled devices over a specified period of time.
- b. Projected interruptible load usage 1204 (i.e., projected load or energy usage with a control event) for all controlled devices at all service points (or at selected service points) served by the utility in the absence of a control event. The projected interruptible load usage may be determined in one embodiment through execution of the operational flow of FIG. 9 . The projected interruptible load available 1204 indicates the load for all controlled devices if they are controlled 100% of the time using customer preferences.
- c. Projected interruptible load available 1206 (i.e., projected energy used when no control events are used) for all controlled devices at all service points (or at selected service points) served by the utility during a control event. The projected interruptible load usage may be determined in one embodiment through execution of the operational flow of FIG. 11 .
- d. Actual interruptible load usage 1208 for all controlled devices at all service points (or at selected service points) served by the utility. The actual interruptible load usage 1208 is the power that is currently being used by all controlled devices. This type of load profile graph may be generated for all controlled devices at a service point 20, for controlled devices at all service points within a group, or for controlled devices at all groups served by the utility.
-
In the load profile graph of
FIG. 12, the capacity under contract is shown as a straight double line at the top of the graph and indicates the
baseline power consumption1202. The
baseline power consumption1202 represents the total amount of power that the utility is obligated to provide. The actual
interruptible load usage1208 is the actual energy usage of all devices controlled by the utility. The projected
interruptible load usage1204 at the bottom of the load profile graph is the projected energy used when control events are used, and the projected interruptible load available 1206 is the projected energy usage when control events are not used. The difference between the projected
interruptible load usage1204 and the projected interruptible load available 1206 is the capacity that may be used for operating reserve, including regulating reserve, spinning reserve, and non-spinning reserve.
-
Normally, when a utility observes energy demand that is near its peak capacity, it will attempt to initiate control events for customers who voluntarily participate in power saving programs (i.e., flexible load-shape programs, as described earlier). Typically, these control events will provide sufficient capacity to prevent the utility from using non-spinning reserve. However, there are situations in which a sufficient number of customers may have manually decided to opt out of power saving programs and, as a result, the utility would be unable to recover enough energy to meet its spinning reserve needs from its remaining customers who voluntarily participate in the program. Such a situation could happen, for instance, on a very hot day when many people are home, such as on a holiday or a day over the weekend. In such a case, the utility would still be in danger of using non-spinning reserve or even running out of reserve capacity altogether. In such a situation, the utility would be in a “critical control” mode. In critical control mode, the utility may override all customer preferences, including both those who voluntarily participate in power saving programs and those who do not. During periods of critical control, the utility may utilize the
ALD100 to adjust settings of environmentally-dependent devices to settings outside of normal comfort preferences (but not life-threatening). Invoking critical control enables a utility to return power demand to acceptable levels.
-
Use of the
ALMS10 may help a utility mitigate the likelihood of critical control situations. For example, whenever a customer overrides or opts out of a control event, the
ALMS10, using the techniques disclosed herein, finds additional customers who may be the target of a voluntary control event. Analogously, when controlled devices that are participating in a control event are required to exit the control event due to customer preferences (e.g., the amount of time that the customer's devices may participate in a control event), the
ALD100 may release such devices from the control event and replace them with other voluntarily controlled devices. The replacement devices would then preferably supply, through deferment, at least the same amount of reserve power as was being sourced by the devices that were released from the control event. Thus, the
system10 of the present invention increases the likelihood that a utility will be able to spread control events to other customers before invoking critical control.
-
In a further embodiment, the
entire ALMS10 described in
FIG. 3may also be implemented in a proprietary network that is IP-based, real-time, temperature-derived, verifiable, interactive, two-way, and responsive to Automatic Generation Control (AGC) commands to produce operating reserve power through implementation of control events.
-
In an additional embodiment of the present invention, the sampling data stored in the
repository500 using the operational flow of
FIG. 5could also include other factors (called “variability factors”) related to power consumption, such as day of the week, humidity, amount of sunshine, or number of people in the household. This additional data would allow the projected energy usage and projected energy savings to be more accurate based on these additional factors. To make use of this data, the
ALD100 may obtain the additional data from sources within and/or external to the
ALMS10, such as weather databases, live weather feeds from sources such as National Weather Reporting stations,
outdoor sensors94, or any weather related input device commercially available on a real time or predictive basis, calendars, and voluntary customer feedback. Some of the variability factor measurements are available from public sources, while others are available via private sources.
-
In another alternative embodiment of the present invention, transmission line loss may be included in the projected energy savings determination of
FIG. 11. As those of ordinary skill in the art will recognize and appreciate, the amount of power supplied by a utility to source a device remote from the utility equals the amount of power required by the device plus the amount of power lost in the transmission lines between the utility's power generation plant and the location of the device. Thus, the projected energy savings resulting from a control event may be determined by determining an amount of power expected to be consumed by the controlled device or devices at a service point, at multiple service points or throughout the entire service area of the utility during the time period of the control event absent occurrence of the control event to produce first energy savings, determining an amount of power that is not expected to be dissipated in transmission lines as a result of not delivering power to the controlled device or devices during the control event to produce second energy savings, and summing the first energy savings and the second energy savings.
-
In a further embodiment of the present invention, the operating reserve (e.g., spinning reserve or regulating reserve) determined by a utility using the techniques disclosed above can be sold to a requesting
utility1306, as illustrated in
FIG. 13, which is essentially a replication of FIG. 9 of U.S. Patent Application Publication No. US 2009/0063228 A1, which is incorporated herein by reference in its entirety. As explained in U.S. Patent Application Publication No. US 2009/0063228 A1, the saved power may then be distributed to the requesting
utility1306 after commencement of the control event (e.g., during and/or after completion of the control event) conducted by the selling utility. The selling utility may be a
virtual utility1302 or a serving
utility1304 as illustrated in
FIG. 13and described in detail in U.S. Patent Application Publication No. US 2009/0063228 A1, which is incorporated herein by reference in its entirety. Alternatively, a third party may serve as a managing entity to manage operation of the
ALMS10 and the resultant distribution of operating reserve to a requesting
utility1306 subsequent to commencement of a control event.
-
In yet another embodiment, the
ALD100 for a utility may determine projected energy savings for each
service point20 served by the utility in accordance with the operational flow of
FIG. 11and aggregate the projected energy savings across all service points served by the utility to obtain the total projected energy savings from which operating reserve may be determined as described above.
-
In a further embodiment, instead of or in addition to using the operational flow of
FIG. 10in an attempt to find a best match data point in the
repository500 for use in generating power consumption behavior of a device when the time period of the control event does not correspond to a time period in the
repository500, the
ALD100 may determine whether the
repository500 includes power consumption data for the device during time periods before and after the expected time period of the control event and, if so, interpolate a value corresponding to an amount of power expected to be consumed by the device during the time period of the control event based on the power consumption data for the device during the time periods before and after the expected time period of the control event. However, more preferably, the power supply value (PSV) associated with each of the at least one power consuming device(s) is used to determine or generate the power consumption behavior and commercial value for the response to the control event associated with the power consuming device(s).
-
The present invention provides systems and methods that receive electric power from an electric power grid, the systems and methods including: at least one power consuming device that requires electric power to operate; at least one controllable device operably coupled to the at least one power consuming device, the at least one controllable device operable to control a flow of grid-supplied electric power to the at least one power consuming device responsive to power control instructions, wherein each of the at least one power consuming devices has a corresponding power supply value (PSV); a backup power subsystem operably coupled to the at least one power consuming device, the backup power subsystem operable to automatically supply electric power to the at least one power consuming device when a flow of grid-supplied electric power to the at least one power consuming device drops below a threshold; and a client device operable to receive power control messages from a remote system control component and provide power control instructions to the at least one controllable device responsive to the power control messages, wherein a first received power control message instructs the client device to disable a flow of grid-supplied electric power to the at least one power consuming device, and wherein a first power control instruction instructs the at least one controllable device to disable the flow of grid-supplied electric power to the at least one power consuming device and causing activation of the backup power subsystem.
-
Also, systems and methods for a client device at a base transceiver site to control a flow of electric power from an electric power grid to a collocated base transceiver system so as to provide operating reserve for to the electric power grid, the base transceiver system including at least one base transceiver unit operable to provide wireless communication capability, a controllable device operable to control a flow of grid-supplied electric power to the at least one base transceiver unit, and a backup power subsystem operable to supply electric power to the at least one base transceiver unit when a flow of grid-supplied electric power to the at least one base transceiver unit drops below a threshold, the method including the steps of: receiving power control messages from a remote system control component, at least a first received power control message instructing the client device to disable a flow of grid-supplied electric power to the at least one base transceiver unit; and providing a first power control instruction to the at least one controllable device responsive to the first received power control message, the first power control instruction instructing the at least one controllable device to disable a flow of grid-supplied electric power to the at least one base transceiver unit, thereby causing activation of the backup power subsystem, wherein an amount of grid-supplied electric power saved as a result of disabling a flow of grid-supplied electric power to the at least one base transceiver unit provides operating reserve for the electric power grid.
-
Also, in another embodiment, method for a client device located at an electrical service point to control a flow of electric power from an electric power grid to the service point so as to provide operating reserve to the electric power grid, the service point including at least one power consuming device operable to consume electric power, at least one controllable device operable to control a flow of grid-supplied electric power to the at least one power consuming device, and a backup power subsystem operable to supply electric power to the at least one power consuming device when a flow of grid-supplied electric power to the at least one power consuming device is reduced below a threshold, the method including the steps of: receiving power control messages from a remote system control component, at least a first power control message instructing the client device to disable a flow of grid-supplied electric power to the at least one power consuming device; and providing a first power control instruction to the at least one controllable device responsive to the first power control message, the first power control instruction instructing the at least one controllable device to disable a flow of grid-supplied electric power to the at least one power consuming device, thereby causing activation of the backup power subsystem, wherein an amount of grid-supplied electric power saved as a result of disabling a flow of grid-supplied electric power to the at least one power consuming device provides operating reserve for the electric power grid based upon a power supply value (PSV) associated with each of the at least one power consuming device(s).
-
In yet another embodiment, a requesting utility may utilize a method for acquiring operating reserve power from a sourcing utility. According to this embodiment, the requesting utility requests operating reserve power from the sourcing utility sufficiently in advance of a transfer time at which the operating reserve power will be needed so as to facilitate measurable and verifiable load-controlled generation of the operating reserve power. The load-controlled generation of the operating reserve power results from a determination of operating reserve as detailed above with respect to
FIGS. 7-12. The requesting utility receives an acknowledgment from the sourcing utility indicating that the sourcing utility will supply the operating reserve power at the transfer time. Then, at the transfer time and for a time period thereafter, the requesting utility receives at least some of the operating reserve power from the sourcing utility.
-
In a further embodiment, the operating reserve determination techniques may be utilized by a
virtual utility1302 as disclosed in U.S. Patent Application Publication No. US 2009/0063228 A1, which is incorporated herein by reference in its entirety. For example, the
virtual utility1302 may be operable to at least offer energy to one or more requesting
utilities1306 for use as operating reserve for the requesting
utilities1306. In such a case, the
virtual utility1302 may include, among other things, a
repository500 and a processor 160 (e.g., within an ALD 100). In this embodiment, the
processor160 is operable to remotely determine, during at least one period of time, power consumed by at least one device to produce power consumption data. The
processor160 is further operable to store the power consumption data in the
repository500 and, at the appropriate time, determine an expected, future time period for a control event during which power is to be reduced to the device or devices. The
processor160 is also operable to generate, prior to commencement of the control event, power consumption behavior expected of the device or devices during the time period of the control event based at least on the stored power consumption data. The
processor160 is further operable to determine, prior to commencement of the control event, projected energy savings resulting from the control event based at least on the power consumption behavior of the device or devices. Still further, the
processor160 is operable to determine, prior to commencement of the control event, operating reserve based on the projected energy savings. After determination of the operating reserve, the
processor160 is operable to communicate an offer to supply the operating reserve to a requesting
utility1306 or utilities.
-
As described above, the present invention encompasses a system and method for determining operating reserve capacity using an ALD or comparable device, software, or combination thereof so that the operating reserve capacity may be made available to the power utility that generated the operating reserve through load control or to the power market generally (e.g., via the FERC grid). When a utility requires power beyond its native load, the utility must make use of its operating reserve or acquire the additional power via the FERC grid from other utilities. As discussed above, one type of operating reserve is spinning reserve. Spinning reserve is additional generating capacity that is already connected to the power system and, thus, is almost immediately available. In accordance with one embodiment of the present invention, the ALD makes spinning reserve available to a utility. Thus, through use of the ALD, a utility (power generating utility or a virtual utility) can determine or project spinning reserve or other operating reserve that is available through interruptible power savings at service points. The spinning reserve is measurable and verifiable, and can be projected for a number of days in advance, and such projections can be sold to other utilities on the open market.
-
As disclosed above, the
ALD100 may be considered to implement a type of flexible load-shape program. However, in contrast to conventional load control programs, the load-shape program implemented by the
ALD100 projects an amount of operating reserve resulting from selective control of devices (loads) based on known, real-time customer preferences. In addition, due to its communication and control mechanisms, the
ALD100 can project power savings, as well as operating reserve (e.g., regulating, spinning and/or non-spinning reserve) that is active, real-time, verifiable, and measurable so as to comply with protocols and treaties established for the determination of carbon credits and offsets, as well as renewable energy credits. The information acquired by the
ALD100 is not simply samples of customer preferences and data, but actual power consumption information.
-
In the foregoing specification, the present invention has been described with reference to specific embodiments. However, one of ordinary skill in the art will appreciate that various modifications and changes may be made without departing from the spirit and scope of the present invention as set forth in the appended exemplary claims. For example, the passive sampling algorithm of
FIG. 8, the projected energy usage algorithm of
FIG. 9, the best sampling match algorithm of
FIG. 10, and the projected energy savings algorithm of
FIG. 11may be performed by one or more equivalent means. Accordingly, the specification and drawings are to be regarded in an illustrative rather than a restrictive sense, and all such modifications are intended to be included within the scope of the present invention.
-
Benefits, other advantages, and solutions to problems have been described above with regard to specific embodiments of the present invention. However, the benefits, advantages, solutions to problems, and any element(s) that may cause or result in such benefits, advantages, or solutions to become more pronounced are not to be construed as a critical, required, or essential feature or element of any or all the claims. The invention is defined solely by the appended claims including any amendments made during the pendency of this application and all equivalents of those claims as issued.
Claims (20)
1. A method for providing operating reserves for an electric power grid, comprising:
determining an amount of power consumed by at least one power consuming device during at least one period of time;
projecting energy savings from at least one power consuming device in the electric power grid based on an actual value corresponding to a reduction in consumed power by the at least one power consuming device, and wherein the actual value is a monetary supply equivalent value providing a curtailment value as a supply presented to and accepted by a governing entity for awarding the at least one power consuming device supply equivalence;
determining an amount of available operating reserve based on the reduction in consumed power and the projected energy savings;
creating and updating a sampling record for the at least one power consuming device, wherein the sampling record comprises a drift rate and at least one of a device ID, a time of record, a duty cycle, a current time block, a current set point, a current outside temperature, energy used per minute, and/or a power time rate;
wherein the sampling record is created both actively and passively;
receiving a request for an operating reserve from a utility and/or a market participant of the electric power grid;
wherein the actual value is capable of being accepted by the utility and/or the market participant of the electric power grid as supply equivalence; and
at least one smart breaker module managing a flow of electric power from the electric power grid to the at least one power consuming device to provide the operating reserve based on the amount of available operating reserve.
2. The method of
claim 1, further comprising providing an acknowledgement message following the receiving the request for the operating reserve.
3. The method of
claim 1, further comprising projecting energy usage for the at least one power consuming device during a normal operation, projecting energy usage for the at least one power consuming device during a control event, and calculating a difference of energy usage during the normal operation and the control event as the projected energy savings.
4. The method of
claim 1, further comprising power consumption data from the at least one power consuming device in a sampling repository.
5. The method of
claim 4, wherein the sampling repository is a matrix.
6. The method of
claim 1, further comprising determining a future time period for a control event based on start and stop times for projecting the energy savings.
7. The method of
claim 1, further comprising projecting a power consumption behavior for the at least one power consuming device based on a best match algorithm.
8. The method of
claim 1, wherein the at least one power consuming device comprises at least one environmentally-dependent power consuming device.
9. The method of
claim 1, wherein the at least one power consuming device comprises at least one environmentally-independent power consuming device.
10. The method of
claim 1, further comprising generating a supply equivalence value for each of the at least one power consuming device in units of electrical power flow, monetary equivalent, and combinations thereof.
11. The method of
claim 10, wherein the supply equivalence value for each of the at least one power consuming device has variations depending on operating tolerances and operating standards for measurement accuracy.
12. The method of
claim 1, wherein the actual value for the at least one power consuming device is aggregated for a multiplicity of power consuming devices to form an aggregate value for the multiplicity of power consuming devices.
13. A method for providing operating reserves for at least one grid operator of an electric power grid, comprising:
determining an amount of power consumed by at least one power consuming device during at least one period of time;
receiving a request for an operating reserve from the at least one grid operator of the electric power grid;
projecting energy savings from a multiplicity of power consuming devices based on an actual value corresponding to a reduction in consumed power by each of the at least one power consuming device, wherein the actual value is a monetary supply equivalent value providing a curtailment value as a supply presented to and accepted by a governing entity for awarding the at least one power consuming device supply equivalence;
creating and updating a sampling record for the at least one power consuming device, wherein the sampling record comprises a drift rate and at least one of a device ID, a time of record, a duty cycle, a current time block, a current set point, a current outside temperature, energy used per minute, and/or a power time rate;
wherein the sampling record is created both actively and passively;
wherein the actual value is capable of being accepted by the utility and/or the market participant of the electric power grid as supply equivalence; and
at least one smart breaker module managing a flow of electric power to the multiplicity of power consuming devices to provide the operating reserve based on power consumption data and the projected energy savings.
14. The method of
claim 13, further including generating a power supply value (PSV) based on curtailed power for each of the multiplicity of power consuming devices, wherein the PSV provides a monetary market value for equating as a corresponding power supply for an amount of electric power stored.
15. A system for providing operating reserves for an electric power grid, comprising:
a server processor in network communication with at least one power consuming device in the electric power grid;
wherein the server processor is operable to:
determine an amount of power consumed by at least one power consuming device during at least one period of time;
transmit messages to and receive messages from at least one smart breaker module;
create and update a sampling record for the at least one power consuming device, wherein the sampling record comprises a drift rate and at least one of a device ID, a time of record, a duty cycle, a current time block, a current set point, a current outside temperature, energy used per minute, and/or a power time rate
wherein the sampling record is created both actively and passively;
project energy savings from the at least one power consuming device based on an actual value corresponding to a reduction in consumed power by each of the at least one power consuming device, wherein the actual value is a monetary supply equivalent value providing a curtailment value accepted by a governing entity for awarding the at least one of the at least one power consuming device supply equivalence;
determine an amount of available operating reserve based on at least power consumption data and the projected energy savings;
receive a request for an operating reserve from a utility and/or a market participant of the electric power grid;
wherein the actual value is capable of being accepted by the utility and/or the market participant of the electric power grid as supply equivalence in real-time; and
wherein the at least one smart breaker module manages a flow of electric power to the at least one power consuming device to provide the operating reserve based on the amount of available operating reserve.
16. The system of
claim 15, wherein the server processor comprises a sampling repository operable for storing repository records of power consumption data of the at least one power consuming device.
17. The system of
claim 15, wherein the server processor is further operable to update the repository records stored in the sampling repository.
18. The system of
claim 15, wherein the server processor is further operable to project a power consumption behavior for the at least one power consuming device by identifying at least one repository record based on a best match algorithm.
19. The system of
claim 15, wherein an acknowledgement message is transmitted to the utility and/or the market participant after receiving the request for the operating reserve.
20. The system of
claim 15, wherein the at least one power consuming device comprises at least one environmentally-dependent power consuming device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US18/207,365 US20230316158A1 (en) | 2009-05-08 | 2023-06-08 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US21572509P | 2009-05-08 | 2009-05-08 | |
US12/775,979 US8396606B2 (en) | 2007-08-28 | 2010-05-07 | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US13/019,867 US8996183B2 (en) | 2007-08-28 | 2011-02-02 | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US13/471,589 US9130402B2 (en) | 2007-08-28 | 2012-05-15 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US14/844,871 US10295969B2 (en) | 2007-08-28 | 2015-09-03 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US16/415,322 US11676079B2 (en) | 2009-05-08 | 2019-05-17 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US18/207,365 US20230316158A1 (en) | 2009-05-08 | 2023-06-08 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/415,322 Continuation US11676079B2 (en) | 2009-05-08 | 2019-05-17 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
Publications (1)
Publication Number | Publication Date |
---|---|
US20230316158A1 true US20230316158A1 (en) | 2023-10-05 |
Family
ID=67768574
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/471,589 Expired - Fee Related US9130402B2 (en) | 2007-08-28 | 2012-05-15 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US16/415,322 Active 2031-01-28 US11676079B2 (en) | 2009-05-08 | 2019-05-17 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US18/207,365 Abandoned US20230316158A1 (en) | 2009-05-08 | 2023-06-08 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/471,589 Expired - Fee Related US9130402B2 (en) | 2007-08-28 | 2012-05-15 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US16/415,322 Active 2031-01-28 US11676079B2 (en) | 2009-05-08 | 2019-05-17 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
Country Status (1)
Country | Link |
---|---|
US (3) | US9130402B2 (en) |
Families Citing this family (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8805552B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | Method and apparatus for actively managing consumption of electric power over an electric power grid |
US8890505B2 (en) * | 2007-08-28 | 2014-11-18 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US9177323B2 (en) | 2007-08-28 | 2015-11-03 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US10295969B2 (en) | 2007-08-28 | 2019-05-21 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US8806239B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators |
US9130402B2 (en) * | 2007-08-28 | 2015-09-08 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
TR200805998A2 (en) | 2008-08-12 | 2009-12-21 | Kodalfa B�Lg� Ve �Let���M Teknoloj�Ler� Sanay� Ve T�Caret A.�. | Remote wireless climate monitoring and control system for greenhouses |
US10716269B2 (en) | 2008-08-12 | 2020-07-21 | Rain Bird Corporation | Methods and systems for irrigation control |
JP4806059B2 (en) * | 2009-09-09 | 2011-11-02 | 株式会社東芝 | Energy management system and energy management method |
US9703275B2 (en) | 2011-06-23 | 2017-07-11 | Rain Bird Corporation | Methods and systems for irrigation and climate control |
US9207698B2 (en) | 2012-06-20 | 2015-12-08 | Causam Energy, Inc. | Method and apparatus for actively managing electric power over an electric power grid |
US9465398B2 (en) | 2012-06-20 | 2016-10-11 | Causam Energy, Inc. | System and methods for actively managing electric power over an electric power grid |
US9461471B2 (en) | 2012-06-20 | 2016-10-04 | Causam Energy, Inc | System and methods for actively managing electric power over an electric power grid and providing revenue grade date usable for settlement |
US10475138B2 (en) | 2015-09-23 | 2019-11-12 | Causam Energy, Inc. | Systems and methods for advanced energy network |
US9513648B2 (en) | 2012-07-31 | 2016-12-06 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US8849715B2 (en) | 2012-10-24 | 2014-09-30 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US10861112B2 (en) | 2012-07-31 | 2020-12-08 | Causam Energy, Inc. | Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform |
US8983669B2 (en) | 2012-07-31 | 2015-03-17 | Causam Energy, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
WO2015162804A1 (en) * | 2014-04-23 | 2015-10-29 | Nec Corporation | Electricity distribution system with dynamic cooperative microgrids for real-time operation |
US9193273B1 (en) | 2014-06-15 | 2015-11-24 | Efficient Drivetrains, Inc. | Vehicle with AC-to-DC inverter system for vehicle-to-grid power integration |
JP6386064B2 (en) * | 2014-09-26 | 2018-09-05 | 京セラ株式会社 | Power management apparatus, power management method, and power management system |
EP3057193A1 (en) * | 2015-02-11 | 2016-08-17 | Alcatel Lucent | Method and system for providing energy services |
US9804210B2 (en) * | 2015-08-31 | 2017-10-31 | Comcast Cable Communications, Llc | Authentication, authorization, and/or accounting of power-consuming devices |
EP3261102A1 (en) | 2016-06-23 | 2017-12-27 | Rain Bird Corporation | Universal solenoid |
US10980120B2 (en) | 2017-06-15 | 2021-04-13 | Rain Bird Corporation | Compact printed circuit board |
US10613492B2 (en) | 2017-07-26 | 2020-04-07 | General Electric Company | Method and system for providing flexible reserve power for power grid |
US11503782B2 (en) | 2018-04-11 | 2022-11-22 | Rain Bird Corporation | Smart drip irrigation emitter |
ES2947812T3 (en) * | 2018-06-15 | 2023-08-21 | Vestas Wind Sys As | Control of a power plant with at least one wind turbine |
CN110752629B (en) * | 2019-10-25 | 2021-07-27 | 中民新能投资集团有限公司 | An energy optimization management method for AC-DC hybrid household microgrid |
US11721465B2 (en) | 2020-04-24 | 2023-08-08 | Rain Bird Corporation | Solenoid apparatus and methods of assembly |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080183337A1 (en) * | 2007-01-31 | 2008-07-31 | Fifth Light Technology Ltd. | Methods and systems for controlling addressable lighting units |
Family Cites Families (389)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE508815A (en) | 1949-07-23 | |||
US3010812A (en) | 1958-09-19 | 1961-11-28 | Universal Oil Prod Co | Stabilization of organic compounds |
US3906242A (en) | 1974-08-16 | 1975-09-16 | Megatherm Corp | Computerized peak-shaving system for alleviating electric utility peak loads |
US4023043A (en) | 1974-08-16 | 1977-05-10 | Megatherm Corporation | Computerized peak-shaving system for alleviating electric utility peak loads |
US4589075A (en) | 1983-02-23 | 1986-05-13 | Buennagel James A | Remote load data acquisition and control system for a power network |
GB8606217D0 (en) | 1986-03-13 | 1986-04-16 | Univ Strathclyde | Local area network priority control system |
US4799059A (en) | 1986-03-14 | 1989-01-17 | Enscan, Inc. | Automatic/remote RF instrument monitoring system |
US4819180A (en) | 1987-02-13 | 1989-04-04 | Dencor Energy Cost Controls, Inc. | Variable-limit demand controller for metering electrical energy |
AU3150493A (en) | 1989-09-07 | 1994-06-22 | Lexington Power Management Corporation | Subscriber electric power load control system |
US5237507A (en) | 1990-12-21 | 1993-08-17 | Chasek Norman E | System for developing real time economic incentives to encourage efficient use of the resources of a regulated electric utility |
US5544036A (en) | 1992-03-25 | 1996-08-06 | Brown, Jr.; Robert J. | Energy management and home automation system |
US5388101A (en) | 1992-10-26 | 1995-02-07 | Eon Corporation | Interactive nationwide data service communication system for stationary and mobile battery operated subscriber units |
US5361982A (en) | 1993-07-12 | 1994-11-08 | Johnson Service Company | Temperature control system having central control for thermostats |
US5542035A (en) | 1993-10-27 | 1996-07-30 | Elonex Technologies | Timer-controlled computer system shutdown and startup |
US5462225A (en) | 1994-02-04 | 1995-10-31 | Scientific-Atlanta, Inc. | Apparatus and method for controlling distribution of electrical energy to a space conditioning load |
US5570002A (en) | 1994-02-18 | 1996-10-29 | Ergo Mechanical Systems, Incorporated | Universal power-supply connection system for multiple electronic devices |
US5675503A (en) | 1994-04-19 | 1997-10-07 | Denver Energy Cost Controls, Inc. | Adaptive load cycler for controlled reduction of energy use |
US5644173A (en) | 1994-10-25 | 1997-07-01 | Elliason; Kurt L. | Real time and/shed load based on received tier pricing and direct load control with processors for each load |
US5640153A (en) | 1994-12-02 | 1997-06-17 | Excel Energy Technologies, Ltd. | Energy utilization controller and control system and method |
US6961641B1 (en) | 1994-12-30 | 2005-11-01 | Power Measurement Ltd. | Intra-device communications architecture for managing electrical power distribution and consumption |
US6988025B2 (en) | 2000-11-28 | 2006-01-17 | Power Measurement Ltd. | System and method for implementing XML on an energy management device |
US7188003B2 (en) | 1994-12-30 | 2007-03-06 | Power Measurement Ltd. | System and method for securing energy management systems |
US6944555B2 (en) | 1994-12-30 | 2005-09-13 | Power Measurement Ltd. | Communications architecture for intelligent electronic devices |
US5572438A (en) | 1995-01-05 | 1996-11-05 | Teco Energy Management Services | Engery management and building automation system |
US5734255A (en) | 1996-03-13 | 1998-03-31 | Alaska Power Systems Inc. | Control system and circuits for distributed electrical power generating stations |
US6115676A (en) | 1996-04-09 | 2000-09-05 | General Electric Company | Methods and apparatus for performing load profile and load control |
NO302206B1 (en) | 1996-06-05 | 1998-02-02 | Kjell Oevreboe | Temperature and time control of electrically operated heating devices |
JP3402953B2 (en) | 1996-09-13 | 2003-05-06 | 株式会社東芝 | Communication method, communication system and communication device |
US6078785A (en) | 1996-10-15 | 2000-06-20 | Bush; E. William | Demand reporting of electricity consumption by radio in relays to a base station, and demand relays wattmeters so reporting over a wide area |
WO1998033153A1 (en) | 1997-01-24 | 1998-07-30 | Lawrence Gelbien | Pager-based controller |
US7216043B2 (en) | 1997-02-12 | 2007-05-08 | Power Measurement Ltd. | Push communications architecture for intelligent electronic devices |
US6233327B1 (en) | 1997-02-14 | 2001-05-15 | Statsignal Systems, Inc. | Multi-function general purpose transceiver |
JPH114244A (en) | 1997-04-15 | 1999-01-06 | Yazaki Corp | Abnormality monitoring method/system for network |
US5926776A (en) | 1997-06-04 | 1999-07-20 | Gas Research Institute | Smart thermostat having a transceiver interface |
WO1999013676A2 (en) | 1997-09-12 | 1999-03-18 | Williams Wireless, Inc. | Wide area telemetry network |
US6107693A (en) | 1997-09-19 | 2000-08-22 | Solo Energy Corporation | Self-contained energy center for producing mechanical, electrical, and heat energy |
US5924486A (en) | 1997-10-29 | 1999-07-20 | Tecom, Inc. | Environmental condition control and energy management system and method |
US6778099B1 (en) | 1998-05-01 | 2004-08-17 | Elster Electricity, Llc | Wireless area network communications module for utility meters |
US6037758A (en) | 1998-05-21 | 2000-03-14 | The Research Foundation Of State University Of New York | Load controller and method to enhance effective capacity of a photovoltaic power supply |
US6529839B1 (en) | 1998-05-28 | 2003-03-04 | Retx.Com, Inc. | Energy coordination system |
US6437692B1 (en) | 1998-06-22 | 2002-08-20 | Statsignal Systems, Inc. | System and method for monitoring and controlling remote devices |
US6891838B1 (en) | 1998-06-22 | 2005-05-10 | Statsignal Ipc, Llc | System and method for monitoring and controlling residential devices |
US6914893B2 (en) | 1998-06-22 | 2005-07-05 | Statsignal Ipc, Llc | System and method for monitoring and controlling remote devices |
US6914533B2 (en) | 1998-06-22 | 2005-07-05 | Statsignal Ipc Llc | System and method for accessing residential monitoring devices |
JP2000078748A (en) | 1998-09-02 | 2000-03-14 | Mitsubishi Electric Corp | Power dsm system |
US6304552B1 (en) | 1998-09-11 | 2001-10-16 | Nortel Networks Limited | Memory and apparatus for input based control of discards in a lossy packet network |
US7103511B2 (en) | 1998-10-14 | 2006-09-05 | Statsignal Ipc, Llc | Wireless communication networks for providing remote monitoring of devices |
US6553418B1 (en) | 1999-01-02 | 2003-04-22 | Daniel J. Collins | Energy information and control system |
US20040095237A1 (en) * | 1999-01-09 | 2004-05-20 | Chen Kimball C. | Electronic message delivery system utilizable in the monitoring and control of remote equipment and method of same |
US6636977B1 (en) | 1999-03-10 | 2003-10-21 | Shin Jiuh Corp. | Control device for use in a power supplying apparatus including multiple processors adapted to perform separate functions associated with status monitoring and load balancing |
US7650425B2 (en) | 1999-03-18 | 2010-01-19 | Sipco, Llc | System and method for controlling communication between a host computer and communication devices associated with remote devices in an automated monitoring system |
US7263073B2 (en) | 1999-03-18 | 2007-08-28 | Statsignal Ipc, Llc | Systems and methods for enabling a mobile user to notify an automated monitoring system of an emergency situation |
US6907566B1 (en) | 1999-04-02 | 2005-06-14 | Overture Services, Inc. | Method and system for optimum placement of advertisements on a webpage |
US7539628B2 (en) | 2000-03-21 | 2009-05-26 | Bennett James D | Online purchasing system supporting buyer affordability screening |
US7702537B2 (en) | 1999-05-28 | 2010-04-20 | Yahoo! Inc | System and method for enabling multi-element bidding for influencing a position on a search result list generated by a computer network search engine |
US7085739B1 (en) | 1999-10-20 | 2006-08-01 | Accenture Llp | Method and system for facilitating, coordinating and managing a competitive marketplace |
US6254009B1 (en) | 1999-12-08 | 2001-07-03 | Carrier Corporation | Communicating thermostat |
US20010030468A1 (en) | 1999-12-16 | 2001-10-18 | Anderson George A. | Method and apparatus utilized for priority sequencing |
US20040024483A1 (en) | 1999-12-23 | 2004-02-05 | Holcombe Bradford L. | Controlling utility consumption |
US6535797B1 (en) | 2000-02-01 | 2003-03-18 | Spectrum Engineering Corporation | Electrical distribution system and method of monitoring and/or controlling same |
US20020138176A1 (en) | 2000-02-01 | 2002-09-26 | Patrick Davis | Automated aggregation and management of distributed electric load reduction |
US6401075B1 (en) | 2000-02-14 | 2002-06-04 | Global Network, Inc. | Methods of placing, purchasing and monitoring internet advertising |
CA2403888C (en) | 2000-03-20 | 2007-05-29 | Alpha Technologies Inc. | Uninterruptible power supplies using fuel cells |
US6583521B1 (en) | 2000-03-21 | 2003-06-24 | Martin Lagod | Energy management system which includes on-site energy supply |
JP2001306839A (en) | 2000-04-17 | 2001-11-02 | Sanyo Electric Co Ltd | Method and system for dealings of carbon dioxide discharge right |
US8725657B2 (en) | 2000-05-22 | 2014-05-13 | Secure Electrans Limited | Utility metering system incorporating a transaction authorisation system |
US6519509B1 (en) | 2000-06-22 | 2003-02-11 | Stonewater Software, Inc. | System and method for monitoring and controlling energy distribution |
WO2002007365A2 (en) | 2000-07-13 | 2002-01-24 | Nxegen | System and method for monitoring and controlling energy usage |
JP4523124B2 (en) | 2000-07-14 | 2010-08-11 | 日立アプライアンス株式会社 | Energy service business system |
EP1320793A2 (en) | 2000-07-21 | 2003-06-25 | Itron Inc. | Spread spectrum meter reading system utilizing low-speed/high-power frequency hopping |
ES2349698T3 (en) | 2000-08-01 | 2011-01-10 | Itron Inc. | SPECTRUM SYSTEM EXTENDED FOR FREQUENCY JUMPS WITH MONITORING OR TRACKING AND HIGH SENSITIVITY SYNCHRONIZATION FOR UNSTABLE FREQUENCY SIGNS. |
US20020019802A1 (en) | 2000-08-07 | 2002-02-14 | Ross Malme | System and methods for aggregation and liquidation of curtailment energy resources |
AU2001239931A1 (en) | 2000-08-08 | 2002-02-18 | Retx.Com, Inc. | Load management dispatch system and methods |
AU2001279241A1 (en) | 2000-08-09 | 2002-02-18 | Statsignal Systems, Inc. | Systems and methods for providing remote monitoring of electricity consumption for an electric meter |
US9256905B2 (en) | 2000-08-25 | 2016-02-09 | Paradigm Shifting Solutions | Intelligent routing of electric power |
JP2002092098A (en) | 2000-09-20 | 2002-03-29 | Hitachi Ltd | Method for recovering energy saving facility cost and system for the same |
US6577962B1 (en) | 2000-09-28 | 2003-06-10 | Silicon Energy, Inc. | System and method for forecasting energy usage load |
US20020036430A1 (en) | 2000-09-28 | 2002-03-28 | Welches Richard S. | Local area grid for distributed power |
US6868293B1 (en) | 2000-09-28 | 2005-03-15 | Itron, Inc. | System and method for energy usage curtailment |
US6904408B1 (en) | 2000-10-19 | 2005-06-07 | Mccarthy John | Bionet method, system and personalized web content manager responsive to browser viewers' psychological preferences, behavioral responses and physiological stress indicators |
US6601033B1 (en) | 2000-10-24 | 2003-07-29 | Richard F. Sowinski | Pollution credit method using electronic networks |
AU2002220116A1 (en) | 2000-11-01 | 2002-05-15 | International Carbon Bank And Exchange | Method and system for banking and exchanging emission reduction credits |
US6906617B1 (en) | 2000-11-17 | 2005-06-14 | Koninklijke Philips Electronics N.V. | Intelligent appliance home network |
US20020084655A1 (en) | 2000-12-29 | 2002-07-04 | Abb Research Ltd. | System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility |
GB0100470D0 (en) | 2001-01-09 | 2001-02-21 | Queen Mary & Westfield College | Organopolysiloxanes containing phosphonic groups, methods for the production and use thereof |
US6784807B2 (en) | 2001-02-09 | 2004-08-31 | Statsignal Systems, Inc. | System and method for accurate reading of rotating disk |
US6673479B2 (en) | 2001-03-15 | 2004-01-06 | Hydrogenics Corporation | System and method for enabling the real time buying and selling of electricity generated by fuel cell powered vehicles |
US6621179B1 (en) | 2001-04-05 | 2003-09-16 | John E. Howard | Device for curtailing electric demand |
US6718761B2 (en) | 2001-04-10 | 2004-04-13 | New World Generation Inc. | Wind powered hydroelectric power plant and method of operation thereof |
US7366164B1 (en) | 2001-04-19 | 2008-04-29 | Cisco Technology, Inc. | Method for regulating power for voice over Internet Protocol telephones |
US20030009401A1 (en) * | 2001-04-27 | 2003-01-09 | Enerwise Global Technologies, Inc. | Computerized utility cost estimation method and system |
US20020198629A1 (en) | 2001-04-27 | 2002-12-26 | Enerwise Global Technologies, Inc. | Computerized utility cost estimation method and system |
US6778882B2 (en) | 2001-05-10 | 2004-08-17 | Siemens Westinghouse Power Corporation | Business management system and method for a deregulated electric power market with sharing of supply chain data |
US6865450B2 (en) | 2001-05-10 | 2005-03-08 | Siemens Westinghouse Power Corporation | Schedule-based load estimator and method for electric power and other utilities and resources |
US7747165B2 (en) | 2001-06-13 | 2010-06-29 | Alcatel-Lucent Usa Inc. | Network operating system with topology autodiscovery |
US7136725B1 (en) | 2001-06-21 | 2006-11-14 | Paciorek Ronald R | Load shed notification method, product, and apparatus |
US7039532B2 (en) | 2001-06-28 | 2006-05-02 | Hunter Robert R | Method and apparatus for reading and controlling utility consumption |
US6622097B2 (en) | 2001-06-28 | 2003-09-16 | Robert R. Hunter | Method and apparatus for reading and controlling electric power consumption |
US6879059B2 (en) | 2001-07-05 | 2005-04-12 | Sleva Associates, Inc. | Interruptible power supply module |
US20030009705A1 (en) | 2001-07-09 | 2003-01-09 | Michael Thelander | Monitoring and synchronization of power use of computers in a network |
US7324876B2 (en) | 2001-07-10 | 2008-01-29 | Yingco Electronic Inc. | System for remotely controlling energy distribution at local sites |
US6832135B2 (en) | 2001-07-10 | 2004-12-14 | Yingco Electronic Inc. | System for remotely controlling energy distribution at local sites |
US7778940B2 (en) | 2001-07-11 | 2010-08-17 | Mazzarella Joseph R | System and method for creating and operating an enhanced distributed energy network or virtual power plant |
US6990593B2 (en) | 2001-07-31 | 2006-01-24 | Hewlett-Packard Development Company, L.P. | Method for diverting power reserves and shifting activities according to activity priorities in a server cluster in the event of a power interruption |
US7346463B2 (en) | 2001-08-09 | 2008-03-18 | Hunt Technologies, Llc | System for controlling electrically-powered devices in an electrical network |
US6671586B2 (en) | 2001-08-15 | 2003-12-30 | Statsignal Systems, Inc. | System and method for controlling power demand over an integrated wireless network |
US20030036810A1 (en) | 2001-08-15 | 2003-02-20 | Petite Thomas D. | System and method for controlling generation over an integrated wireless network |
US20030036820A1 (en) | 2001-08-16 | 2003-02-20 | International Business Machines Corporation | Method for optimizing energy consumption and cost |
US7188260B1 (en) | 2001-08-29 | 2007-03-06 | Cisco Technology, Inc. | Apparatus and method for centralized power management |
US6747368B2 (en) | 2001-08-30 | 2004-06-08 | Harold M. Jarrett, Jr. | Wireless control of power transfer switches for electrical load management |
US20030083980A1 (en) | 2001-08-31 | 2003-05-01 | Tsukasa Satake | Greenhouse effect gas emission index monitoring and converting system |
US6745106B2 (en) | 2001-09-04 | 2004-06-01 | Emware, Inc. | Tone generating electronic device with paging module for verification of energy curtailment |
WO2003023675A2 (en) | 2001-09-13 | 2003-03-20 | Abb Ab | Method and system to calculate a demand for energy |
US20030063723A1 (en) | 2001-09-28 | 2003-04-03 | Derek Booth | Interactive system for managing and remotely connecting customer utility loads |
US6622925B2 (en) | 2001-10-05 | 2003-09-23 | Enernet Corporation | Apparatus and method for wireless control |
US7480501B2 (en) | 2001-10-24 | 2009-01-20 | Statsignal Ipc, Llc | System and method for transmitting an emergency message over an integrated wireless network |
US7424527B2 (en) | 2001-10-30 | 2008-09-09 | Sipco, Llc | System and method for transmitting pollution information over an integrated wireless network |
US6687574B2 (en) | 2001-11-01 | 2004-02-03 | Telcordia Technologies, Inc. | System and method for surveying utility outages |
US6732055B2 (en) | 2001-11-06 | 2004-05-04 | General Electric Company | Methods and systems for energy and emissions monitoring |
US6904336B2 (en) | 2001-12-28 | 2005-06-07 | Fannie Mae | System and method for residential emissions trading |
US20030229572A1 (en) | 2001-12-28 | 2003-12-11 | Icf Consulting | Measurement and verification protocol for tradable residential emissions reductions |
AU2003215403A1 (en) | 2002-02-25 | 2003-09-09 | General Electric Company | Integrated protection, monitoring and control system |
US20030171851A1 (en) | 2002-03-08 | 2003-09-11 | Peter J. Brickfield | Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems |
CA2480551A1 (en) | 2002-03-28 | 2003-10-09 | Robertshaw Controls Company | Energy management system and method |
US20060069616A1 (en) | 2004-09-30 | 2006-03-30 | David Bau | Determining advertisements using user behavior information such as past navigation information |
US20050021397A1 (en) | 2003-07-22 | 2005-01-27 | Cui Yingwei Claire | Content-targeted advertising using collected user behavior data |
WO2003085798A2 (en) | 2002-04-01 | 2003-10-16 | Battelle Memorial Institute | Energy management system |
US7049976B2 (en) | 2002-04-15 | 2006-05-23 | Hunt Power, L.P. | User-installable power consumption monitoring system |
EP1367685A1 (en) | 2002-05-31 | 2003-12-03 | Whirlpool Corporation | Electronic system for power consumption management of appliances |
US7561977B2 (en) | 2002-06-13 | 2009-07-14 | Whirlpool Corporation | Total home energy management system |
US8165959B2 (en) | 2002-06-24 | 2012-04-24 | Siebel Systems, Inc. | Method and apparatus for pricing calculation |
US7343341B2 (en) | 2002-07-20 | 2008-03-11 | Chicago Climate Exchange, Inc. | Systems and methods for trading emission reductions |
GB0218452D0 (en) | 2002-08-08 | 2002-09-18 | Lal Depak | Energy consumption monitoring |
US20040044571A1 (en) | 2002-08-27 | 2004-03-04 | Bronnimann Eric Robert | Method and system for providing advertising listing variance in distribution feeds over the internet to maximize revenue to the advertising distributor |
AU2003274965A1 (en) | 2002-10-01 | 2004-04-23 | Widefi, Inc. | Wireless local area network with repeater for enhancing network coverage |
US7463986B2 (en) | 2002-10-25 | 2008-12-09 | Hudson Bay Wireless Llc | Electrical power metering system |
JP2004180412A (en) | 2002-11-26 | 2004-06-24 | Matsushita Electric Works Ltd | Load control system and management system |
US7440871B2 (en) | 2002-12-09 | 2008-10-21 | Verisae, Inc. | Method and system for tracking and reporting emissions |
US7142949B2 (en) | 2002-12-09 | 2006-11-28 | Enernoc, Inc. | Aggregation of distributed generation resources |
US7877235B2 (en) | 2003-01-31 | 2011-01-25 | Verisae, Inc. | Method and system for tracking and managing various operating parameters of enterprise assets |
ES2538484T3 (en) | 2003-01-21 | 2015-06-22 | Whirlpool Corporation | A process to manage and reduce the power demand of household appliances and their components, and the system that uses said process |
US20040158541A1 (en) * | 2003-02-06 | 2004-08-12 | Ultrawatt Energy Systems, Inc. | Power savings financial compensation control method and system |
US7457758B2 (en) | 2003-02-10 | 2008-11-25 | South Dakota School Of Mines And Technology | Method and apparatus for generating standardized carbon emission reduction credits |
US6909941B2 (en) | 2003-02-13 | 2005-06-21 | Iso New England Inc. | Methods for the management of a bulk electric power market |
JP2004248174A (en) | 2003-02-17 | 2004-09-02 | Canon Inc | Communication network, and node instrument and transmission control method used therein |
DE10309164A1 (en) | 2003-02-28 | 2004-09-09 | Siemens Ag | Scheduling of real-time communication in switched networks |
WO2004081116A1 (en) | 2003-03-06 | 2004-09-23 | Exxonmobil Chemical Patents, Inc. | Oriented thermoplastic elastomer film and process for producing the same |
US7089089B2 (en) | 2003-03-31 | 2006-08-08 | Power Measurement Ltd. | Methods and apparatus for retrieving energy readings from an energy monitoring device |
US6834811B1 (en) | 2003-04-01 | 2004-12-28 | Hewlett-Packard Development Company, L.P. | Market-based temperature control system and method |
US7305282B2 (en) | 2003-05-13 | 2007-12-04 | Siemens Power Transmission & Distribution, Inc. | Very short term load prediction in an energy management system |
US20040230533A1 (en) | 2003-05-16 | 2004-11-18 | Benco David S. | Pro-rated consumable resource governor |
US20070043478A1 (en) | 2003-07-28 | 2007-02-22 | Ehlers Gregory A | System and method of controlling an HVAC system |
US7003640B2 (en) | 2003-07-28 | 2006-02-21 | Hewlett-Packard Development Company, L.P. | Power-aware adaptation in an information server |
US7233843B2 (en) | 2003-08-08 | 2007-06-19 | Electric Power Group, Llc | Real-time performance monitoring and management system |
US20050055432A1 (en) | 2003-09-08 | 2005-03-10 | Smart Synch, Inc. | Systems and methods for remote power management using 802.11 wireless protocols |
US7289887B2 (en) | 2003-09-08 | 2007-10-30 | Smartsynch, Inc. | Systems and methods for remote power management using IEEE 802 based wireless communication links |
US7313465B1 (en) | 2003-09-11 | 2007-12-25 | Dte Energy Technologies, Inc. | System and method for managing energy generation equipment |
WO2005031589A1 (en) | 2003-09-23 | 2005-04-07 | Marchex, Inc. | Performance-based online advertising system and method |
US7395444B2 (en) | 2003-09-23 | 2008-07-01 | American Power Conversion Corporation | Power status notification |
US20040225514A1 (en) | 2003-09-26 | 2004-11-11 | Simon Greenshields | Monetizing a contract to supply a commodity |
US8527346B2 (en) | 2003-09-29 | 2013-09-03 | Yahoo! Inc. | Method and system for scheduling electronic advertising |
US7209804B2 (en) | 2003-10-06 | 2007-04-24 | Power Monitors, Inc. | System and method for providing remote monitoring of voltage power transmission and distribution devices |
US7346615B2 (en) | 2003-10-09 | 2008-03-18 | Google, Inc. | Using match confidence to adjust a performance threshold |
US7010437B2 (en) | 2003-11-03 | 2006-03-07 | Abb Research Ltd. | Electric utility storm outage management |
US7930206B2 (en) | 2003-11-03 | 2011-04-19 | Google Inc. | System and method for enabling an advertisement to follow the user to additional web pages |
US7167777B2 (en) | 2003-11-04 | 2007-01-23 | Powerweb Technologies | Wireless internet lighting control system |
GR1004981B (en) | 2003-11-06 | 2005-09-09 | �������������� �������� ����������� ��� ��������� ������� (����) � | Remote control management of products and services |
KR100560747B1 (en) | 2003-11-10 | 2006-03-13 | 삼성전자주식회사 | How to send medical data using medical label |
US20050125243A1 (en) | 2003-12-09 | 2005-06-09 | Villalobos Victor M. | Electric power shuttling and management system, and method |
US20060142961A1 (en) | 2003-12-12 | 2006-06-29 | Verisae, Inc. | Enterprise energy management system |
US7177728B2 (en) | 2003-12-30 | 2007-02-13 | Jay Warren Gardner | System and methods for maintaining power usage within a set allocation |
EP1571745A1 (en) | 2004-03-01 | 2005-09-07 | Alcatel | Power consumption management method |
US8635350B2 (en) | 2006-06-12 | 2014-01-21 | Icontrol Networks, Inc. | IP device discovery systems and methods |
AU2005223267B2 (en) | 2004-03-16 | 2010-12-09 | Icontrol Networks, Inc. | Premises management system |
US7711796B2 (en) | 2006-06-12 | 2010-05-04 | Icontrol Networks, Inc. | Gateway registry methods and systems |
US7412304B2 (en) | 2004-03-25 | 2008-08-12 | Ip Power Systems Corporation | Power system for area containing a set of power consumers |
US20050234600A1 (en) | 2004-04-16 | 2005-10-20 | Energyconnect, Inc. | Enterprise energy automation |
US20050240314A1 (en) | 2004-04-27 | 2005-10-27 | Martinez Edwin A | Method and apparatus for controlling and monitoring electrical power consumption |
US7181320B2 (en) | 2004-05-12 | 2007-02-20 | General Electric Company | Systems, methods and computer program products for continuous emissions monitoring on-line |
WO2007001247A2 (en) | 2004-06-02 | 2007-01-04 | Yahoo! Inc. | Content-management system for user behavior targeting |
US20050276222A1 (en) | 2004-06-10 | 2005-12-15 | Kumar Gopal N | Platform level overload control |
US20060020544A1 (en) | 2004-07-23 | 2006-01-26 | Johnson Controls Technology Company | System and method for tracking emissions |
US7283062B2 (en) | 2004-07-28 | 2007-10-16 | Itron, Inc. | Mapping in mobile data collection systems, such as for utility meter reading and related applications |
US20060031934A1 (en) | 2004-08-04 | 2006-02-09 | Stonewater Control Systems, Inc. | Monitoring system |
JP2006060911A (en) | 2004-08-19 | 2006-03-02 | Osaka Gas Co Ltd | Demand management system |
BG108851A (en) | 2004-08-23 | 2006-02-28 | Георги Стоилов | Momentary electricity market |
KR20060036171A (en) | 2004-10-25 | 2006-04-28 | 주식회사인티마햅 | Service blocking / control processing method through user terminal on network |
FR2878106A1 (en) | 2004-11-15 | 2006-05-19 | France Telecom | METHOD AND DEVICE FOR ORDERING PACKETS FOR THEIR ROUTING IN A NETWORK WITH IMPLICIT DETERMINATION OF PACKETS TO BE PROCESSED IN PRIORITY |
US20060195334A1 (en) | 2004-11-17 | 2006-08-31 | Reeb Shayne A | Integrated environmental emission reduction data management system and method |
US20060106635A1 (en) | 2004-11-18 | 2006-05-18 | Karl Ulrich | Emission remediation |
US7345998B2 (en) | 2004-12-15 | 2008-03-18 | Smart Labs, Inc. | Mesh network of intelligent devices communicating via powerline and radio frequency |
US7181293B2 (en) | 2004-12-27 | 2007-02-20 | Intel Corporation | System and method for enabling home power management |
US7917387B2 (en) | 2005-01-07 | 2011-03-29 | Kayak Software Corporation | Individualized marketing to improve capacity utilization |
MX2007008734A (en) | 2005-01-18 | 2008-03-10 | Mc Energy Inc | Method and system for tracking and budgeting energy usage. |
US8078418B2 (en) * | 2005-01-27 | 2011-12-13 | Electro Industries/Gauge Tech | Intelligent electronic device and method thereof |
US8768766B2 (en) | 2005-03-07 | 2014-07-01 | Turn Inc. | Enhanced online advertising system |
WO2006096854A2 (en) | 2005-03-08 | 2006-09-14 | E-Radio Usa, Inc. | Systems and methods for modifying power usage |
US7747632B2 (en) | 2005-03-31 | 2010-06-29 | Google Inc. | Systems and methods for providing subscription-based personalization |
EP1729223A3 (en) | 2005-06-01 | 2011-12-14 | Sanyo Electric Co., Ltd. | Demand control apparatus, electric power consumption prediction method, and program therefor |
US7274975B2 (en) | 2005-06-06 | 2007-09-25 | Gridpoint, Inc. | Optimized energy management system |
US10510043B2 (en) | 2005-06-13 | 2019-12-17 | Skyword Inc. | Computer method and apparatus for targeting advertising |
US7492617B2 (en) | 2005-06-29 | 2009-02-17 | Northern Power Systems, Inc. | Frequency control and power balancing in disturbed power inverter system and method thereof |
US9418040B2 (en) | 2005-07-07 | 2016-08-16 | Sciencelogic, Inc. | Dynamically deployable self configuring distributed network management system |
KR100728279B1 (en) | 2005-07-13 | 2007-06-13 | 삼성전자주식회사 | Bandwidth Management System and Method for Guaranteeing QOS in VIO Network |
US7528503B2 (en) | 2005-07-22 | 2009-05-05 | Cannon Technologies, Inc. | Load shedding control for cycled or variable load appliances |
US7536240B2 (en) | 2005-07-22 | 2009-05-19 | Ut-Battelle, Llc | Real power regulation for the utility power grid via responsive loads |
US20070027760A1 (en) | 2005-07-29 | 2007-02-01 | Collins Robert J | System and method for creating and providing a user interface for displaying advertiser defined groups of advertisement campaign information |
US8032635B2 (en) | 2005-07-29 | 2011-10-04 | Sap Ag | Grid processing in a trading network |
US20070038563A1 (en) | 2005-08-15 | 2007-02-15 | Eric Ryzerski | Systems and methods for managing buildings and finances |
US7719995B2 (en) | 2005-09-09 | 2010-05-18 | Zeugma Systems Inc. | Application driven fast unicast flow replication |
US7546167B2 (en) | 2005-09-12 | 2009-06-09 | Abl Ip Holdings Llc | Network operation center for a light management system having networked intelligent luminaire managers |
US20070070895A1 (en) | 2005-09-26 | 2007-03-29 | Paolo Narvaez | Scaleable channel scheduler system and method |
US7725464B2 (en) | 2005-09-27 | 2010-05-25 | Looksmart, Ltd. | Collection and delivery of internet ads |
US8095233B1 (en) | 2005-10-11 | 2012-01-10 | American Grid, Inc. | Interconnected premises equipment for energy management |
US20070091900A1 (en) | 2005-10-20 | 2007-04-26 | Nokia Corporation | Prioritized control packet delivery for transmission control protocol (TCP) |
US7315769B2 (en) | 2005-10-31 | 2008-01-01 | General Electric Company | Multi-tier benefit optimization for operating the power systems including renewable and traditional generation, energy storage, and controllable loads |
US8571930B1 (en) | 2005-10-31 | 2013-10-29 | A9.Com, Inc. | Strategies for determining the value of advertisements using randomized performance estimates |
JP2007132553A (en) | 2005-11-08 | 2007-05-31 | Denso Corp | Hot water storage type water heater |
US8417569B2 (en) | 2005-11-30 | 2013-04-09 | John Nicholas and Kristin Gross Trust | System and method of evaluating content based advertising |
MX2008008108A (en) | 2005-12-24 | 2008-09-24 | Rich Media Club Llc A Delaware | System and method for the creation, distribution and tracking of advertising via electronic networks. |
US7657763B2 (en) * | 2005-12-29 | 2010-02-02 | Panasonic Electric Works Co., Ltd. | Systems and methods for selectively controlling electrical outlets using power profiling |
US7827060B2 (en) | 2005-12-30 | 2010-11-02 | Google Inc. | Using estimated ad qualities for ad filtering, ranking and promotion |
US20070156887A1 (en) | 2005-12-30 | 2007-07-05 | Daniel Wright | Predicting ad quality |
WO2007095557A2 (en) | 2006-02-13 | 2007-08-23 | Junaid Ali | Web-based application or system for managing and coordinating review-enabled content |
US20070203722A1 (en) | 2006-02-28 | 2007-08-30 | Richards Randall R | Method for determining a future value of greenhouse gas credits |
US7660640B2 (en) | 2006-03-07 | 2010-02-09 | Siemens Aktiengesellschaft | Apparatus and method for predictive control of a power generation system |
US20090240381A1 (en) | 2006-03-24 | 2009-09-24 | Rtp Controls | Method and apparatus for controlling power consumption |
US8829799B2 (en) | 2006-03-28 | 2014-09-09 | Wireless Environment, Llc | Autonomous grid shifting lighting device |
KR20070098172A (en) | 2006-03-31 | 2007-10-05 | 주식회사 대우일렉트로닉스 | How to control home network system and home appliances |
US20100138451A1 (en) | 2006-04-03 | 2010-06-03 | Assaf Henkin | Techniques for facilitating on-line contextual analysis and advertising |
US20070255457A1 (en) | 2006-04-28 | 2007-11-01 | Bright Planet Network, Inc. | Consumer Pollution Impact Profile System and Method |
US20070282495A1 (en) | 2006-05-11 | 2007-12-06 | University Of Delaware | System and method for assessing vehicle to grid (v2g) integration |
US20100163634A1 (en) | 2006-05-18 | 2010-07-01 | Klein Michael J | Systems and methods for monitoring, controlling and limiting usage of utilities |
US8244642B2 (en) | 2006-06-22 | 2012-08-14 | Itron, Inc. | System and method for storing metering data while increasing memory endurance |
US20070299562A1 (en) | 2006-06-26 | 2007-12-27 | Lawrence Kates | Method and apparatus for temperature-based load management metering in an electric power system |
KR100701298B1 (en) | 2006-07-07 | 2007-03-29 | 주식회사 실버크리너 | Ubiquitous remote meter reading and blocking system using home automation system and method |
US20090043520A1 (en) | 2006-08-10 | 2009-02-12 | V2Green, Inc. | User Interface and User Control in a Power Aggregation System for Distributed Electric Resources |
US20090043519A1 (en) | 2006-08-10 | 2009-02-12 | V2Green, Inc. | Electric Resource Power Meter in a Power Aggregation System for Distributed Electric Resources |
US20080040223A1 (en) | 2006-08-10 | 2008-02-14 | V2 Green Inc. | Electric Resource Module in a Power Aggregation System for Distributed Electric Resources |
US7747739B2 (en) | 2006-08-10 | 2010-06-29 | Gridpoint, Inc. | Connection locator in a power aggregation system for distributed electric resources |
WO2008039759A2 (en) | 2006-09-25 | 2008-04-03 | Intelligent Management Systems Corporation | System and method for resource management |
US7890436B2 (en) | 2006-10-17 | 2011-02-15 | Clean Power Finance, Inc. | Billing and payment methods and systems enabling consumer premises equipment |
US20080195462A1 (en) | 2006-10-24 | 2008-08-14 | Swooge, Llc | Method And System For Collecting And Correlating Data From Information Sources To Deliver More Relevant And Effective Advertising |
US7680786B2 (en) | 2006-10-30 | 2010-03-16 | Yahoo! Inc. | Optimization of targeted advertisements based on user profile information |
US7795877B2 (en) | 2006-11-02 | 2010-09-14 | Current Technologies, Llc | Power line communication and power distribution parameter measurement system and method |
US7774245B2 (en) | 2006-11-16 | 2010-08-10 | Genea Energy Partners, Inc. | Building optimization platform and web-based invoicing system |
US20080154801A1 (en) | 2006-12-22 | 2008-06-26 | Genedics Llc | System and Method for Creating a Geothermal Roadway Utility with Alternative Energy Pumping Billing System |
US7787405B2 (en) | 2007-01-08 | 2010-08-31 | International Business Machines Corporation | Method for utilization of active power profiles used in prediction of power reserves for remote devices |
US7698233B1 (en) * | 2007-01-23 | 2010-04-13 | Southern Company Services, Inc. | System and method for determining expected unserved energy to quantify generation reliability risks |
US20080177678A1 (en) | 2007-01-24 | 2008-07-24 | Paul Di Martini | Method of communicating between a utility and its customer locations |
US20080189169A1 (en) | 2007-02-01 | 2008-08-07 | Enliven Marketing Technologies Corporation | System and method for implementing advertising in an online social network |
US8364846B2 (en) | 2007-02-02 | 2013-01-29 | Silver Spring Networks, Inc. | Method and system of providing IP-based packet communications with in-premisis devices in a utility network |
US7541941B2 (en) | 2007-03-16 | 2009-06-02 | Greenbox Technology Inc. | System and method for monitoring and estimating energy resource consumption |
US20080238710A1 (en) | 2007-03-23 | 2008-10-02 | Jeff Tolnar | system and method for demand dispatch and load management |
EP2143061A4 (en) | 2007-03-23 | 2015-05-13 | Bpl Global Ltd | System and method for adaptive islanding for stored/distributed energy devices |
US20080249832A1 (en) | 2007-04-04 | 2008-10-09 | Microsoft Corporation | Estimating expected performance of advertisements |
WO2008125697A2 (en) | 2007-04-17 | 2008-10-23 | Timothy Patrick Cooper | A load management controller for a household electrical installation |
US7844605B2 (en) | 2007-04-20 | 2010-11-30 | Yahoo! Inc. | Using natural search click events to optimize online advertising campaigns |
US8035320B2 (en) | 2007-04-20 | 2011-10-11 | Sibert W Olin | Illumination control network |
US7991513B2 (en) | 2007-05-08 | 2011-08-02 | Ecodog, Inc. | Electric energy bill reduction in dynamic pricing environments |
US20080306830A1 (en) | 2007-06-07 | 2008-12-11 | Cliquality, Llc | System for rating quality of online visitors |
US20080306824A1 (en) | 2007-06-08 | 2008-12-11 | Parkinson David C | Empty Space Advertising Engine |
US20080306819A1 (en) | 2007-06-08 | 2008-12-11 | Yahoo! Inc. | System and method for shaping relevance scores for position auctions |
US20080313632A1 (en) | 2007-06-13 | 2008-12-18 | Apurva Kumar | Methods, devices, and products for providing access to system-administration functions of a computer or related resources |
KR20080112692A (en) | 2007-06-22 | 2008-12-26 | 신성델타테크 주식회사 | Remote meter reading system |
US20090006179A1 (en) | 2007-06-26 | 2009-01-01 | Ebay Inc. | Economic optimization for product search relevancy |
US20090012996A1 (en) | 2007-07-02 | 2009-01-08 | Yahoo! Inc. | Syndication optimization system |
US8359215B1 (en) | 2007-07-12 | 2013-01-22 | Ecova, Inc. | System and method for managing utility resources based on normalized utility usage |
US20090024718A1 (en) | 2007-07-20 | 2009-01-22 | Aris Anagnostopoulos | Just-In-Time Contextual Advertising Techniques |
US8707736B2 (en) | 2007-08-06 | 2014-04-29 | Solaria Corporation | Method and apparatus for manufacturing solar concentrators using glass process |
US7693670B2 (en) | 2007-08-14 | 2010-04-06 | General Electric Company | Cognitive electric power meter |
US7565227B2 (en) | 2007-08-15 | 2009-07-21 | Constellation Energy Group, Inc. | Multi-building control for demand response power usage control |
US7877169B2 (en) | 2007-08-21 | 2011-01-25 | Electro Industries/ Gauge Tech | System and method for synchronizing an auxiliary electrical generator to an electrical system |
US8805552B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | Method and apparatus for actively managing consumption of electric power over an electric power grid |
US8700187B2 (en) | 2007-08-28 | 2014-04-15 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US8131403B2 (en) | 2007-08-28 | 2012-03-06 | Consert, Inc. | System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8542685B2 (en) | 2007-08-28 | 2013-09-24 | Consert, Inc. | System and method for priority delivery of load management messages on IP-based networks |
US9130402B2 (en) * | 2007-08-28 | 2015-09-08 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US8145361B2 (en) | 2007-08-28 | 2012-03-27 | Consert, Inc. | System and method for manipulating controlled energy using devices to manage customer bills |
US8890505B2 (en) | 2007-08-28 | 2014-11-18 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US8806239B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators |
US20100235008A1 (en) | 2007-08-28 | 2010-09-16 | Forbes Jr Joseph W | System and method for determining carbon credits utilizing two-way devices that report power usage data |
US7715951B2 (en) | 2007-08-28 | 2010-05-11 | Consert, Inc. | System and method for managing consumption of power supplied by an electric utility |
US8260470B2 (en) | 2007-08-28 | 2012-09-04 | Consert, Inc. | System and method for selective disconnection of electrical service to end customers |
US8527107B2 (en) | 2007-08-28 | 2013-09-03 | Consert Inc. | Method and apparatus for effecting controlled restart of electrical servcie with a utility service area |
US9177323B2 (en) | 2007-08-28 | 2015-11-03 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8996183B2 (en) | 2007-08-28 | 2015-03-31 | Consert Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US20090063228A1 (en) | 2007-08-28 | 2009-03-05 | Forbes Jr Joseph W | Method and apparatus for providing a virtual electric utility |
US20120245753A1 (en) | 2010-05-07 | 2012-09-27 | Forbes Jr Joseph W | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management to compensate for an over-generation condition |
US8442917B1 (en) | 2007-09-04 | 2013-05-14 | Ambit Holdings, L.L.C. | Energy distribution and marketing backoffice system and method |
WO2009046132A1 (en) | 2007-10-01 | 2009-04-09 | Gridpoint, Inc. | Modular electrical grid interface device |
US7706990B2 (en) | 2007-10-30 | 2010-04-27 | Michael Herzig | Systems and methods for measuring utilized generation of at-premise renewable power systems |
US20090125517A1 (en) | 2007-11-14 | 2009-05-14 | Qualcomm Incorporated | Method and system for keyword correlation in a mobile environment |
WO2009067259A1 (en) | 2007-11-25 | 2009-05-28 | Trilliant Networks, Inc. | Transport layer and model for an advanced metering infrastructure (ami) network |
US20090187344A1 (en) | 2008-01-19 | 2009-07-23 | Brancaccio Daniel S | System, Method, and Computer Program Product for Analyzing Power Grid Data |
US20090187499A1 (en) | 2008-01-21 | 2009-07-23 | David Mulder | System, Method and Computer Program Product for Providing Demand Response Functionality |
KR100960503B1 (en) | 2008-02-05 | 2010-06-01 | 엘에스산전 주식회사 | Intelligent Electronic Meters for Energy Demand Management and Demand Management Methods Using Them |
US8499247B2 (en) | 2008-02-26 | 2013-07-30 | Livingsocial, Inc. | Ranking interactions between users on the internet |
US8762364B2 (en) | 2008-03-18 | 2014-06-24 | Yahoo! Inc. | Personalizing sponsored search advertising layout using user behavior history |
US20130031201A1 (en) | 2008-04-03 | 2013-01-31 | Electro Industries/Gauge Tech | Intelligent electronic device communication solutions for network topologies |
CA2723892C (en) | 2008-05-09 | 2016-10-04 | Accenture Global Services Gmbh | Method and system for managing a power grid |
US20100076835A1 (en) | 2008-05-27 | 2010-03-25 | Lawrence Silverman | Variable incentive and virtual market system |
FR2932044B1 (en) | 2008-06-02 | 2010-08-20 | Sagem Comm | METHOD AND DEVICE FOR ALLOCATING MAC ADDRESSES IN A CURRENT COMMUNICATION NETWORK |
US8266075B2 (en) | 2008-06-16 | 2012-09-11 | International Business Machines Corporation | Electric vehicle charging transaction interface for managing electric vehicle charging transactions |
US20090313034A1 (en) | 2008-06-16 | 2009-12-17 | International Business Machines Corporation | Generating Dynamic Energy Transaction Plans |
WO2010008479A2 (en) | 2008-06-25 | 2010-01-21 | Versify Solutions, Llc | Aggregator, monitor, and manager of distributed demand response |
US8736225B2 (en) | 2008-08-20 | 2014-05-27 | San Diego Gas & Electronic Company | Modularized interface and related method for connecting plug-in electric vehicles to the energy grid |
US8639392B2 (en) | 2008-09-29 | 2014-01-28 | Battelle Memorial Institute | Electric power grid control using a market-based resource allocation system |
US20100082464A1 (en) | 2008-10-01 | 2010-04-01 | Keefe Robert A | System and Method for Managing the Consumption and Discharging of Power of Electric Vehicles |
WO2010048036A2 (en) | 2008-10-22 | 2010-04-29 | Terratrim, Inc. | Systems and methods for managing utility consumption |
EP2356529A1 (en) | 2008-10-28 | 2011-08-17 | Earth Aid Enterprises Llc | Methods and systems for determining the environmental impact of a consumer's actual resource consumption |
US9425620B2 (en) | 2009-01-12 | 2016-08-23 | Battelle Memorial Institute | Nested, hierarchical resource allocation schema for management and control of an electric power grid |
US8706650B2 (en) | 2009-01-14 | 2014-04-22 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
WO2010083334A1 (en) | 2009-01-14 | 2010-07-22 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
US8295989B2 (en) | 2009-02-03 | 2012-10-23 | ETM Electromatic, Inc. | Local power tracking for dynamic power management in weather-sensitive power systems |
US20100217549A1 (en) | 2009-02-26 | 2010-08-26 | Galvin Brian R | System and method for fractional smart metering |
US20100217550A1 (en) | 2009-02-26 | 2010-08-26 | Jason Crabtree | System and method for electric grid utilization and optimization |
US20100332373A1 (en) | 2009-02-26 | 2010-12-30 | Jason Crabtree | System and method for participation in energy-related markets |
US20100217642A1 (en) | 2009-02-26 | 2010-08-26 | Jason Crubtree | System and method for single-action energy resource scheduling and participation in energy-related securities |
US20100218108A1 (en) | 2009-02-26 | 2010-08-26 | Jason Crabtree | System and method for trading complex energy securities |
US20100217452A1 (en) | 2009-02-26 | 2010-08-26 | Mccord Alan | Overlay packet data network for managing energy and method for using same |
US8781809B2 (en) | 2009-03-31 | 2014-07-15 | Gridpoint, Inc. | Software modeling systems for metering and translating measurements |
US8719123B2 (en) | 2011-12-05 | 2014-05-06 | Thomas M. Rohrbaugh | Reporting circuit breaker and system |
US8315745B2 (en) | 2009-04-24 | 2012-11-20 | Hunter Defense Technologies, Inc. | Mobile micro-grid power system controller and method |
AU2010245273B2 (en) | 2009-05-08 | 2014-07-03 | Landis+Gyr Technology, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US20100293045A1 (en) | 2009-05-14 | 2010-11-18 | James Moeller Burns | Centralized Renewable Energy System With Fractional Ownership and a Method of Disaggregated Net Metering of its Renewable Energy Output Among Utility Customers Who Are Fractional Owners |
US8068938B2 (en) | 2009-05-15 | 2011-11-29 | General Electric Company | Method and system for managing a load demand on an electrical grid |
DE102009003173A1 (en) | 2009-05-15 | 2010-11-18 | Gip Ag | Method and device for directionally transmitting electrical energy in an electrical supply network |
US20100306033A1 (en) | 2009-06-01 | 2010-12-02 | Dror Oved | Electrical power metering and billing network |
US20120223840A1 (en) | 2009-06-05 | 2012-09-06 | Leviton Manufacturing Co., In. | Smart grid over power line communication network |
US8600556B2 (en) | 2009-06-22 | 2013-12-03 | Johnson Controls Technology Company | Smart building manager |
AU2010265883B2 (en) | 2009-06-25 | 2016-02-11 | Server Technology, Inc. | Power distribution apparatus with input and output power sensing and method of use |
US8369997B2 (en) | 2010-04-28 | 2013-02-05 | David Valin | Solar panel wind turbine communication server network apparatus method and mechanism |
MX342087B (en) | 2009-07-20 | 2016-09-13 | Allure Energy Inc | Energy management system and method. |
EP2473958A1 (en) | 2009-09-03 | 2012-07-11 | Essence Security International Ltd. | Methods and systems for managing electricity delivery and commerce |
DE102009040091A1 (en) | 2009-09-04 | 2011-03-10 | Voltwerk Electronics Gmbh | Island unit of an island power network for communicating energy requests with another island unit |
DE102009040090A1 (en) | 2009-09-04 | 2011-03-10 | Voltwerk Electronics Gmbh | Island unit for a power grid with a control unit for controlling an energy flow between the power generation unit, the energy storage unit, the load unit and / or the power grid |
GB0916022D0 (en) | 2009-09-11 | 2009-10-28 | Sgouridis Sgouris | Hybrid energy market and curency system for total energy management |
AU2010303947B2 (en) | 2009-10-09 | 2014-10-02 | Landis+Gyr Technology, Inc. | Apparatus and method for controlling communications to and from utility service points |
US8457802B1 (en) | 2009-10-23 | 2013-06-04 | Viridity Energy, Inc. | System and method for energy management |
US20110106327A1 (en) | 2009-11-05 | 2011-05-05 | General Electric Company | Energy optimization method |
KR101075958B1 (en) | 2009-11-16 | 2011-10-21 | 일진전기 주식회사 | Power exchange system of distributed generation and its method |
US20110130982A1 (en) | 2009-11-30 | 2011-06-02 | International Business Machines Corporation | Monitoring System for Power Grid Distributed Power Generation Devices |
US8332666B2 (en) | 2009-12-07 | 2012-12-11 | International Business Machines Corporation | Power management method and system |
AU2010330657A1 (en) | 2009-12-10 | 2012-08-02 | Lowfoot Inc. | System, method and computer program for energy use management and reduction |
US9331483B2 (en) | 2009-12-17 | 2016-05-03 | Battelle Memorial Institute | Thermal energy storage apparatus, controllers and thermal energy storage control methods |
US20110161250A1 (en) | 2009-12-31 | 2011-06-30 | Koeppel Adam R | Distributed energy generator monitor and method of use |
JP5487994B2 (en) | 2010-01-25 | 2014-05-14 | ソニー株式会社 | Power management apparatus and display method |
CA2731433C (en) | 2010-02-09 | 2018-05-15 | Open Access Technology International, Inc. | Systems and methods for demand response and distributed energy resource management |
KR101611296B1 (en) | 2010-02-09 | 2016-04-12 | 엘지전자 주식회사 | Method and apparatus for controlling power using a smart device |
US8315743B2 (en) | 2010-02-19 | 2012-11-20 | The Boeing Company | Network centric power flow control |
US8918842B2 (en) | 2010-02-19 | 2014-12-23 | Accenture Global Services Limited | Utility grid command filter system |
US8655499B2 (en) | 2010-02-19 | 2014-02-18 | The Boeing Company | Controlling virtual power circuits |
US8941261B2 (en) | 2010-02-22 | 2015-01-27 | Cisco Technology, Inc. | System and method for providing collaborating power controllers |
CN105976258B (en) | 2010-04-08 | 2019-12-10 | 能源管理公司 | Energy saving metering system and method |
GB2479955B (en) | 2010-04-29 | 2014-05-14 | Toshiba Res Europ Ltd | Data transmission apparatus and method |
US9310792B2 (en) | 2010-05-03 | 2016-04-12 | Battelle Memorial Institute | Scheduling and modeling the operation of controllable and non-controllable electronic devices |
KR101079929B1 (en) | 2010-07-02 | 2011-11-04 | 엘에스산전 주식회사 | Energy management system of electrical equipment, energy management device of electrical equipment, energy management method of electrical equipment |
WO2012015508A1 (en) * | 2010-07-29 | 2012-02-02 | Spirae, Inc. | Dynamic distributed power grid control system |
WO2012033854A2 (en) | 2010-09-07 | 2012-03-15 | Grid Net, Inc. | Power outage notification |
WO2012037906A1 (en) | 2010-09-25 | 2012-03-29 | Adunos Gmbh | System and method for recording data about quantities of energy and evaluating said data |
KR101736900B1 (en) | 2010-09-29 | 2017-05-17 | 삼성전자주식회사 | Electrical instrument, power management system having electrical instrument, and method for controlling the same |
KR101729019B1 (en) | 2010-10-12 | 2017-04-21 | 삼성전자주식회사 | Power management apparatus, power management system having power management apparatus and method for controlling the same |
US20120095841A1 (en) | 2010-10-15 | 2012-04-19 | Douglas Luckerman | Electronic Marketplace for Energy |
KR101801095B1 (en) | 2010-10-25 | 2017-11-24 | 삼성전자주식회사 | Power management apparatus, power management system having electrical instrument, and method for controlling the same |
US8667060B2 (en) | 2010-11-23 | 2014-03-04 | General Electric Company | Data collection from utility meters over advanced metering infrastructure |
KR101251554B1 (en) | 2010-12-17 | 2013-04-08 | 주식회사 케이티 | Charging/discharging system for solar light power generator in smart grid environment with real-time price, duplex convertor of charging/discharging system, and charging/discharging method for solar light power generator |
JP5221638B2 (en) | 2010-12-28 | 2013-06-26 | 株式会社東芝 | Control device, control method, and control program |
US8570999B1 (en) | 2011-01-19 | 2013-10-29 | Greenvity Communications, Inc. | System and method for communications in a network |
US8463449B2 (en) | 2011-01-28 | 2013-06-11 | Dean Sanders | Systems, apparatus, and methods of a solar energy grid integrated system with energy storage appliance |
US8512081B2 (en) | 2011-01-31 | 2013-08-20 | Amphenol Corporation | Multi-stage beam contacts |
US20120310800A1 (en) | 2011-06-03 | 2012-12-06 | Xia Mingyao | Smart-Grid Having PLC Networked Sensors |
KR101215186B1 (en) | 2011-03-08 | 2012-12-24 | 엘에스산전 주식회사 | System, Apparatus and Method for Energy Display |
US9281689B2 (en) | 2011-06-08 | 2016-03-08 | General Electric Technology Gmbh | Load phase balancing at multiple tiers of a multi-tier hierarchical intelligent power distribution grid |
US8965590B2 (en) | 2011-06-08 | 2015-02-24 | Alstom Grid Inc. | Intelligent electrical distribution grid control system data |
US20130006435A1 (en) | 2011-07-01 | 2013-01-03 | Berrios Javier C | Solar-Powered Apparatus for Wireless Network Control of an Array of Solar Tracking Devices and Systems Based Thereon |
US9207735B2 (en) | 2011-08-02 | 2015-12-08 | Gram Power, Inc. | Power management device and system |
US9094385B2 (en) * | 2011-08-05 | 2015-07-28 | Battelle Memorial Institute | Intelligent sensor and controller framework for the power grid |
US8862279B2 (en) | 2011-09-28 | 2014-10-14 | Causam Energy, Inc. | Systems and methods for optimizing microgrid power generation and management with predictive modeling |
US8751036B2 (en) | 2011-09-28 | 2014-06-10 | Causam Energy, Inc. | Systems and methods for microgrid power generation management with selective disconnect |
US10387985B2 (en) | 2011-10-07 | 2019-08-20 | Lennox Industries, Inc. | Distributed renewable energy metering |
US20130123998A1 (en) | 2011-11-14 | 2013-05-16 | Christopher Slaboszewicz King | Electrical power distribution systems, smart electricity meters, and methods of controlling local power connection |
US9204208B2 (en) | 2011-12-16 | 2015-12-01 | Basen Corporation | Smartgrid energy-usage-data storage and presentation systems, devices, protocol, and processes including an announcement protocol |
US20130173360A1 (en) | 2011-12-29 | 2013-07-04 | Robert Thatcher | Methods of allocating benefits received in response to generating energy within communities to community interests |
US9461471B2 (en) | 2012-06-20 | 2016-10-04 | Causam Energy, Inc | System and methods for actively managing electric power over an electric power grid and providing revenue grade date usable for settlement |
US9563215B2 (en) | 2012-07-14 | 2017-02-07 | Causam Energy, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US9513648B2 (en) | 2012-07-31 | 2016-12-06 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US8983669B2 (en) | 2012-07-31 | 2015-03-17 | Causam Energy, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US8849715B2 (en) | 2012-10-24 | 2014-09-30 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
-
2012
- 2012-05-15 US US13/471,589 patent/US9130402B2/en not_active Expired - Fee Related
-
2019
- 2019-05-17 US US16/415,322 patent/US11676079B2/en active Active
-
2023
- 2023-06-08 US US18/207,365 patent/US20230316158A1/en not_active Abandoned
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080183337A1 (en) * | 2007-01-31 | 2008-07-31 | Fifth Light Technology Ltd. | Methods and systems for controlling addressable lighting units |
Also Published As
Publication number | Publication date |
---|---|
US20120226384A1 (en) | 2012-09-06 |
US9130402B2 (en) | 2015-09-08 |
US11676079B2 (en) | 2023-06-13 |
US20190271955A1 (en) | 2019-09-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11735915B2 (en) | 2023-08-22 | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US20230316158A1 (en) | 2023-10-05 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US9069337B2 (en) | 2015-06-30 | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US10295969B2 (en) | 2019-05-21 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US20120245753A1 (en) | 2012-09-27 | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management to compensate for an over-generation condition |
US9881259B2 (en) | 2018-01-30 | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US20160370819A1 (en) | 2016-12-22 | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
AU2012212224A1 (en) | 2013-08-08 | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
CA2777147C (en) | 2016-08-09 | Controlled restart of electrical service within a utility service area |
US20240006884A1 (en) | 2024-01-04 | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
CA2904829C (en) | 2017-12-12 | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
2023-06-08 | AS | Assignment |
Owner name: CAUSAM ENERGY, INC., NORTH CAROLINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BCIP VENTURES LLC;REEL/FRAME:063896/0512 Effective date: 20131017 Owner name: BCIP VENTURES LLC, NORTH CAROLINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FORBES, JOSEPH W., JR.;REEL/FRAME:063896/0500 Effective date: 20121106 Owner name: CAUSAM ENTERPRISES, INC., NORTH CAROLINA Free format text: CHANGE OF NAME;ASSIGNOR:CAUSAM ENERGY, INC.;REEL/FRAME:063929/0200 Effective date: 20180212 |
2023-07-02 | STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
2024-02-27 | STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
2024-09-05 | STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |